T53_DID_A004_DI_MGMT_81325A_CEMS.pdf

PDF 23 KB Posted

Attached to
T53-L-703 Engine Overhauls / Repairs Federal contract opportunity
Solicitation number
FA8124-20-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

This document contains a Data Item Description and details of a federal contract opportunity. The Data Item Description outlines reporting requirements for contractors to report time compliance technical order status data to the Comprehensive Engine Management System, including required security clearances, system access procedures, and report formatting and content.

The federal contract opportunity is a competitive solicitation for maintenance, repair and overhaul of T53-L-703 engines to be performed at the contractor's facility. Proposals are due by July 23, 2020. The place of performance is a contractor facility. The solicitation is a total small business set aside issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base. Primary point of contact for the solicitation is Carrie Williams and secondary point of contact is Alexandra Crothers.

View the file

Other files for this federal contract opportunity

Other files attached to T53-L-703 Engine Overhauls / Repairs, newest first.
File Type Posted
FA8124-20-R-0002 Questions and Answers.pdf PDF
T53PWSJuly2020.pdf PDF
FA812420R0002_______0001.pdf PDF
T53_DID_A012_DI_MGMT_80628_Records_Maintenance.pdf PDF
T53_CDRL_A008_PMR_Agenda.pdf PDF
T53_CDRL_A014_Attachment_1_Test_Cell_Run_Data.xlsx XLSX spreadsheet
T53_DID_A011_DI_ALSS_81534_Failure_Analysis.pdf PDF
T53_CDRL_A001_Contractor_Progress_Report_Transition_PhaseIn.pdf PDF
T53_DID_A006_DI_ALSS_81534_Teardown_Report.pdf PDF
T53_2_YEAR_DEPOT_HISTORY_Feb2020.xlsx XLSX spreadsheet
T53_CDRL_A006_Teardown.pdf PDF
T53_DID_A013_DI_MGMT_81642_Small_Business_Reporting.pdf PDF
T53_DID_A008_DI_ADMN_81249A_PMR_Agenda.pdf PDF
T53_CDRL_A014_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_DID_A005_DI_ALSS_81534_CEMS.pdf PDF
T53_CDRL_A002_CEMS_Data_Reporting.pdf PDF
Appendix_E_T53_Incentive_Plan_8Apr20.docx DOCX document
T53_DID_A007_DI_ALSS_80728A_Production_Report.pdf PDF
T53_DID_A001_DI_MGMT_80227_Transition_PhaseIn.pdf PDF
T53_CDRL_A005_CEMS_Reporting_CAMS.pdf PDF
Appendix_C_T53_ITO_10Jun20.docx DOCX document
T53_CDRL_A010_Teardown_Deficiency_Report.pdf PDF
T53_DID_A014_DI_NDTI_80809B_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_CDRL_A011_Failure_Analysis.pdf PDF
T53_DID_A009_DI_ADMN_81250A_PMR_Minutes.pdf PDF
T53_DID_A003_DI_MGMT_81326_CEMS.pdf PDF
T53_PWS_Attachment_B_CEMS_Access_Process_for_New_Contractor.pdf PDF
T53_DID_A010_DI_ALSS_81534_Teardown_Deficiency_Report.pdf PDF
T53_PWS_ATTACHMENT_A_CDRLS_DIDS_SUMMARY_JAN20.xls XLS spreadsheet
T53_CDRL_A004_CEMS_TCTO_Reporting.pdf PDF
T53_CDRL_A003_CEMS_SRAN.pdf PDF
FA812420R0002.pdf PDF
T53_CDRL_A009_PMR_Minutes.pdf PDF
Appendix_D_T53_Eval_10Jun20.docx DOCX document
T53_DID_A002_DI_MGMT_81324A_CEMS.pdf PDF
T53_CDRL_A007_Production_Report.pdf PDF
T53_CDRL_A013_Small_Business_Subcontractor_Report.pdf PDF
T53_APPENDIX_A_PWS_MAR2020.docx DOCX document
Appendix_B_T53_Pricing_Matrix_25Feb20.xlsx XLSX spreadsheet
T53_CDRL_A012_Records_Maintenance.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Time Compliance Technical Order (TCTO) Reporting

Number: DI-MGMT-81325A Approval Date: 20060519 AMSC Number: F7568 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: F/OC-ALC/448EPSG PE Applicable Forms: AF Form 1559, AF Form 41, DD Form 2875 Use/relationship: TCTO reporting is required to report modifications and changes to engines and assemblies to the Comprehensive Engine Management System (CEMS).

