T2724 Change Order~8.docx

DOCX document 68 KB Posted

Attached to
Contract RFP/SC-SBE NJ|25-GNSV2-102794
Contract number
25-GNSV2-102794
Issued by
New Jersey

About this file

This document is a Change Order (#2) issued by the New Jersey Department of the Treasury, Division of Purchase and Property, regarding a contract assignment between Garden State Concrete (Assignor) and Garden State Pavement Solution LLC (Assignee). The contract involves state agencies within New Jersey, with the change order executed by Olu Olubanjo, a Procurement Specialist, on May 13, 2025.

The original contract (24-GNSV2-89816) has been reassigned to a new contract number (25-GNSV2-102794), with the contract period remaining from October 1, 2024 to September 30, 2027. Both the assignor and assignee are located at the same address (300 Commerce Drive, Tinton Falls, NJ 07753), and all contract pricing, terms, and conditions remain unchanged. The specific goods or services are not detailed in the document, but the change order ensures continuity of the existing contract under the new entity.

View the file

Other files

File Type Posted
T2724 Bid Amendment #3 3.13.2024~3.docx DOCX document
T2724 State Supplied Price Sheet~4.xlsx XLSX spreadsheet
T2724 Bid Amendment #4 3.28.24~1.docx DOCX document
T2724 Attachment 3 Site Maps 1-12.pdf PDF
T2724 Revised Method of Operation 5.7.25~7.docx DOCX document
T2724 Offer and Acceptance Letter_ Redacted.pdf PDF
T2724 Bid Amendment 1 1.18.2024~1.docx DOCX document
T2724 Final Bid Solicitation~12.docx DOCX document
T2724 Method of Operation~11.docx DOCX document
T2724 Price List 10.1.2024~4.xlsx XLSX spreadsheet
T2724 Revised Price List 5.7.2025~7.xlsx XLSX spreadsheet
T2724 Bid Amendment #2 2.22.2024~1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHILIP D. MURPHY

Governor State of New Jersey

DEPARTMENT OF THE TREASURY

DIVISION OF PURCHASE AND PROPERTY

OFFICE OF THE DIRECTOR

33 WEST STATE STREET

P. O. BOX 039

TRENTON, NEW JERSEY 08625-0039

ELIZABETH MAHER MUOIO

State Treasurer

TAHESHA L. WAY

Lt. Governor

AMY F. DAVIS, ESQ.

Acting Director https://www.njstart.gov Telephone (609) 292-4886 / Facsimile (609) 984-2575

CHANGE ORDER #2

SOLICITATION #23DPP00844

Contract #: T2724/24-GNSV2-89816

TO:
All Using Agencies
DATE:
May 13, 2025
FROM:
Olu Olubanjo, Procurement Specialist
SUBJECT:
Contract Assignment from Garden State Concrete., Assignor to Garden State Pavement Solution LLC., Assignee
CONTRACT PERIOD:
Original Term: October 1, 2024 to September 30, 2027

Please be advised that the Contract # 24-GNSV2-89816, previously assigned to:

Garden State Concrete, Assignor 300 Commerce Drive. Tinton Falls, NJ 07753 has been assigned to:

Garden State Pavement Solution LLC, Assignee 300 Commerce Drive. Tinton Falls, NJ 07753

The new Contract # is: 25-GNSV2-102794

As such, all references to Contract 24-GNSV2-89816 has been changed to reflect the new Contract 25-GNSV2-102794

All Contract pricing, terms and conditions remain the same.

Please retain a copy of this Amendment with the Notice of Award.

image1.png

File details come from the government source that posted it. Updated .