This document outlines an incentive option plan for the overhaul and repair of T53-L-703 engines. Key details include an evaluation process to determine contractor performance on critical service metrics for the potential award of additional contract years. Performance will be assessed during years two and three of the basic contract period against metrics such as completion of deficiency reports within technical order timelines and turnaround times. Contractors can earn consideration for incentive option one by satisfactorily meeting the metrics in year two, and earn incentive option two by also satisfactorily meeting the metrics in year three. The incentive option determining official makes the final decision regarding awarding the options. Appendices provide templates for the government and contractor teams to submit evaluation summary reports assessing performance against the metrics.

View the file

Other files for this federal contract opportunity

Other files attached to T53-L-703 Engine Overhauls / Repairs, newest first.
File Type Posted
T53PWSJuly2020.pdf PDF
FA8124-20-R-0002 Questions and Answers.pdf PDF
FA812420R0002_______0001.pdf PDF
T53_DID_A007_DI_ALSS_80728A_Production_Report.pdf PDF
T53_DID_A001_DI_MGMT_80227_Transition_PhaseIn.pdf PDF
T53_CDRL_A005_CEMS_Reporting_CAMS.pdf PDF
Appendix_C_T53_ITO_10Jun20.docx DOCX document
T53_CDRL_A010_Teardown_Deficiency_Report.pdf PDF
T53_DID_A014_DI_NDTI_80809B_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_CDRL_A011_Failure_Analysis.pdf PDF
T53_DID_A009_DI_ADMN_81250A_PMR_Minutes.pdf PDF
T53_DID_A003_DI_MGMT_81326_CEMS.pdf PDF
T53_PWS_Attachment_B_CEMS_Access_Process_for_New_Contractor.pdf PDF
T53_DID_A010_DI_ALSS_81534_Teardown_Deficiency_Report.pdf PDF
T53_DID_A012_DI_MGMT_80628_Records_Maintenance.pdf PDF
T53_CDRL_A008_PMR_Agenda.pdf PDF
T53_CDRL_A014_Attachment_1_Test_Cell_Run_Data.xlsx XLSX spreadsheet
T53_DID_A011_DI_ALSS_81534_Failure_Analysis.pdf PDF
T53_CDRL_A001_Contractor_Progress_Report_Transition_PhaseIn.pdf PDF
T53_DID_A006_DI_ALSS_81534_Teardown_Report.pdf PDF
T53_2_YEAR_DEPOT_HISTORY_Feb2020.xlsx XLSX spreadsheet
T53_CDRL_A006_Teardown.pdf PDF
T53_DID_A013_DI_MGMT_81642_Small_Business_Reporting.pdf PDF
T53_DID_A008_DI_ADMN_81249A_PMR_Agenda.pdf PDF
T53_CDRL_A014_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_DID_A005_DI_ALSS_81534_CEMS.pdf PDF
T53_CDRL_A002_CEMS_Data_Reporting.pdf PDF
T53_PWS_ATTACHMENT_A_CDRLS_DIDS_SUMMARY_JAN20.xls XLS spreadsheet
T53_CDRL_A004_CEMS_TCTO_Reporting.pdf PDF
T53_CDRL_A003_CEMS_SRAN.pdf PDF
FA812420R0002.pdf PDF
T53_DID_A004_DI_MGMT_81325A_CEMS.pdf PDF
T53_CDRL_A009_PMR_Minutes.pdf PDF
Appendix_D_T53_Eval_10Jun20.docx DOCX document
T53_DID_A002_DI_MGMT_81324A_CEMS.pdf PDF
T53_CDRL_A007_Production_Report.pdf PDF
T53_CDRL_A013_Small_Business_Subcontractor_Report.pdf PDF
T53_APPENDIX_A_PWS_MAR2020.docx DOCX document
Appendix_B_T53_Pricing_Matrix_25Feb20.xlsx XLSX spreadsheet
T53_CDRL_A012_Records_Maintenance.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Incentive Option Plan

INCENTIVE OPTIONS PLAN

FOR THE

OVERHAUL AND REPAIR OF T53-L-703 Engines

PREPARATION DATE: 8 Apr 20

PREPARATION ORGANIZATION:

AFLCMC/LPSC

TINKER AFB, OK

Incentive Option Determining Official (IODO) Approval of Incentive Plan:

_______________________________________________________
CHARLES W. DARNELLDate

Chief, Propulsion Sustainment Division

1. INTRODUCTION

a. This Incentive Options Plan describes the process for evaluating Contractor performance in earning the three year and two year incentive options for the T53-L-703, hereinafter referred to as T53, engine maintenance workload. The purpose of this plan is to outline the organization, procedures, and evaluation period for implementing the incentive option provisions of the contract.