TCTO reporting ensures that the worldwide inventory is complete and accurate.

a. This Data Item Description (DID) contains the requirements, to include access to the Internet, Air Force Portal, Global Integrated Maintenance Management System (GIMMS) Application and D042 (Comprehensive Engine Management System (CEMS)) mainframe for the purpose of reporting TCTO status for engines. It also contains the format and content preparation instructions for the data reporting generated by the specific and discrete task requirement as delineated in the contract.

b. This DID is applicable when contractors report TCTO status data to CEMS.

c. Publications referenced below are available on the CEMS web site, https://cews.tinker.af.mil, at the Oklahoma City Air Logistics Center (OC-ALC) 448 Eagle Propulsion Sustainment Group/PE (CEMS Division), Tinker AFB, OK. This is a secure web site, but can be accessed by providing information requested after clicking on

“CLICK HERE”.

d. This DID supersedes DI-MGMT-81325.

Requirements:

1. Reference Documents: The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract. Definitions and/or descriptions of the various data codes authorized for entry in the specified blocks of the Air Force Form 1534 are contained in United States Air Force Technical Order (T.O.) 00-25-254-1.

2. Format. Contractor format is acceptable for electronic reporting. Manually prepared data shall be in the format outlined on AF Form 1559.

3. Content. Inputs to CEMS: In order to accomplish the required access to systems for the purpose of reporting as referenced above, the following is required:

a. A minimum of a favorable National Agency Check (NAC) is required for any contractor accessing a Department of Defense (DoD) Information System. Procedures concerning Industrial Security Clearances and Investigations can be found at http://www.dss.mil/epsq or http://www.dss.mil/isec/psc_contractors.htm.

b. An AF Form 41 must be completed and faxed to Commercial 334 416-1040 to obtain an AF Portal account. The Form 41, as well as additional information may be obtained at https://www.my.af.mil, by accessing “View Account Requirements”.

https://cews.tinker.af.mil/ http://www.dss.mil/epsq http://www.dss.mil/isec/psc_contractors.htm https://www.my.af.mil/

c. After AF Portal access is obtained, a DD Form 2875 and a Nondisclosure Statement must be completed requesting access to CEMS and GIMMS and forwarded to the CEMS Program Office. The form and Nondisclosure Statement may be downloaded from https://cews.tinker.af.mil, by clicking on the “Forms” folder and clicking “System Access”. Instructions are included with the form.

d. In order to access GIMMS via the Internet, Port 992 must be opened on the user’s firewall. The CEMS Program Office (405) 736-7630, should be contacted for further information.

3.1. Specific Instructions. The AF Form 1559 shall contain the following:

a. Transaction Code. The TCTO status update code 7S is preprinted.

b. Sequence Number. The sequential control number assigned to each report prepared

c. Configured Item Identifier (CII). The CII of the item being reported.

d. Data Code. The seven (7) position data code obtained from the upper right corner of the TCTO cover page.

e. Status/How Malfunction (HOW MAL). For mail-in and direct line reporting this shall be the two (2) position status code. For all other reporting methods this shall be the three (3) position HOW MAL code.

f. Status Date. The julian date that TCTO compliance or status change was accomplished.

g. Accomplishing Stock Record Account Number (SRAN). The SRAN assigned to the reporting activity.

h. Command. The applicable major command (MAJCOM) and subcommand codes or contractor command code for the reporting activity.

i. Actual Manhours. The number of manhours expended to accomplish the TCTO.

j. Reversal Code. An “X” reverses TCTO status from closed (codes 01-05) to open (codes 06-18).

k. Reversal Hours. The actual number of manhours to the nearest tenth of an hour.

l. Work Center. The five (5) position work center code that identifies the organization within the SRAN that performed the TCTO action (May not be applicable to contractor reporting.)

m. Work Order Number. The eight (8) position work order number. (May not be applicable to contractor reporting.)

n. Serial Number. The item serial number.

p. Error Sequence Number. The sequence number from the transaction for which an error is being submitted.

q. Old Part Number. The current part number of the item to be modified. For non-parts tracked engines, this is the type, model, series, mission (TMSM) in lieu of the part number.

https://cews.tinker.af.mil/

r. New Part Number. The new part number when the TCTO directs re-identification to a new part number upon compliance. The new TMSM in lieu of the part number for non-parts tracked engines.

s. Remarks. An entry is not required for reporting to CEMS.

4. End of DI-MGMT-81325A.

File details come from the government source that posted it. Updated .