T0121 19DPP00402 Breakaway U-Post Sign Supports Bid Solicitation REVISED.docx
DOCX document 329 KB Posted
- Attached to
- T0121 Breakaway U-Post Sign Supports
- Solicitation number
- 19DPP00402
- Issued by
- Mercer County, New Jersey
About this file
This document is a bid solicitation issued by the New Jersey Department of the Treasury Division of Purchase and Property on behalf of the New Jersey Department of Transportation for breakaway U-Post steel sign supports. The intent is to award master blanket purchase orders to responsible vendors whose quotes conform to the requirements and are most advantageous to the State. There are four groups of breakaway U-Post steel sign supports and associated hardware itemized across 51 price lines. Vendors must submit quotes either electronically through the NJSTART system or via hard copy by October 18, 2019 at 2:00 PM Eastern Time. There is no mandatory pre-quote conference or site visit. The State may award any and all price lines, and reserves the right to separately procure individual requirements during the blanket purchase order term.
Pricing must be firm for 90 days. There are no set-asides for this procurement. Vendors must provide manufacturer certifications confirming their products meet the specified requirements, as well as a letter from the Federal Highway Administration showing approval of the offered systems. Vendors may extend the resulting blanket purchase orders to cooperative purchasing program participants. The blanket purchase orders will have an initial term with an option to extend.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T0121 19DPP00402 Breakaway U-Post Sign Supports Bid Solicitation~1.docx | DOCX document | |
| Ownership Disclosure Form~7.pdf | ||
| Cooperative Purchasing Form~12.pdf | ||
| Bid Solicitation Checklist~4.docx | DOCX document | |
| T0121 Bid Amendment 2.docx | DOCX document | |
| T0121 Bid Amendment 1.docx | DOCX document | |
| Sketch for Price Lines 42 through 51.pdf | ||
| T0121 Bid Amendment 4.docx | DOCX document | |
| Disclosure of Investments in Iran Form~5.pdf | ||
| Disclosure of Investigations Form~5.pdf | ||
| T0121 Bid Amendment 3.docx | DOCX document | |
| T0121 19DPP00402 Breakaway U-Post Sign Supports Bid Sol REVISED 11.1~1.docx | DOCX document | |
| T0121 19DPP00402 Breakaway U-Post Sign Supports Price Sheet~1.xlsx | XLSX spreadsheet | |
| T0121 19DPP00402 Breakaway U-Post Sign Supports Price Sheet 11.1.19~2.xlsx | XLSX spreadsheet | |
| Bidder Data Sheet~8.pdf | ||
| Offer and Acceptance~11.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Bid Solicitation # | 19DPP00402 |
| For: | |
| T0121 Breakaway U-Post Sign Supports |
| Event |
| Date |
| Time |
Vendor’s {Bidder’s} Electronic Question Due Date (Refer to Bid Solicitation Section 1.3.1 for more information.)
| 9/11/2019 |
| 2:00 PM |
Mandatory/Optional Pre-Quote Conference (Refer to Bid Solicitation Section 1.3.5 for more information.)
Not applicable to this procurement.
Mandatory/Optional Site Visit (Refer to Bid Solicitation Section 1.3.4 for more information.)
Not applicable to this procurement.
Quote Submission Date (Refer to Bid Solicitation Section 1.3.2 for more information.)
10/4/2019 10/18/2019
2:00 PM
Dates are subject to change. All times contained in the Bid Solicitation refer to Eastern Time. All changes will be reflected in Bid Amendments to the Bid Solicitation posted on www.njstart.gov.
☐ Small Business Set-Aside Category For Goods and Services:
☐ I ☐ II ☐ III
For Construction:
☐ IV ☐ V ☐ VI
Status
☒ Not Applicable
☐ Entire Blanket P.O.
☐ Partial Blanket P.O.
☐ Subcontracting Only
☐ Disabled Veteran-Owned Business Set-Aside
Bid Solicitation Issued By:
State of New Jersey Department of the Treasury Division of Purchase and Property Trenton, New Jersey 086250230 Using Agency/Agencies:
State of New Jersey NJ Department of Transportation Cooperative Purchasing Members
Date: 8/28/2019 10/4/2019
Table of Contents
| 1.0 | INFORMATION FOR VENDORS {BIDDERS} | 6 |
| 1.1 | PURPOSE AND INTENT | 6 |
| 1.2 | BACKGROUND | 9 |
| 1.3 | Key Events | 9 |
| 1.3.1 | ELECTRONIC QUESTION AND ANSWER PERIOD | 9 |
| 1.3.2 | SUBMISSION OF QUOTES | 10 |
| 1.3.3 | VENDOR {BIDDER} SUPPORT | 10 |
| 1.3.4 | MANDATORY/OPTIONAL SITE VISIT | 11 |
| 1.3.5 | MANDATORY/OPTIONAL PRE-QUOTE CONFERENCE | 11 |
| 1.3.6 | PRE-QUOTE DOCUMENT REVIEW | 11 |
| 1.4 | ADDITIONAL Information | 11 |
| 1.4.1 | BID AMENDMENTS: Revisions to this BID SOLICITATION | 11 |
| 1.4.2 | VENDOR {BIDDER} Responsibility | 11 |
| 1.4.3 | COST Liability | 11 |
| 1.4.4 | CONTENTS of QUOTE | 11 |
| 1.4.5 | ANNOUNCEMENT OF QUOTE INFORMATION | 12 |
| 1.4.6 | PRICE Alteration In QUOTES | 12 |
| 1.4.7 | QUOTE ERRORS | 13 |
| 1.4.8 | JOINT Venture | 14 |
| 1.4.9 | Reciprocity for Jurisdictional Vendor Preference | 14 |
| 1.4.10 | QUOTE ACCEPTANCES AND REJECTIONS | 14 |
| 1.4.11 | ELECTRONIC SIGNATURES | 14 |
| 2.0 | DEFINITIONS | 15 |
| 2.1 | CROSSWALK | 15 |
| 2.2 | General Definitions | 15 |
| 2.3 | BLANKET P.O.-specific definitions/ACRONYMS | 18 |
| 3.0 | SCOPE OF WORK | 19 |
| 3.1 | Description of u-post signs | 19 |
| 3.2 | Group 1 – Price Lines 1 through 17 | 19 |
| 3.2.1 | TYPE 1: BREAKAWAY STEEL U-POST SIGN SUPPORTS – Price Lines 1 through 14 | 19 |
| 3.2.2 | soil anchor plates – price line 15 | 20 |
| 3.2.3 | fasteners and other breakaway hardware – Price Line 16 and 17 | 20 |
| 3.3 | group 2 – price lines 18 through 34 | 20 |