b. Incentive Option Evaluation

i. First evaluation period is beginning of year 3 which evaluates performance during year 2 based on meeting Table 1 critical Service Summary (SS) Metrics (outlined below). If satisfactory rating is gained, the Incentive Option Determining Official (IODO) may approve Incentive Option 1. If unsatisfactory rating is gained, the contractor will lose Incentive Option 2.

ii. Second evaluation period is beginning of year 4 which evaluates performance during year 3 based on meeting the SS Metrics. If satisfactory rating is gained, and the contractor had previously been awarded Incentive Option 1, then the IODO may approve Incentive Option 2. If satisfactory rating is gained and the contractor had previously lost Incentive Option 2, then the IODO may approve Incentive Option 1. If unsatisfactory rating is gained, the contractor will lose Incentive Option 1.

iii. The Government retains the right to exercise the incentive options or not regardless of rating, if it is in the Government’s best interest.

Table 1 – SS Metrics:
Rated Area with Satisfactory achievement of Service Summary Metrics

SS-2 Completion of Deficiency Reports within Technical Order Timelines

SS-4 No more than two validated customer complaints

SS-5 Comply with designated turnaround time

c. Figures 1 and 2 below outline the timing of evaluation and treatment of incentive options.

Figure 1 – Evaluation Timing

Figure 2 – Incentive Option Scenarios

2. DEFINITION OF TERMS

a. Incentive Option Determining Official (IODO): The individual who makes the final determination as whether consideration for award of an incentive option has been earned by the Contractor. The IODO is AFLCMC/LPS Director or Deputy at Tinker AFB, OK. The decisions to consider award of an Incentive Option by the IODO are final and are not subject to FAR 52.233-1, Disputes. Incentive Options 1 and 2 set forth in the contract are the maximum amount of incentive options for which consideration for award can be earned over the entire contract performance period. The IODO shall have 60 workdays upon receipt of Government Team review of consideration package to make the final decision.

b. Quality Assurance Specialist(s) (QAS): The individual(s) within DCMA assigned to monitor the contractor’s performance on a continuing basis.

c. Program Manager (PM): The individual appointed to manage the T53 program under the contract.

d. Procurement Contracting Officer (PCO): An individual with the authority to enter, administer, and/or terminate contracts and make related determinations and findings.

e. Contract Specialist: The individual in the Contracting Office assigned to monitor the contract.

3. PROCEDURES

a. DCMA, Government PCO, and Government PM should be made aware of all users’ comments regarding the Contractor’s performance.

b. DCMA, PCO, and PM shall make periodic observations of the contractor’s performance in accordance with Table 1 SS Metrics. The periodic reviews will be used to identify any contractor deficiencies which will be communicated to the contractor via interim letter(s) as required, which addresses areas needing improvement. A letter may also be issued any time it is deemed necessary to highlight areas of Government concern. For each letter issued, the Contractor shall provide a written response within 15 calendar days from the date of the government notice. The response should set forth plans for increasing effectiveness in the areas addressed or explain why it is not feasible to do so.

c. Meeting SS Metrics across years 2 and 3 of the basic period ratings will be used to determine award of the incentive options. Basic year 1 shall be considered a grace period in which a mock review will be conducted at the beginning of year 2 as practice and in preparation for the official evaluation ratings to be performed for year 2 (1st evaluation at beginning of year 3) and year 3 (2nd evaluation at the beginning of year 4) of the contract basic period. The Government team shall prepare the annual Evaluation Summary Report (ESR) in the format shown in Appendix 1. The Contractor shall prepare the ESR at Appendix 2 to assess the Contractor’s performance twice yearly (every six months) throughout the rating year period so that feedback / corrective actions may be applied. The report shall include significant ratings for each of the Service Summary Metrics listed in this plan. The QAS & contractor will submit reports within 15 days and then the Government PM, PCO and CS will provide feedback to the contractor to prepare package for IODO yearly for the period being evaluated beginning at years 3 and 4 respectively. The contractor’s yearly self-evaluation and the Government final rating shall be submitted to the IODO for final decision. The IODO shall consider the information presented along with any other pertinent information available and reach a decision within 90 workdays after the beginning of option years 3 and 4 respectively, as to whether consideration for award of an incentive option has been earned. The IODO makes the final determination of incentive option award.

d. Within 5 business days after the IODO decision, the PCO shall issue a letter notifying the Contractor of the decision. This letter will address the results of the evaluation and the key factors in the evaluation, noting any areas that did not meet the satisfactory rating for the evaluation period. Even if the PCO’s notification letter states that favorable consideration for award of incentive options have been earned, this notification does not constitute the exercise of incentive option(s) nor does such notification require the Government to exercise the incentive option(s). Exercise of any Incentive Option shall be at the discretion of the PCO, in accordance with FAR 17.207, and shall be executed by modification to the contract.

e. The IODO may unilaterally change this plan prior to the beginning of the evaluation period. In addition, the Contractor may recommend changes to the plan no later than 60 calendar days prior to the beginning of the evaluation period. The contractor shall be notified of changes to the plan by the PCO, in writing, before the start of the affected evaluation period. Changes to this plan that are applicable to the evaluation period will be incorporated by the mutual consent of both parties.

