3524_18E_LEOPARDS_LANE_LAYOUT-STAFF_QUARTERS.PDF

PDF 147 KB Posted

Attached to
Request for Quotation SZA60017Q0003 for Refurbishing and Renovating a Residential Property in Lusaka Zambia.
Solicitation number
SZA60017Q0003
Issued by

About this file

3524 18E LEOPARDS LANE LAYOUT-STAFF QUARTERS

View the file

Other files

File Type Posted
Specifications_Solicitation_Number_SZA60017Q0003_to_construct_renovate_an_existing_residential_property.pdf PDF
Statement_of_Work_for_Solicitation_Number_SZA60017Q0003.pdf PDF
Solicitation_Number_SZA60017Q0003_to_construct_renovate_an_existing_residential_property_.pdf PDF
18E_Leopards_Lane_Internal_Water_Layout_Rev_A_(1).PDF PDF
L1428-C-01_Kerbstone_and_Carpark_Construction_Detail.pdf PDF
RM20-2016-E04-18E-HOUSE-SCHEM-REV.0.pdf PDF
L1428-ST-01_rev_A_Terrace_Foundation_and_Column_Footing.pdf PDF
Cover_letter_-_Solicitation_Number_SZA60017Q0003_to_Construct-Renovate_an_existing_Residential_Property.pdf PDF
SF1442-_Request_for_Quotation_SZA60017Q0003_for_Refurbishing_and_Renovating_a_Residential_Property_in_Lusaka_Zambia_(2).pdf PDF
3524_18E_LEOPARDS_LANE_LAYOUT-EXISTING_MAIN_HOUSE_EX_001.pdf PDF
3524_18E_LEOPARDS_LANE_LAYOUT-DEMOLITIONS_MAIN_HOUSE_PD_002.pdf PDF
3524_18E_LEOPARDS_LANE_LAYOUT-DOOR_&_WINDOW_SCHEDULE.PDF PDF
18E_Leopards_Lane_External_Water_Layout_Rev_A.PDF PDF
RM20-2016-E02-18E_HOUSE-LTG-REV.D_Main_House_Ceiling_plan_lighting_layout.pdf PDF
L1428-ST-02_rev_A_Terrace_Surface_Bed_and_Rafter_Fixing.pdf PDF
18E_Leopards_Lane_Internal_HVAC_Layout_Rev_A.PDF PDF
RM20-2016-E01-18E_HOUSE-SITE_PLAN-REV.C.PDF PDF
18E_Leopards_Lane_Internal_Sewer_Layout_Rev_A.PDF PDF
RM20-2016-E03-18E_HOUSE-PWR-REV.D_Main_House_and_Servants_Quarter_Floor_Plans_Layout.pdf PDF
L1428-ST-03_rev_C_Structural_Roof_General_Arrangment.pdf PDF
3524_18E_LEOPARDS_LANE_LAYOUT-ROOF_&_ELEVATIONS_MAIN_HOUSE_PD_003.pdf PDF
3524_18E_LEOPARDS_LANE_LAYOUT-_SITE_LAYOUT_PLANS_EX001.pdf PDF
18E_Leopards_Lane_Internal_Water_Layout_Rev_A.PDF PDF
3524_18E_LEOPARDS_LANE_LAYOUT-NEW_WORKS_MAIN_HOUSE_PD_001.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM 01ROOM 02

SH

Wc.

BACK ELEVATION

FRONT ELEVATIONSIDE ELEVATION

2200 900 400 900 2200

200 3000 200 3000 200

0 20

00 17

WORK SCHEDULE :

1. Build up 200mm thick hollow concrete block walls. Extend existing roofing sheets over to match. Fit in new 1200x900mm mild steel window to match existing windows, and fit in new solid core timber door panel in pressed steel frame, make good to all surfaces.

2. New electrical switch socket outlets to be added as specified by the electrical engineer and make good to all disturbed surfaces.

3. Fit in new 1200x600mm sink unit and connected to existing waste water system and make good to all surfaces.

NEW COOKING AREA NEW COOKING AREA

ROOM 01ROOM 02

SH

Wc.

BACK ELEVATION

FRONT ELEVATIONSIDE ELEVATION

200 700 300 700 200 900 2300 800 400 800 2300

2100 900 6600

1000 1500 1600 1500 1000

200 3000 200 3000 200

200 750 200 750 200

Job Title:

ANDERSON + ANDERSON INTERNATIONAL

ARCHITECTS ZAMBIA

9 Ash Road, Woodlands; PO Box 30263, Lusaka, 10101; Tel: +26-0211-266455, +26-0211-266400; anderson@zamnet.zm

EXISTING AND PROPOSED - PLAN, ELEVATIONS

AND ROOF LAYOUTS

3524-LEOPARDS LANE

STAFF QUARTERS - SQ 001

FEBRUARY 2017

1:50 @ A1 PAPER

Number: Date:

Drawing Title: Scale:

Notes:

UNITED STATES AGENCY FOR

INTERNATIONAL DEVELOPMENT (USAID), LUSAKA.

PROPOSED LAYOUTS

EXISTING LAYOUTS

File details come from the government source that posted it. Updated .