| 3.3.1 | TYPE 2: BREAKAWAY STEEL U-POST SIGN SUPPORTS – Price Lines 18 through 31 | 20 |
| 3.3.2 | soil anchor plates – price line 32 | 21 |
| 3.3.3 | fasteners and other breakaway hardware – Price Line 33 and 34 | 21 |
| 3.4 | group 3 – price lines 35 through 41 | 21 |
| 3.4.1 | OMNI DIRECTIONAL BREAKAWAY BRACKETS AND ASSOCIATED HARDWARE – Price Lines 35 through 41 | 21 |
| 3.5 | group 4 – price lines 42 through 51 | 22 |
| 3.5.1 | UPRIGHT BEAM POST FOR LARGER AND HIGHER SIGNS – Price Lines 42 through 51 | 22 |
| 3.6 | galvanized finish – price lines 1 through 51 | 22 |
| 3.7 | packaging and shipping | 22 |
| 3.8 | INSPECTION AND TESTING | 23 |
| 3.9 | DELIVERY | 23 |
| 3.10 | BRAND NAMES | 23 |
| 3.11 | CURRENT PRODUCTION ITEMS | 23 |
| 3.12 | REPLACEMENT OF UNSATISFACTORY PRODUCT | 24 |
| 3.13 | substitution of product | 24 |
| 3.14 | ENERGY STAR REQUIREMENTS | 24 |
| 3.15 | CERTIFICATION | 24 |
| 3.16 | RECYCLED PRODUCT | 24 |
| 3.17 RECYCLING CERTIFICATION | 24 | |
| 4.0 | QUOTE PREPARATION AND SUBMISSION | 25 |
| 4.1 | General | 25 |
| 4.2 | QUOTE Delivery and Identification | 25 |
| 4.3 | NJSTART electronic submission VS. hard copy SUBMISSION INSTRUCTION | 25 |
| 4.3.1 | NJSTART SUBMISSION OF QUOTE | 25 |
| 4.3.2 | HARD COPY SUBMISSION | 26 |
| 4.4 | QUOTE Content | 27 |
| 4.4.1 | Forms, rEGISTRATIONS and CERTIFICATIONS required with QUOTE | 27 |
| 4.4.2 | Forms, REGISTRATIONS AND CERTIFICATIONS REQUIRED before BLANKET P.O. award and THAT SHOULD BE SUBMITTED with the QUOTE | 31 |
| 4.4.3 | SUBmittals | 32 |
| 4.4.4 | Financial Capability of the Vendor {Bidder} | 33 |
| 4.4.5 | STATE-SUPPLIED PRICE SHEET | 34 |
| 5.0 | SPECIAL CONTRACTUAL TERMS AND CONDITIONS APPLICABLE TO THE BLANKET P.O. | 40 |
| 5.1 | PRECEDENCE OF SPECIAL CONTRACTUAL TERMS AND CONDITIONS | 40 |
| 5.2 | BLANKET P.O. Term and Extension Option | 40 |
| 5.2.1 | PRODUCT ADDITION | 40 |
| 5.3 | BLANKET P.O. Transition | 40 |
| 5.4 | CHANGE ORDER | 41 |
| 5.5 | Vendor {contractor} Responsibilities | 41 |
| 5.6 | Claims and Remedies | 41 |
| 5.6.1 | Claims | 41 |
| 5.6.2 | Remedies | 41 |
| 5.6.3 | Remedies for failure to comply with material Blanket P.O. requirements | 41 |
| 5.7 | Items Ordered and Delivered | 41 |
| 5.8 | MANUFACTURING/PACKAGING REQUIREMENTS | 41 |
| 5.9 | ELECTRONIC PAYMENTS | 42 |
| 5.10 | Substitution or Addition of SubCONTRACTOR(s) | 42 |
| 5.11 | BLANKET P.O. Activity Report | 42 |
| 5.12 | PROGRAM EFFICIENCY ASSESSMENT FOR STATE USING AGENCIES | 43 |
| 5.13 | DISCLOSURE OF PRODUCT COMPOSITION | 43 |
| 5.14 | News Releases | 43 |
| 5.15 | Advertising | 43 |
| 6.0 | QUOTE EVALUATION | 44 |
| 6.1 | RIGHT TO WAIVE | 44 |
| 6.2 | director’s right of final quote acceptance | 44 |
| 6.2.1 | Tie-Breaking Criteria | 44 |
| 6.3 | STATE'S RIGHT TO INSPECT VENDOR {BIDDER} FACILITIES | 44 |
| 6.4 | Clarification of Quote / STATE'S RIGHT TO REQUEST FURTHER INFORMATION | 44 |
| 6.5 | Oral Presentation | 44 |
| 6.6 | Evaluation Criteria | 45 |
| 6.7 | QUOTE discrepancies | 45 |
| 6.7.1 | Evaluation of the QUOTES | 45 |
| 6.8 | Negotiation and Best and Final Offer (BAFO) | 45 |
| 6.9 | “REQUEST FOR REVISION” WITHIN NJSTART | 46 |
| 6.10 | POOR PERFORMANCE | 46 |
| 7.0 | BLANKET P.O. AWARD | 47 |
| 7.1 | DOCUMENTS REQUIRED BEFORE BLANKET P.O. AWARD | 47 |
| 7.1.1 | Requirements of Public Law 2005, CHAPTER 51, N.J.S.A. 19:44A-20.13 - N.J.S.A. 19:44A-20.25 (Formerly Executive Order NO. 134), EXECUTIVE ORDER No. 117 (2008) and N.J.A.C. 17:12-5 et seq. | 47 |
| 7.1.2 | SOURCE DISCLOSURE REQUIREMENTS | 47 |
| 7.1.3 | AFFIRMATIVE Action | 48 |
| 7.1.4 | BUSINESS REGISTRATION | 48 |
| 7.2 | FINAL BLANKET P.O. AWARD | 48 |
| 7.2.1 | AWARDS FOR TYPE 1 STEEL U-POSTS (PRICE LINES 1 through 17) | 48 |
| 7.2.2 | AWARDS FOR TYPE 2 (PRICE LINES 18 through 34) | 48 |
| 7.2.3 | AWARDS FOR TYPE B OMNI DIRECTIONAL BREAKAWAY BRACKETS AND COUPLINGS (PRICE LINES 35 through 41) | 48 |
| 7.2.4 | AWARDS FOR STEEL UPRIGHT BEAMS (PRICE LINES 42 – 51) | 48 |
| 7.3 | INSURANCE CERTIFICATES | 49 |
| 7.4 | Performance SECURITY | 49 |
| 8.0 | BLANKET P.O. ADMINISTRATION | 50 |
| 8.1 | STATE CONTRACT MANAGER | 50 |
| 8.1.1 | state contract manager responsibilities | 50 |
| 8.1.2 | Coordination with the State Contract manager | 50 |
| 9.0 STATE OF NEW JERSEY STANDARD TERMS AND CONDITIONS | 51 | |
| 1. STANDARD TERMS AND CONDITIONS APPLICABLE TO THE CONTRACT | 51 | |
| 1.1 contract terms CROSSWALK | 51 | |
| 2. | STATE LAW REQUIRING MANDATORY COMPLIANCE BY ALL CONTRACTORS | 51 |
| 2.1 | BUSINESS REGISTRATION | 51 |
| 2.2 | ANTI-DISCRIMINATION | 52 |
| 2.3 | PREVAILING WAGE ACT | 52 |
| 2.5 | MACBRIDE PRINCIPLES | 52 |
| 2.6 | PAY TO PLAY PROHIBITIONS | 52 |
| 2.7 | POLITICAL CONTRIBUTION DISCLOSURE | 53 |
| 2.8 | STANDARDS PROHIBITING CONFLICTS OF INTEREST | 53 |
| 2.9 | NOTICE TO ALL CONTRACTORS SET-OFF FOR STATE TAX NOTICE | 54 |
| 2.10 | COMPLIANCE - LAWS | 54 |
| 2.11 | COMPLIANCE - STATE LAWS | 54 |
| 2.12 | Warranty of no solicitation on commission or contingent fee basis | 54 |
| 3. | STATE LAW REQUIRING MANDATORY COMPLIANCE BY CONTRACTORS UNDER CIRCUMSTANCES SET FORTH IN LAW OR BASED ON THE TYPE OF CONTRACT | 54 |
| 3.1 | COMPLIANCE - CODES | 54 |
| 3.2 | PUBLIC WORKS CONTRACTOR REGISTRATION ACT | 55 |
| 3.3 | PUBLIC WORKS CONTRACT - ADDITIONAL AFFIRMATIVE ACTION REQUIREMENTS | 55 |
| 3.4 | BUILDING SERVICE | 56 |
| 3.5 | THE WORKER AND COMMUNITY RIGHT TO KNOW ACT | 56 |