4. CRITERIA

To earn favorable consideration for award of Incentive Option(s), the Contractor must be evaluated favorably by the DCMA and Contracting Office to meet SS Metrics from years 2-3 of the basic period. The satisfactory rating shall be judged on performance meeting contractual requirements. Satisfactory rating shall consider the contractual performance of the element or sub-element that contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory in meeting the metrics listed in Table 2 below. Failure to achieve the satisfactory rating for each SS Metric during the evaluation period will result in the Contractor not earning consideration for the incentive option(s), unless the IODO determines via other pertinent information that an incentive option will be earned.

Table 2 – SS Metrics Defined

OBJECTIVE
PWS REFERENCE
THRESHOLD
METHOD OFSURVEILLANCE
SS-2: The Contractor shall investigate and document PQDR findings, using JDRS, on all design and quality control (material) deficiencies found IAW the procedures of T.O. 00- 35D-54.
Para 1.12.4
The Contractor shall complete investigations within the following timelines: 15 calendar days from receipt of asset for Category I Mishap, 30 calendar days from receipt of asset for Category II Mishap, 20 calendar days from receipt of asset for Category I DR, and 30 calendar days from receipt of asset for Category II DR.
Government personnel querying the JDRS system to subtract the Investigation Completion Date from the DR Investigation Start Date. Sampling calculation queries will be made per each DR investigation event.
SS-4: The Contractor shall have and maintain a program management structure to accomplish administrative planning, coordination of program requirements, and to optimize workflow by organizing, directing, and controlling production and supply actions.
Para 1.9.1
The Contractor shall receive no more than two (2) MAJCOM or Program Office customer complaints validated by PCO or ACO per quarter. DCMA Level 1 and 2 Corrective Action Reports (CARs) will not be counted as customer complaints. Only DCMA Level 3 and 4 CARs will be counted as DCMA customer complaints.
Sampling Method for SS-4 will occur on a 100% basis upon receipt of a customer complaint as validated by Government personnel.

SS-5: The Contractor shall comply with the designated turn around times established in below paragraphs to Section 1.7.

Para 1.7 and all sub paras.
The Contractor shall produce CLINs (in aggregate) at a minimum of 90% of the specified turn around time outlined in the PWS. On an annual basis, it will be determined if the Contractor met the 90% minimum by dividing the total quantity of end item CLINs delivered on time by the total number of end item CLINs required to be delivered. For example, at the conclusion of the year of performance, if the Contractor was required to deliver an aggregate total of 1000 end items across all CLINs and delivered 960 on time, the Contractor’s on time delivery would be 96%.
Government personnel comparing the calculation of actual delivery dates to the specified time in the PWS. Sampling will be done on a quarterly basis.

APPENDIX 1 - T53 INCENTIVE OPTION PLAN

GOVERNMENT TEAM EVALUATION SUMMARY REPORT

NOTE: Report shall be conducted quarterly for feedback reviews / corrective actions within the rating period and as a yearly summary for the official rating period evaluation. The IODO will only sign the yearly report.

Contractor: _____________________________________________________________ Contract Number: __________________________ Lead Evaluator: _______________ Office Symbol: ____________________________ Phone: ______________________ Evaluation Period: _______________________________________________________

POSITIVE EVENTS OR FACTORS

Service Summary Metrics:

SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NEGATIVE EVENTS OR FACTORS

Service Summary Metrics:

SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

COMMENTS

(Describe any factors that significantly influenced events noted above)

Lead Evaluator’s Signature: ____________________________ Date: __________________

Incentive Option Determining Official (IODO) Approval:

_______________________________________________________
CHARLES W. DARNELLDate

Chief, Propulsion Sustainment Division

APPENDIX 2 – T53 INCENTIVE OPTION PLAN

CONTRACTOR TEAM EVALUATION SUMMARY REPORT

NOTE: Report shall be conducted quarterly for feedback reviews / corrective actions within the rating period and as a yearly summary for the official rating period evaluation.

Contractor: ___________________________________________________________________ Contract Number: __________________________ Lead Evaluator: ____________________ Email: ____________________________________Phone: ____________________________ Evaluation Period:______________________________________________________________

POSITIVE EVENTS OR FACTORS

Service Summary Metrics:

SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NEGATIVE EVENTS OR FACTORS

Service Summary Metrics:

SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

COMMENTS

(Describe any factors that significantly influenced events noted above)

Contractor Evaluator Signature: ___________________________ Date: __________________ image1.emf image2.emf