| 3.6 | SERVICE PERFORMANCE WITHIN U.S. | 56 |
| 3.7 | BUY AMERICAN | 57 |
| 4. | INDEMNIFICATION AND INSURANCE | 57 |
| 4.1 | INDEMNIFICATION | 57 |
| 4.2 | INSURANCE | 57 |
| 5. | TERMS GOVERNING ALL CONTRACTS | 58 |
| 5.1 | CONTRACTOR IS INDEPENDENT CONTRACTOR | 58 |
| 5.2 | CONTRACT AMOUNT | 58 |
| 5.3 | CONTRACT TERM AND EXTENSION OPTION | 58 |
| 5.4 | STATE’S OPTION TO REDUCE SCOPE OF WORK | 58 |
| 5.5 | CHANGE IN LAW | 59 |
| 5.6 | SUSPENSION OF WORK | 59 |
| 5.7 | TERMINATION OF CONTRACT | 60 |
| 5.8 | SUBCONTRACTING OR ASSIGNMENT | 60 |
| 5.9 | NO CONTRACTUAL RELATIONSHIP BETWEEN SUBCONTRACTORS AND STATE | 60 |
| 5.10 | MERGERS, ACQUISITIONS | 60 |
| 5.11 | PERFORMANCE GUARANTEE OF CONTRACTOR | 61 |
| 5.12 | DELIVERY REQUIREMENTS | 61 |
| 5.13 | APPLICABLE LAW AND JURISDICTION | 61 |
| 5.14 | CONTRACT AMENDMENT | 62 |
| 5.15 | MAINTENANCE OF RECORDS | 62 |
| 5.16 | ASSIGNMENT OF ANTITRUST CLAIM(S) | 62 |
| 6 | 62 | |
| 6.1 | PRICE FLUCTUATION DURING CONTRACT | 62 |
| 6.2 | TAX CHARGES | 63 |
| 6.3 | PAYMENT TO VENDORS | 63 |
| 6.4 | OPTIONAL PAYMENT METHOD: P-CARD | 63 |
| 6.5 | NEW JERSEY PROMPT PAYMENT ACT | 63 |
| 6.6 | AVAILABILITY OF FUNDS | 64 |
| 7. | TERMS RELATING TO ALL CONTRACTS FUNDED, IN WHOLE OR IN PART, BY FEDERAL FUNDS | 64 |
| 7.1 | PROCUREMENT OF RECOVERED MATERIALS | 64 |
| 7.2 | EQUAL EMPLOYMENT OPPORTUNITY | 65 |
| 7.3 | DAVIS-BACON ACT, 40 U.S.C. 3141-3148, AS AMENDED | 67 |
| 7.4 | CONTRACT WORK HOURS AND SAFETY STANDARDS ACT, 40 U.S.C. 3701-3708 | 67 |
| 7.5 | RIGHTS TO INVENTIONS MADE UNDER A CONTRACT OR AGREEMENT | 68 |
| 7.6 | CLEAN AIR ACT, 42 U.S.C. 7401-7671Q, AND THE FEDERAL WATER POLLUTION CONTROL ACT, 33 U.S.C. 1251-1387, AS AMENDED | 68 |
| 7.7 | DEBARMENT AND SUSPENSION (EXECUTIVE ORDERS 12549 AND 12689) | 68 |
| 7.8 | BYRD ANTI-LOBBYING AMENDMENT, 31 U.S.C. 1352 | 68 |
INFORMATION FOR VENDORS {BIDDERS}
NOTICE: This Bid Solicitation is part of the NJSTART Procurement Program. The Vendor {Bidder} is advised to thoroughly read all sections, as many have been revised, and follow all instructions contained in this Bid Solicitation, including the instructions on the Bid Solicitation’s Offer and Acceptance Page and read through all Quick Reference Guides (QRGs) located on the NJSTART Vendor Support Page (http://www.state.nj.us/treasury/purchase/njstart/vendor.shtml), before preparing and submitting its Quote.
PURPOSE AND INTENT
This Bid Solicitation is issued by the Procurement Bureau, Division of Purchase and Property (Division), Department of the Treasury on behalf of the NJ Department of Transportation. The purpose of this Bid Solicitation is to solicit Quotes for breakaway U-Post steel sign supports.
The intent of this Bid Solicitation is to award Master Blanket Purchase Orders (Blanket P.O.s) to those responsible Vendors {Bidders} whose Quotes, conforming to this Bid Solicitation are most advantageous to the State, price and other factors considered. The State may award any and all price lines. The State, however, reserves the right to separately procure individual requirements that are the subject of the Blanket P.O. during the Blanket P.O. term, when deemed by the Director of the Division of Purchase and Property (Director) to be in the State’s best interest.
There are four (4) groups of breakaway U-Post steel sign supports and associated hardware, which are itemized as follows:
Group 1: Price Lines 1 - 17
| Price Line |
| Item Description |
| Unit of Measure |
| Number of Statewide Awards |
| 1 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 1- 1.12 LB/FT GALV. |
| Each |
| 1 |
| 2 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 1- 2.00 LB/FT GALV. |
| Each |
| 3 |
| U-POST SIGN/STEEL, SIZE 3.5 FT, TYPE 1- 2.50 LB/FT GALV. |
| Each |
| 4 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 1- 2.50 LB/FT GALV. |
| Each |
| 5 |
| U-POST SIGN/STEEL, SIZE 8 FT, TYPE 1- 2.50 LB/FT GALV. |
| Each |
| 6 |
| U-POST SIGN/STEEL, SIZE 10 FT, TYPE 1- 2.50 LB/FT GALV. |
| Each |
| 7 |
| U-POST SIGN/STEEL, SIZE 12 FT, TYPE 1- 2.50 LB/FT GALV. |
| Each |
| 8 |
| U-POST SIGN/STEEL, SIZE 14 FT, TYPE 1- 2.50 LB/FT GALV. |
| Each |
| 9 |
| U-POST SIGN/STEEL, SIZE 3.5 FT, TYPE 1- 4.00 LB/FT GALV. |
| Each |
| 10 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 1- 4.00 LB/FT GALV. |
| Each |
| 11 |
| U-POST SIGN/STEEL, SIZE 8 FT, TYPE 1- 4.00 LB/FT GALV. |
| Each |
| 12 |
| U-POST SIGN/STEEL, SIZE 10 FT, TYPE 1- 4.00 LB/FT GALV. |
| Each |
| 13 |
| U-POST SIGN/STEEL, SIZE 12 FT, TYPE 1- 4.00 LB/FT GALV. |
| Each |
| 14 |
| U-POST SIGN/STEEL, SIZE 14 FT, TYPE 1- 4.00 LB/FT GALV. |
| Each |
| 15 |
| SOIL ANCHOR PLATE/11 GAUGE STEEL, TYPE 1 |
| Each |
| 16 |
| BREAKAWAY SIGN SUPPORT SYSTEM/STEEL, TYPE 1, INCLUDES SPACER BAR, ALL HARDWARE, ALL FASTENERS AS PER BID SOLICITATION SECTION 3.2.3 |
| Each |
| 17 |
| BREAKAWAY SIGN SUPPORT SYSTEM/STEEL,TYPE 1, EXCLUDING SPACER BAR, INCLUDES ALL HARDWARE, ALL FASTENERS AS PER BID SOLICITATION SECTION 3.2.3 |
| Each |
Group 2: Price Lines 18 - 34
| Price Line |
| Item Description |
| Unit of Measure |
| Number of Statewide Awards |
| 18 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 2- 1.12 LB/FT GALV. |
| Each |
| 1 |
| 19 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 2- 2.00 LB/FT GALV. |
| Each |
| 20 |
| U-POST SIGN/STEEL, SIZE 5.0 FT, TYPE 2- 2.50 LB/FT GALV. |
| Each |
| 21 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 2- 2.50 LB/FT GALV. |
| Each |
| 22 |
| U-POST SIGN/STEEL, SIZE 8 FT, TYPE 2- 2.50 LB/FT GALV. |
| Each |
| 23 |
| U-POST SIGN/STEEL, SIZE 10 FT, TYPE 2- 2.50 LB/FT GALV. |
| Each |
| 24 |
| U-POST SIGN/STEEL, SIZE 12 FT, TYPE 2- 2.50 LB/FT GALV. |
| Each |
| 25 |
| U-POST SIGN/STEEL, SIZE 14 FT, TYPE 2- 2.50 LB/FT GALV. |
| Each |
| 26 |
| U-POST SIGN/STEEL, SIZE 5 FT, TYPE 2- 4.00 LB/FT GALV. |
| Each |
| 27 |
| U-POST SIGN/STEEL, SIZE 6 FT, TYPE 2- 4.00 LB/FT GALV. |
| Each |
| 28 |
| U-POST SIGN/STEEL, SIZE 8 FT, TYPE 2- 4.00 LB/FT GALV. |
| Each |
| 29 |
| U-POST SIGN/STEEL, SIZE 10 FT, TYPE 2- 4.00 LB/FT GALV. |
| Each |
| 30 |
| U-POST SIGN/STEEL, SIZE 12 FT, TYPE 2- 4.00 LB/FT GALV. |
| Each |
| 31 |
| U-POST SIGN/STEEL, SIZE 14 FT, TYPE 2- 4.00 LB/FT GALV. |
| Each |
| 32 |
| SOIL ANCHOR PLATE/11 GAUGE, STEEL, TYPE 2 |
| Each |
| 33 |
| BRACER BAR BREAKAWAY SYSTEM/STEEL, TYPE 2, INCLUDES 1" X 1" X 6" BRACER ALL HARDWARE, ALL FASTENERS, AS PER BID SOLICITATION SECTION 3.3.3 |
| Each |
| 34 |
| BREAKAWAY SIGN SUPPORT SYSTEM/STEEL TYPE 2, EXCLUDES SPACER BAR, INCLUDES ALL HARDWARE, ALL FASTENER AS PER BID SOLICITATION SECTION 3.3.3 |
| Each |
Group 3: Price Lines 35 - 41
| Price Line |
| Item Description |
| Unit of Measure |
| Number of Statewide Awards |
| 35 |
| OMNI DIRECTIONAL BREAKAWAY BRACKETS WITH HINGE ASSEMBLY (TRANSPO MODEL B525 OR APPROVED EQUAL) 6061 - T6 ALUMINUM |
| Each |
| 1 |
| 36 |
| OMNI DIRECTIONAL BREAKAWAY BRACKETS WITH HINGE ASSEMBLY (TRANSPO MODEL B650 OR APPROVED EQUAL) 6061 - T6 ALUMINUM |
| Each |
| 37 |
| BRACKET COUPLING & SPECIAL ASSEMBLY TYPE B (TRANSPO MODEL B525 OR EQUAL) (INCLUDES SPECIAL BOLT ASTM 449 1-8UNC HOT DIPPED GALVANIZED; SPECIAL COUPLING 1"-8UNC LP) AMS 6378D HOT DIPPED GALVANIZED; 14GA. X 1" HORSESHOE SHIM 18GA. X 1" HORSESHOE SHIM |
| Each |
| 38 |
| ANCHOR ASSEMBLY, TYPE B 1"-8UNC 304 STAINLESS STEEL FERNULE, AISC ROD 1045 (TRANSPO MODEL B525 OR APPROVED EQUAL) |
| Each |
| 39 |
| HINGE ASSEMBLY TYPE B525 INCLUDES HINGE PLATE AISI 4130 STEEL, ASTM 123 - HOT DIPPED GALVANIZED PACKAGE OF FOUR (4) |
| Each |
| 40 |
| HINGE ASSEMBLY TYPE B650 INCLUDES HINGE PLATE AISI 4130 STEEL, ASTM 123 - HOT DIPPED GALVANIZED PACKAGE OF FOUR (4) |
| Each |
| 41 |
| HINGE ASSEMBLY HARDWARE - TYPE B INCLUDES THE FOLLOWING 8 PCS. BOLT 3/4"-10 X 2 1/4" A325 HOT DIPPED GALVANIZED 8 PCS. LOCKWASHER 3/4" B18-21-1" HOT DIPPED GALVANIZED 8 PCS. NUT 3/4"-10UNC HEAVY HEX GRADE DH ALL MATERIAL ASTM A153 FITS BOTH B525 AND B650 HINGE ASSEMBLY |
| Each |
Group 4: Price Lines 42 - 51
| Price Line |
| Item Description |
| Unit of Measure |
| Number of Statewide Awards |
| 42 |
| HOT ROLLED STEEL BEAM W 6 X 12.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED A123 |
| Linear Foot |
| 1 |
| 43 |
| HOT ROLLED STEEL BEAM W 6 X 16.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 44 |
| HOT ROLLED STEEL BEAM W 8 X 18.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 45 |
| HOT ROLLED STEEL BEAM W 8 X 21.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 46 |
| HOT ROLLED STEEL BEAM W10 X 22.0# WIDE FLANGE BEAM CUT TO 22.5 FEET AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 47 |
| HOT ROLLED STEEL BEAM W10 X 26.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 48 |
| HOT ROLLED STEEL BEAM W12 X 26.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 49 |
| HOT ROLLED STEEL BEAM W14 X 30.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 50 |
| HOT ROLLED STEEL BEAM W18 X 35.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
| 51 |
| HOT ROLLED STEEL BEAM W18 X 40.0# WIDE FLANGE BEAM CUT TO LENGTH AND FLANGE DRILLED PER SKETCH FOR B525 OR B650 BRACKET ASSEMBLY HOT DIPPED GALVANIZED |
| Linear Foot |
NOTE: The Vendor {Bidder} shall submit with its Quote a manufacturer’s certification confirming that all items offered in response to this Bid Solicitation conform to the requirements set forth in Section 3.0 of this Bid Solicitation.
Manufacturer’s certifications shall be submitted on company letterhead and signed by an officer of the company.
The State of NJ Standard Terms and Conditions (SSTCs) accompanying this Bid Solicitation will apply to all Blanket P.O.s made with the State of New Jersey. These terms are in addition to the terms and conditions set forth in this Bid Solicitation and should be read in conjunction with them unless the Bid Solicitation specifically indicates otherwise.
The State of New Jersey (State) intends to extend the Blanket P.O.s awarded to the Division's Cooperative Purchasing Program participants. These participants include quasi-State entities, counties, municipalities, school districts, volunteer fire departments, first aid squads, independent institutions of higher learning, County colleges, and State colleges. In order for the State Blanket P.O. to be extended to Cooperative Purchasing Program participants, the Vendor {Bidder} must agree to the extension by executing the Cooperative Purchase Form. Also refer to Section 4.4.3.2 of this Bid Solicitation. Although the State, with the consent of the Vendor(s) {Bidder(s)}, is making the use of any Blanket P.O. resulting from this Bid Solicitation available to non-State Agencies, the State makes no representation as to the acceptability of any State Bid Solicitation terms and conditions under the Local Public Contracts Law or any other enabling statute or regulation.
BACKGROUND
This is a reprocurement of the product/services under Breakaway U-Post Sign Supports, presently due to expire on March 30th, 2020. Vendors {Bidders} interested in the current Blanket P.O. specifications and pricing information may review the current Blanket P.O. T0121 at www.njstart.gov by following these steps:
Go to: www.njstart.gov Select “Contract & Bid Search” Select “Contracts/Blankets” Under “Contract/Blanket Description” type in T0121, Click “Find It” The current Blanket P.O.s will appear under “Results”.
Vendors {Bidders} are cautioned that this new Bid Solicitation addresses current requirements.
notable change since the last bid solicitation
This Bid Solicitation has been revised since the last reprocurement of this commodity. Please thoroughly read the entire Bid Solicitation including all sub-sections.
Notable changes include, but are not limited to:
Section 4.4.3 Submittals The Vendor {Bidder} shall submit as part of its Quote a letter from the FHWA showing approval of the system bid by the Vendor {Bidder} as noted in Section 3.4 of this Bid Solicitation.
The Vendor {Bidder} shall submit with its Quote a manufacturer’s certification confirming that all items offered in response to this Bid Solicitation conform to the requirements set forth in Section 3.0 of this Bid Solicitation.
Section 4.4.3.3 Specification Data Sheets
Vendors {Bidders} should submit with its Quote specification data sheets for all products bid. The specification data sheets must document that its product bid meets or exceeds the requirements of the Bid Solicitation specifications.
In the event that the specification data sheets are not provided with a Vendor’s {Bidder’s} Quote, the Vendor {Bidder} shall also provide a manufacturer’s certification confirming that all specification data sheets provided for the items offered in response to this Bid Solicitation are/were valid and accurate at the time of Quote opening..
Key Events
ELECTRONIC QUESTION AND ANSWER PERIOD
The Division will electronically accept questions and inquiries from all potential Vendors {Bidders} via the “Q&A” Tab of the Bid Solicitation in NJSTART.
A. Questions should be directly tied to the Bid Solicitation and asked in consecutive order, from beginning to end, following the organization of the Bid Solicitation; and
B. Each question should begin by referencing the Bid Solicitation page number and section number to which it relates.
Vendors {Bidders} may refer to the QRG “Submit a Quote” for additional instruction. QRGs are located on the NJSTART Vendor Support Page.
A Vendor {Bidder} shall not contact the Using Agency and/or the Procurement Specialist directly, in person, by telephone or by e-mail, concerning this Bid Solicitation, prior to the final award of the Blanket P.O.
The cut-off date for electronic questions and inquiries relating to this Bid Solicitation is indicated on the Bid Solicitation cover sheet. In the event that questions are posed by Vendors {Bidders}, answers to such questions will be issued by Bid Amendment. Any Bid Amendment to this Bid Solicitation will become part of this Bid Solicitation and part of any Blanket P.O. awarded as a result of this Bid Solicitation. Bid Amendments to this Bid Solicitation, if any, will be posted as a File Attachment on the “Summary” page of the Bid Solicitation in NJSTART after the cut-off date. (See Bid Solicitation Section 1.4.1 for further information.)
EXCEPTIONS TO THE STATE OF NJ STANDARD TERMS AND CONDITIONS (SSTC)
Questions regarding the State of New Jersey Standard Terms and Conditions (SSTC) and exceptions to mandatory requirements must be posed during this Electronic Question and Answer period and shall contain the Vendor’s {Bidder’s} suggested changes and the reason(s) for the suggested changes.
SUBMISSION OF QUOTES
In order to be considered for award, the Quote must be received by the Procurement Bureau of the Division at the appropriate location by the required time. Vendors {Bidders} shall submit a Quote either electronically through NJSTART or via hard copy.
QUOTES NOT RECEIVED PRIOR TO THE QUOTE OPENING DEADLINE SHALL BE REJECTED. THE DATE AND TIME OF THE QUOTE OPENING ARE INDICATED ON THE BID SOLICITATION COVER SHEET AND ON THE “SUMMARY” TAB OF THE BID SOLICITATION WEBPAGE WITHIN NJSTART.
IF THE QUOTE OPENING DEADLINE HAS BEEN REVISED, THE NEW QUOTE OPENING DEADLINE SHALL BE SHOWN ON THE POSTED BID AMENDMENT AND ON THE “SUMMARY” TAB OF THE BID SOLICITATION WEBPAGE WITHIN NJSTART.
Procedural inquiries concerning the use of NJSTART may be directed to njstart@treas.nj.gov and/or (609) 341-3500.
The Division will not respond to substantive questions related to the Bid Solicitation or any other Blanket P.O. via this e-mail address or phone number. For inquiries related to substantive questions refer to Section 1.3.1 (Electronic Question and Answer Period).
VENDOR {BIDDER} SUPPORT
Vendors {Bidders} are strongly encouraged to visit the NJSTART Vendor Support Page, which contains Quick Reference Guides (QRGs), supporting videos, a glossary of NJSTART terms, and helpdesk contact information.
The Vendor {Bidder} should utilize the QRGs before attempting to submit its Quote using the NJSTART process. It is the Vendor’s {Bidder’s} responsibility to ensure that the NJSTART Quote and attachments have been properly submitted.
MANDATORY/OPTIONAL SITE VISIT
Not applicable to this procurement.
MANDATORY/OPTIONAL PRE-QUOTE CONFERENCE
Not applicable to this procurement.
PRE-QUOTE DOCUMENT REVIEW
Not applicable to this procurement.
ADDITIONAL Information
BID AMENDMENTS: Revisions to this BID SOLICITATION
In the event that it becomes necessary to clarify or revise this Bid Solicitation, such clarification or revision will be by Bid Amendment. Any Bid Amendment to this Bid Solicitation will become part of this Bid Solicitation and part of any Blanket P.O. awarded as a result of this Bid Solicitation.
There are no designated dates for release of Bid Amendments. Those Vendors {Bidders} who are on the bid holder list either through commodity code registration in NJSTART or by acknowledging the bid in NJSTART should receive notification of any Bid Amendment(s). If a Vendor {Bidder} is not on the bid holder list to receive notifications related to a Bid Solicitation, Bid Amendments are still viewable on the “Summary” page of the Bid Solicitation in NJSTART.
BID AMENDMENTS WILL BE ISSUED AS FILE ATTACHMENTS, AND ARE VIEWABLE ON THE “SUMMARY” PAGE OF THE BID SOLICITATION IN NJSTART. Vendors {Bidders} may refer to the QRG “Submit a Quote” for additional instructions. QRGs are located on the NJSTART Vendor Support Page.
It is the sole responsibility of the Vendor {Bidder} to be knowledgeable of all Bid Amendments related to this procurement. An interested Vendor {Bidder} should check the NJSTART “Open Bids” Tab on a daily basis to ensure review of the most updated information.
VENDOR {BIDDER} Responsibility
The Vendor {Bidder} assumes sole responsibility for the complete effort required in submitting a Quote in response to this Bid Solicitation. No special consideration will be given after Quotes are opened because of a Vendor’s {Bidder’s} failure to be knowledgeable as to all of the requirements of this Bid Solicitation.
COST Liability
The State assumes no responsibility and bears no liability for costs incurred by a Vendor {Bidder} in the preparation and submittal of a Quote in response to this Bid Solicitation.
CONTENTS of QUOTE
Quotes can be released to the public pursuant to N.J.A.C. 17:12-1.2(b) and (c), or under the New Jersey Open Public Records Act (OPRA), N.J.S.A. 47:1A-1 et seq., or the common law right to know.
After the opening of sealed Quotes, including Quotes submitted through the NJSTART electronic process, all information submitted by a Vendor {Bidder} in response to a Bid Solicitation is considered public information notwithstanding any disclaimers to the contrary submitted by a Vendor {Bidder}. Proprietary and confidential information may be exempt from public disclosure by OPRA and/or the common law. When the Bid Solicitation contains a negotiation component, the Quote will not be subject to public disclosure until a notice of intent to award a Blanket P.O. is announced.
As part of its Quote, a Vendor {Bidder} may designate any data or materials it asserts are exempt from public disclosure under OPRA and/or the common law, explaining the basis for such assertion. Vendor {Bidder} must provide a detailed statement clearly identifying those sections of the Quote that it claims are exempt from production, and the legal and factual basis that supports said exemption(s) as a matter of law. Please include a redacted copy of the Quote indicating the sections identified as confidential. The State will not honor any attempts by a Vendor {Bidder} to designate its entire Quote as proprietary, confidential and/or to claim copyright protection for its entire Quote.
The State reserves the right to make the determination as to what is proprietary or confidential, and will advise the Vendor {Bidder} accordingly. Any proprietary and/or confidential information in a Quote will be redacted by the State. Copyright law does not prohibit access to a record which is otherwise available under OPRA.
In the event of any challenge to the Vendor’s {Bidder’s} assertion of confidentiality with which the State does not concur, the Vendor {Bidder} shall be solely responsible for defending its designation, but in doing so, all costs and expenses associated therewith shall be the responsibility of the Vendor {Bidder}. The State assumes no such responsibility or liability.
A Vendor {Bidder} shall not designate any price lists and/or catalogs submitted as exempt from public disclosure as the same must be accessible to State Using Agencies and Cooperative Purchasing Program participants (if the Bid Solicitation has been extended to these participants) and thus must be made public to allow all eligible purchasing entities access to the pricing information.
In order not to delay consideration of the Quote or the State’s response to a request for documents, the State requires that Vendor {Bidder} respond to any request regarding confidentiality markings within the timeframe designated in the State’s correspondence regarding confidentiality. If no response is received by the designated date and time, the State will be permitted to release a copy of the Quote with the State making the determination regarding what may be proprietary or confidential.
ANNOUNCEMENT OF QUOTE INFORMATION
On the date and time Quotes are due under the Bid Solicitation, all information concerning the Quotes submitted may be publicly announced and shall be available for inspection and copying except as noted below:
A. Information appropriately designated as proprietary and/or confidential shall not be available for inspection and copying; and B. Where negotiation is contemplated, only the names and addresses of the Vendors {Bidders} submitting Quotes will be announced, and the contents of the Quotes shall not be available for inspection and copying until the Notice of Intent to Award is issued by the Director.
PRICE Alteration In QUOTES
Any price changes including hand written revisions or "white-outs" must be initialed. Failure to initial price changes may preclude a Blanket P.O. award from being made to the Vendor {Bidder} pursuant to N.J.A.C. 17:12-2.2(a)(8).
QUOTE ERRORS
In accordance with N.J.A.C. 17:12-2.11 “Proposal errors,” a Vendor {Bidder} may withdraw its Quote as described below.
QUOTE WITHDRAWAL PRIOR TO QUOTE OPENING
NJSTART: A Vendor {Bidder} may withdraw its Quote submission in NJSTART prior to the Quote opening; however, Vendors {Bidders} should note that while withdrawn NJSTART Quotes remain viewable by the Vendor {Bidder} on its Vendor Profile Homepage, they are removed from the Division’s view and cannot be considered for Blanket P.O. award. The Vendor {Bidder} may submit a revised Quote as long as the Quote is received prior to the announced date and time for Quote submission. Vendors {Bidders} may refer to the QRG “Submit a Quote” for additional instruction. QRGs are located on the NJSTART Vendor Support Page.
Hard Copy: A Vendor {Bidder} may request that its hard copy Quote be withdrawn prior to the Quote opening. Such request must be made, in writing, to the Supervisor of the Proposal Review Unit at the address provided in Section 1.4.7.2 below. The Vendor {Bidder} may submit a revised Quote as long as the Quote is received prior to the announced date and time for Quote submission and at the place specified.
QUOTE WITHDRAWAL AFTER QUOTE OPENING, BUT PRIOR TO BLANKET P.O. AWARD
NJSTART and Hard Copy: If, after the Quote opening, but before Blanket P.O. award, a Vendor {Bidder} discovers an error in its Quote, the Vendor {Bidder} may make a written request to the Supervisor of the Proposal Review Unit to withdraw its Quote, or a portion thereof, from consideration for award. If the Vendor’s {Bidder’s} request to withdraw is made in good faith, and the State will not be significantly prejudiced by granting the withdrawal of the Quote beyond the loss of the benefit of the bargain to the State of the withdrawing Vendor’s {Bidder’s} offer, the request shall be granted. Evidence of the Vendor’s {Bidder’s} good faith in making this request can be demonstrated by one (1) or more of the following factors: A mistake is so significant that to enforce the Blanket P.O. resulting from the Quote would be unconscionable; that the mistake relates to a material feature or term of the Blanket P.O.; and that the mistake occurred notwithstanding the Vendor’s {Bidder’s} exercise of reasonable care. After Quote opening, while pursuant to the provisions of this section a Vendor {Bidder} may request to withdraw its Quote and the Director may in his/her discretion allow said Vendor {Bidder} to withdraw it, the Division also may take notice of repeated or unusual requests to withdraw by a Vendor {Bidder} and take those prior requests to withdraw into consideration when evaluating the Vendor’s {Bidder’s} future Quotes.
All Quote withdrawal requests must include the Bid Solicitation identification number and the final Quote submission date and be sent to the following address:
Department of the Treasury Division of Purchase and Property PO Box 230 33 West State Street – 9th Floor Trenton, New Jersey 08625-0039 Attention: Supervisor, Proposal Review Unit
If during a Quote evaluation process, an obvious pricing error made by a potential Blanket P.O. awardee is found, the Director or his/her designee shall issue written notice to the Vendor {Bidder}. The Vendor {Bidder} will have up to five (5) business days after receipt of the notice to confirm its pricing. If the Vendor {Bidder} fails to respond, its Quote shall be considered withdrawn, and no further consideration shall be given to it.
JOINT Venture
If a Joint Venture is submitting a Quote, the agreement between the parties relating to such Joint Venture should be submitted with the Joint Venture’s Quote. Authorized signatories from each party comprising the Joint Venture must sign the Offer and Acceptance Page. Each party to the Joint Venture must individually comply with all the forms and certification requirements in Sections 4.4.1 and 4.4.2 of this Bid Solicitation.
Reciprocity for Jurisdictional Vendor Preference
In accordance with N.J.S.A. 52:32-1.4 and N.J.A.C. 17:12-2.13, the State of New Jersey will invoke reciprocal action against an out-of-State Vendor {Bidder} whose state or locality maintains a preference practice for its in-state Vendors {Bidders}. The State of New Jersey will use the annual surveys compiled by the Council of State Governments, National Association of State Procurement Officials, or the National Institute of Governmental Purchasing or a State’s statutes and regulations to identify States having preference laws, regulations, or practices and to invoke reciprocal actions. The State of New Jersey may obtain additional information as it deems appropriate to supplement the stated survey information.
A Vendor {Bidder} may submit information related to preference practices enacted for a State or Local entity outside the State of New Jersey. This information may be submitted in writing as part of the Quote response, including name of the locality having the preference practice, as well as identification of the county and state, and should include a copy of the appropriate documentation, i.e., resolution, regulation, law, notice to Vendor {Bidder}, etc. It is the responsibility of the Vendor {Bidder} to provide documentation with the Quote or submit it to the Director within five (5) business days after the deadline for Quote submission. Written evidence for a specific procurement that is not provided to the Director within five (5) business days of the public Quote submission date may not be considered in the evaluation of that procurement, but may be retained and considered in the evaluation of subsequent procurements.
QUOTE ACCEPTANCES AND REJECTIONS
N.J.A.C. 17:12-2.7(d), the Director’s right to waive minor irregularities or omissions in a Quote and N.J.A.C. 17:12-2.2 which defines causes for Quote rejection, apply to all Quotes.
ELECTRONIC SIGNATURES
Vendors {Bidders} submitting Quotes through NJSTART may sign the forms listed in Section 4.4.1 (Forms, Registrations and Certifications Required with Quote) and Section 4.4.2 (Forms, Registrations and Certifications Required Before Blanket P.O. Award and That Should Be Submitted with the Quote) of this Bid Solicitation electronically by typing the name of the authorized signatory in the “Signature” block as an alternative to downloading, physically signing the form, scanning the form, and uploading the form to NJSTART.
Vendors {Bidders} submitting Quotes in hard copy format, must provide forms with original, physical signatures, otherwise its Quote may be deemed non-responsive.
DEFINITIONS
CROSSWALK
| NJSTART Term |
| Equivalent Statutory, Regulatory and/or Legacy Term |
| Bid/Bid Solicitation |
| RFP/Solicitation |
| Bid Amendment |
| Addendum |
| Change Order |
| Contract Amendment |
| Master Blanket Purchase Order (Blanket P.O.) |
| Contract |
| Offer and Acceptance Page |
| Signatory Page |
| Quote |
| Proposal |
| Vendor |
| Bidder/Contractor |
General Definitions
The following definitions will be part of any Blanket P.O. awarded or order placed as a result of this Bid Solicitation.
All-Inclusive Hourly Rate – An hourly rate comprised of all direct and indirect costs including, but not limited to: labor costs, overhead, fee or profit, clerical support, travel expenses, per diem, safety equipment, materials, supplies, managerial support and all documents, forms, and reproductions thereof. This rate also includes portal-to-portal expenses as well as per diem expenses such as food.
Best and Final Offer or BAFO – Pricing timely submitted by a Vendor {Bidder} upon invitation by the Bureau after Quote opening, with or without prior discussion or negotiation.
Bid or Bid Solicitation – This series of documents, which establish the bidding and Blanket P.O. requirements and solicits Quotes to meet the needs of the Using Agencies as identified herein, and includes the Bid Solicitation, State of NJ Standard Terms and Conditions (SSTC), State-Supplied Price Sheet, attachments, and Bid Amendments.
Bid Amendment – Written clarification or revision to this Bid Solicitation issued by the Division. Bid Amendments, if any, will be issued prior to Quote opening.
Business Day – Any weekday, excluding Saturdays, Sundays, State legal holidays, and State-mandated closings unless otherwise indicated.
Calendar Day – Any day, including Saturdays, Sundays, State legal holidays, and State-mandated closings unless otherwise indicated.
Change Order – An amendment, alteration, or modification of the terms of a Blanket P.O. between the State and the Vendor(s) {Contractor(s)}. A Change Order is not effective until it is signed and approved in writing by the Director or Deputy Director, Division of Purchase and Property.
Cooperative Purchasing Program – The Division’s intrastate program that provides procurement-related assistance to New Jersey local governmental entities and boards of education, State and county colleges and other public entities having statutory authority to utilize select State Blanket P.O.s issued by the Division, pursuant to the provisions of N.J.S.A. 52:25-16.1 et seq.
Days After Receipt of Order (ARO) – The number of calendar days ‘After Receipt of Order’ in which the Using Agency will receive the ordered materials and/or services.
Director – Director, Division of Purchase and Property, Department of the Treasury, who by statutory authority is the Chief Contracting Officer for the State of New Jersey.
Disabled veterans’ business - means a business which has its principal place of business in the State, is independently owned and operated and at least 51% of which is owned and controlled by persons who are disabled veterans or a business which has its principal place of business in this State and has been officially verified by the United States Department of Veterans Affairs as a service disabled veteran-owned business for the purposes of department contracts pursuant to federal law. N.J.S.A. 52:32-31.2.
Disabled veterans’ business set-aside contract - means a contract for goods, equipment, construction or services which is designated as a contract with respect to which bids are invited and accepted only from disabled veterans’ businesses, or a portion of a contract when that portion has been so designated. N.J.S.A. 52:32-31.2.
Discount – The price reduction applied by the Vendor {Bidder} to all items.
Division – The Division of Purchase and Property.
Evaluation Committee – A committee established or Division staff member assigned by the Director to review and evaluate Quotes submitted in response to this Bid Solicitation and recommend a Blanket P.O. award to the Director.
Firm Fixed Price – A price that is all-inclusive of direct cost and indirect costs, including, but not limited to, direct labor costs, overhead, fee or profit, clerical support, equipment, materials, supplies, managerial (administrative) support, all documents, reports, forms, travel, reproduction and any other costs.
Joint Venture – A business undertaking by two (2) or more entities to share risk and responsibility for a specific project.
Master Blanket Purchase Order (Blanket P.O.) – The Blanket P.O. consists of the State of NJ Standard Terms and Conditions (SSTC), the Bid Solicitation, the responsive Quote submitted by a responsible Vendor {Bidder} as accepted by the State, the notice of award, any Best and Final Offer, any subsequent written document memorializing the agreement, any modifications to any of these documents approved by the State and any attachments, Bid Amendment or other supporting documents, or post-award documents including Change Orders agreed to by the State and the Vendor {Contractor}, in writing.
May – Denotes that which is permissible or recommended, not mandatory.
Must – Denotes that which is a mandatory requirement.
No Bid – The Vendor {Bidder} is not submitting a price Quote for an item on a price line.
No Charge – The Vendor {Bidder} will supply an item on a price line free of charge.
Primary Form – An electronic form contained within a Vendor’s {Bidder’s} NJSTART profile designated by the Vendor {Bidder} as the primary or principal version of the required form.
Procurement Bureau (Bureau) – The Division unit responsible for the preparation, advertisement, and issuance of Bid Solicitations, for the tabulation of Quotes and for recommending award(s) of Blanket P.O.(s) to the Director and the Deputy Director.
Project – The undertakings or services that are the subject of this Bid Solicitation.
QRGs – Quick Reference Guides.
Quote – Vendor’s {Bidder’s} timely response to the Bid Solicitation including, but not limited to, technical Quote, price Quote, and any licenses, forms, certifications, or other documentation required by the Bid Solicitation.
Retainage – The amount withheld from the Vendor {Contractor} payment that is retained and subsequently released upon satisfactory completion of performance milestones by the Vendor {Contractor}.
Revision – A response to a BAFO request or a requested clarification of the Vendors {Bidders} Quote.
Shall – Denotes that which is a mandatory requirement.
Should – Denotes that which is permissible or recommended, not mandatory.
Small Business – Pursuant to N.J.S.A. 52:32-19, N.J.A.C. 17:13-1.2, and, N.J.A.C. 17:13-2.1, “small business” means a business that meets the requirements and definitions of “small business” and has applied for and been approved by the New Jersey Division of Revenue and Enterprise Services, Small Business Registration and M/WBE Certification Services Unit as (i) independently owned and operated, (ii) incorporated or registered in and has its principal place of business in the State of New Jersey; (iii) has 100 or fewer full-time employees; and has gross revenues falling in one (1) of the three (3) following categories:
· For goods and services - (A) 0 to $500,000 (Category I); (B) $500,001 to $5,000,000 (Category II); and (C) $5,000,001 to $12,000,000, or the applicable federal revenue standards established at 13 CFR 121.201, whichever is higher (Category III).
· For construction services: (A) 0 to $3,000,000 (Category IV); (B) gross revenues that do not exceed 50 percent of the applicable annual revenue standards established at 13 CFR 121.201 (Category V); and (C) gross revenues that do not exceed the applicable annual revenue standards established at CFR 121.201, (Category VI).
Small business set-aside contract – “means (1) a contract for goods, equipment, construction or services which is designated as a contract with respect to which bids are invited and accepted only from small businesses, or (2) a portion of a contract when that portion has been so designated.” N.J.S.A. 52:32-19.
State – State of New Jersey.
State Contract Manager or SCM – The individual, as set forth in Section 8.0, responsible for the approval of all deliverables, i.e., tasks, sub-tasks or other work elements in the Scope of Work. The SCM cannot direct or approve a Change Order.
State-Supplied Price Sheet – The bidding document created by the State and attached to this Bid Solicitation on which the Vendor {Bidder} submits its Quote pricing as is referenced and described in Bid Solicitation Section 4.4.5.
Subtasks – Detailed activities that comprise the actual performance of a task.
Subcontractor – An entity having an arrangement with a Vendor {Contractor}, whereby the Vendor {Contractor} uses the products and/or services of that entity to fulfill some of its obligations under its State Blanket P.O., while retaining full responsibility for the performance of all [the Vendor’s {Contractor's}] obligations under the Blanket P.O., including payment to the Subcontractor. The Subcontractor has no legal relationship with the State, only with the Vendor {Contractor}.
Task – A discrete unit of work to be performed.
Unit Cost or Unit Price – All-inclusive, firm fixed price charged by the Vendor {Bidder} for a single unit identified on a price line.
Using Agency[ies] – A State department or agency, a quasi-State governmental entity, or a Cooperative Purchasing Program participant, authorized to purchase products and/or services under a Blanket P.O. procured by the Division.
Vendor {Bidder} – An entity offering a Quote in response to the Division’s Bid Solicitation.
Vendor {Contractor} – The Vendor {Bidder} awarded a Blanket P.O. resulting from this Bid Solicitation.
BLANKET P.O.-specific definitions/ACRONYMS
FHWA – Federal Highway Administrationssociation
ASTM – American Society for Testing and Materials
AASHTO – American Association of State Highway and Transportation Officials
NCHRP 350 – National Cooperative Highway Research Program Report 350
Pre-Consumer Material – Materials generated in manufacturing and converting processes, such as manufacturing scrap and trimmings/cuttings.
Post-Consumer Material – Material or finished product that has served its intended use and has been diverted or recovered from waste destined for disposal, having completed its life as a consumer item. Post-Consumer Materials are part of the broader category of Recovered Materials.
Recovered Material – Waste material and byproduct that have been recovered or diverted from solid waste, but does not include materials and byproducts generated from, and commonly reused within, an original manufacturing process.
Materials in Solid Waste – Material found in the various components of the solid waste stream. General, solid waste has several components, such as municipal solid waste (MSW), construction and demolition debris (C&D), and nonhazardous industrial waste. Under RCRA Section 6002, EPA considers materials recovered from any component of the solid waste stream when designating items containing Recovered Materials.
Recycling – The series of activities, including collection, separation, and processing, by which products or other materials are recovered from the solid waste stream for use in the form of raw materials in the manufacture of new products other than fuel for producing heat or power by combustion.
Recyclability – The ability of a product or material to be recovered from, or otherwise diverted from, the solid waste stream for the purpose of recycling.
RMAN – Recovered Materials Advisory Notices provide purchasing guidance and recommendations for Recovered and Post-Consumer Material content levels for designated items.
USEPA – United States Environmental Protection Agency
SCOPE OF WORK
Description of u-post signs
This Bid Solicitation is for the procurement of Type 1 and Type 2 Breakaway Steel U- Post Sign Supports. The specifications for each type of U-Post Sign Support are as follows:
All steel U-Post Sign Supports shall be of the breakaway type with the exception of those installed behind guide rail or other roadside barriers.
Group 1 – Price Lines 1 through 17
TYPE 1: BREAKAWAY STEEL U-POST SIGN SUPPORTS – Price Lines 1 through 14
Type 1 Steel U-Post sign supports shall be fabricated from hot rolled carbon steel bars conforming to the requirements of A.S.T.M. Designation A663, Grade 80.
All steel designations must comply with the Charpy V-Notch test requirements as follows:
A specimen of the steel u-posts shall be submitted to the NJ Department of Transportation (NJDOT) for testing, within seven (7) days of a written request. The specimen shall be tested in accordance with A.A.S.H.T.O. T266 and shall be machined and ready for testing. Charpy fracture energy shall not exceed 0.28 Newton meter per square millimeter when tested at 65 degrees C. in accordance with A.A.S.H.T.O. T266.
The cast heat analysis of the steel shall conform to the following requirements:
| Carbon |
| 0.67 – 0.82 % |
| Manganese |
| 0.70 - 1.10 % |
| Phosphorus |
| 0.40 % Maximum |
| Sulphur |
| 0.05 % Maximum |
| Silicon |
| 0.10 - 0.25 % |
U-POST PROPERTIES
TYPE 1
| WEIGHT MEMBER LBS/FT |
| FACE WIDTH INCHES |
| MEMBER DEPTH INCHES |
| AREA SQUARE INCHES |
| SEC. MOD. IN .3 X - X ASIS SINGLE POST |
| 1.12 |
| 2.250 |
| 0.871 |
| 0.322 |
| 0.069 |
| 2.00 |
| 3.062 |
| 1.462 |
| 0.594 |
| 0.246 |
| 2.50 |
| 3.062 |
| 1.516 |
| 0.760 |
| 0.313 |
| 4.00 |
| 3.500 |
| 1.968 |
| 1.187 |
| 0.707 |
All posts meeting the above requirements shall be suitably proportioned for compliance with performance. The posts and spacers shall conform to the construction detail drawings titled "Steel U-Post Sign Supports", except that minor variations to conform to a manufacturer's standard will be permitted if approved by the engineer. Drawings could be found at the following link: https://www.state.nj.us/transportation/eng/CADD/v8/pdf/StandConstDetails.pdf.
All posts shall be straight and shall have a smooth finish, free of burs. All post members shall be no smaller in size than that indicated for each size or type designated and shall meet the corresponding minimum requirements stated above. The weight per foot of each individual post member shall not vary by more than plus or minus 5%.
The back of each post shall be perforated with 3/8 inch holes spaced on 1 inch centers, beginning 1 inch from the top and continue to within 1 inch of the bottom end. Tapering of the bottom end will not be required.
soil anchor plates – price line 15
Soil stabilization (anchor) plates, Type 1, shall be made in accordance with A.S.T.M. A36 or 11- gauge sheet steel. The plate shall be punched with two; 7/16-inch diameter holes on 4-inch centers. All anchor plates shall conform to the Standard Roadway Construction Details, drawings titled "steel U-Posts Sign Supports" which could be found at the following link: http://www.state.nj.us/transportation/eng/CADD/v8/index.shtml#StandardDetailsEnglish.
fasteners and other breakaway hardware – Price Line 16 and 17
Sign mounting bolts shall extend beyond the end of each nut but not more than 3/4 inch when fully…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .