SWVCC 260-B5260-046 M25SW125 Project Drawings 2026-02-13.pdf
PDF 8 MB Posted
- Solicitation number
- DBB-114331
- Issued by
- Brunswick County, Chatham Town, Virginia
About this file
This file consists of project working drawings and technical specifications for the Replace Oil Burners with Gas Boiler project at Southwest Virginia Community College's Davis Hall, located in Cedar Bluff, Virginia, under Project Code 260-B5260-046. The project scope involves the demolition of one 8,000-gallon underground fuel oil storage tank, one 1,000-gallon underground propane storage tank, two 1,250 MBH fuel oil boilers with associated hot water pumps, and the installation of a new 6,500-gallon underground propane storage tank, a 1,300 MBH propane boiler, and replacement system hot water pumps. The new propane storage tank will be installed in the location of the removed fuel oil tank. The project is classified as a Level 1 Alteration in compliance with the 2021 Virginia Existing Building Code Section 601.2. The sealed bid deadline is 2:00 P.M. on Wednesday, March 25, 2026, with public bid opening scheduled for Thursday, March 26, 2026, at the Virginia Community College System offices in Richmond, Virginia. Bids are submitted electronically through eVA or by hand delivery to the VCCS Attention: Mrs. Sibyl Roberts, 300 Arboretum Place, Suite 200, Richmond, Virginia 23236, with telephone contact at (804) 819-4918.
The project drawings provide comprehensive civil, mechanical, and electrical plans totaling 17 sheets, including site plans, existing conditions and demolition plans, mechanical system layouts, roof details, boiler schedules, and control system specifications. All work must comply with the Virginia Uniform Statewide Building Code (VUSBC) 2021, Virginia Construction Code, Virginia Existing Building Code, applicable NFPA standards (NFPA-72, NFPA-13, NFPA-58), Virginia Fuel Gas Code, Plumbing Code, Mechanical Code, Fire Code, Energy Conservation Code, and ASHRAE 90.1-2019. The contractor must contact Virginia 811 at least 72 hours prior to excavation, provide erosion and sediment control measures, protect existing utilities and site features, and obtain all required federal, state, and local permits. A Standard Commonwealth Bid Bond (form CO-10.2) and Contract Security are required. The contractor shall process all pay applications and invoices through the Owner's e-Builder web-based project management software at no cost. The project manager for Virginia Community College System is Mike Wagner, and the design firm project manager is Tyler Morris of Wiley|Wilson.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
COVER SHEET
SWL
ZDA
02/13/2026
250077
G-001
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
SOUTHWEST VIRGINIA COMMUNITY COLLEGE
REPLACE OIL BURNERS WITH GAS BOILER AT
DAVIS HALL
CEDAR BLUFF, VIRGINIA
PROJECT CODE: 260-B5260-046
WORKING DRAWINGS
JANUARY 22, 2026
PROJECT INFORMATION
CAMPUS MAPVICINITY MAP
NOT TO SCALE NOT TO SCALE
INDEX OF DRAWINGS
SHEET NO SHEET NAME
REVISION
NO DATE DESCRIPTION
GENERAL
G-001 COVER SHEET
CIVIL
C-001 CIVIL GENERAL NOTES, LEGENDS, SYMBOLS, AND ABBREVIATIONS
C-101 EXISTING CONDITIONS AND DEMOLITION PLAN
C-102 SITE PLAN
C-501 CIVIL DETAILS
MECHANICAL
M-001 LEGEND, ABBREVIATIONS & GENERAL NOTES
MD101 MECHANICAL DEMOLITION PLANS
M-101 FIRST FLOOR MECHANICAL PLAN
M-102 ROOF MECHANICAL PLAN
M-301 SECTIONS
M-501 DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-701 CONTROLS
ELECTRICAL
E-001 ELECTRICAL LEGENDS AND SYMBOLS
E-101 FIRST FLOOR ELECTRICAL PLANS
E-601 PANEL SCHEDULES & ONELINES
SHEETS: 17
VCCS
PROJECT MANAGER: MIKE WAGNER
PHONE: (804)-258-8802
EMAIL: MWAGNER@VCCS.EDU
ADDRESS:300 ARBORETUM PLACE, SUITE 200, RICHMOND, VIRGINIA 23236
Wiley|Wilson
PROJECT MANAGER: TYLER MORRIS
PHONE: (434) 455-3692
EMAIL: TDMORRIS@WILEYWILSON.COM
ADDRESS: 127 NATIONWIDE DRIVE, LYNCHBURG, VIRGINIA 24502
PROJECT SCOPE:
THE PROJECT SITE IS LOCATED AT DAVIS HALL ON THE CAMPUS OF SOUTHWEST VIRGINIA COMMUNITY COLLEGE. THE PROJECT PROPOSES THE DEMOLITION OF ONE (1) 8,000 GALLON UNDERGROUND FUEL OIL STORAGE TANK, ONE (1) 1,000 GALLON UNDERGROUND PROPANE STORAGE TANK, TWO (2) 1250 MBH FUEL OIL BOILERS AND ASSOCIATED HOT WATER PUMPS AND THE INSTALLATION OF A NEW 6,500 GALLON UNDERGROUND PROPANE STORAGE TANK, A 1,300 MBH PROPANE BOILER, AND SYSTEM HOT WATER PUMPS. THE NEW PROPANE STORAGE TANK WILL BE INSTALLED IN THE LOCATION OF THE REMOVED FUEL OIL TANK.
THIS PROJECT IS A LEVEL 1 ALTERATION IN COMPLIANCE WITH THE 2021 VIRGINIA EXISTING BUILDING CODE SECTION 601.2 LEVELS
OF ALTERATIONS.
GOVERNING CODES:
VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC)
2021 VIRGINIA CONSTRUCTION CODE (VUSBC, PART 1, VCC)
2021 VIRGINIA EXISTING BUILDING CODE (VUSBC, PART 2, VEBC)
2021 ERRATA TO THE VIRGINIA BUILDING AND FIRE REGULATIONS
CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL (CPSM), 2025 EDITION REV 0, 03/17/2025 2019 NATIONAL FIRE PROTECTION ASSOCIATION, FIRE ALARM AND FIRE SPRINKLER CODES (NFPA-72, NFPA-13)
AS ADOPTED AND AMENDED BY THE VUSBC.
2020 NATIONAL FIRE PROTECTION ASSOCIATION, LIQUEFIED PETROLEUM GAS CODE (NFPA-58)
AS ADOPTED AND AMENDED BY THE VUSBC.
2021 VIRGINIA FUEL GAS CODE
2021 VIRGINIA PLUMBING CODE
2021 VIRGINIA MECHANICAL CODE
2021 VIRGINIA FIRE CODE
2021 VIRGINIA ENERGY CONSERVATION CODE
2019 ASHRAE 90.1
2020 NATIONAL ELECTRICAL CODE, NFPA 70
NFPA 58, LIQUEFIED PETROLEUM GAS CODE, 2020
ADA90-TITLE II
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, CHAPTER 2 FOR SCOPING REQUIREMENTS
ICC 117.1-2017 STANDARDS FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES, CHAPTERS 1 & 3-11
BUILDING INFORMATION:
VCC CONSTRUCTION TYPE: IIB, FULLY SPRINKLERED
USE GROUP: B, BUSINESS
BUILDING AREA:
GROSS AREA (GSF): 45,000 SF
HIGH PERFORMANCE BUILDING ACT:
IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING IS EXEMPT FROM COMPLIANCE BECAUSE THE COST OF
THE RENOVATIONS DOES NOT EXCEED 50% OF THE VALUE OF THE BUILDING.
VIRGINIA ENERGY CONSERVATION CODE:
IN ACCORD WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE BUILDING SHALL COMPLY WITH ASHRAE 90.1-2019
SECTIONS 5, 6, 7, 8, 9, & 10.
a. SECTION 5 BUILDING ENVELOPE COMPLIANCE IS NOT APPLICABLE.
b. SECTION 6 HVAC COMPLIANCE WILL BE VIA SECTIONS 6.4 – MANDATORY PROVISIONS AND 6.5 – PRESCRIPTIVE
PATH.
c. SECTION 8 POWER COMPLIANCE WILL BE VIA SECTION 9.5 - MANDATORY PROVISIONS.
d. SECTION 9 LIGHTING COMPLIANCE IS NOT APPLICABLE.
PROJECT ALTERATIONS WILL BE SUCH THAT THE EXISTING BUILDING IS NO LESS CONFORMING TO THE PROVISIONS OF THE 2021 VIRGINIA CONSTUCTION CODE THAN THE EXISTING BUILDING WAS PRIOR TO THE ALTERATION IN COMPLIANCE WITH THE 2021
VIRGINIA EXISTING BUILDING CODE SECTION 601.1.
ASBESTOS DISCLOSURE STATEMENT:
AN ASBESTOS INSPECTION WAS NOT PERFORMED BECAUSE ALL PORTIONS OF THE EXISTING BUILDING THAT
MAY BE AFFECTED BY THE WORK WERE ORIGINALLY CONSTRUCTED AFTER JANUARY 1, 1985.
LEAD MATERIALS DISCLOSURE:
AN INSPECTION TO IDENTIFY LEAD CONTAINING OR COATED BUILDING COMPONENTS HAS NOT BEEN CONDUCTED BECAUSE THE BUILDING WAS CONSTRUCTED AFTER JANUARY 1, 1985 AND THE OWNER HAS NO KNOWLEDGE OF LEAD CONTAINING OR COATED BUILDING COMPONENTS IN THE BUILDING. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COMPLY WITH ALL VIRGINIA OCCUPATIONAL SAFETY AND HEALTH (VOSH) REGULATIONS AS
THEY PERTAIN TO EMPLOYEE EXPOSURES TO LEAD. ALL LEAD AND LEAD-COATED
BUILDING COMPONENTS SHALL BE RECYCLED TO THE EXTENT POSSIBLE.
DIG NOTICE:
CONTACT VIRGINIA 811 AT 811, 1-800-552-7001, OR HTTPS://WWW.VA811.COM NO LESS THAN 72 HOURS PRIOR TO EXCAVATION AND
DO NOT DISTURB THE SOIL UNTIL DIG TICKET HAS BEEN PROCESSED.
FIRE SAFETY NOTE AND REQUIREMENTS:
CONTRACTOR MUST STRICTLY OBSERVE REQUIREMENTS OF THE INTERNATION FIRE CODE (IFC) DURING CONSTRUCTION OPERATION. CONDITIONS OR ACTIVITIES CREATING FIRE HAZARDS DURING CONSTRUCTION OR DEMOLITION REQUIRE ADHERENCE TO CHAPTER 33 OF THE IFC. FOR CONDITIONS NOT COVERED IN THE IFC, REFER TO NFPA-241.
SITE
PROJECT SITE
CONTACT INFORMATION
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
10/16/202002/13/202502/13/2026
Y
G. KEITH THOMPSON, JR.
Lic. No. 41823
02/13/2026
CONSTRUCTION DOCUMENTS
FEBRUARY 13, 2026
COM
MO
N
W E A L T H O F V
IR
GI
NIA
PR
OF
E S S I O N A L E N G
IN
EE
R
Li c.
N o.
T Y
LE
R
D
M O
R R
IS
/0
5/
C O M M O
N W
EA
LTH OF
V
IR
G
IN
I A
P R O F
E
SSIONAL
EN
G
IN
E E RLic. No. 55060
TYLER D. MORRIS
02/05/202602/13/2026
CAT
GKT
GKT
C-001
CIVIL GENERAL NOTES,
LEGENDS, SYMBOLS, AND
ABBREVIATIONS
EXISTING STRUCTURE DATA
STORM STRUCTURE DATA SANITARY STRUCTURE DATA ENGINEER CONTACT INFORMATION
NAME: G. KEITH THOMPSON, JR, PE, LEED AP BD+C, ENV SP
VICE PRESIDENT, WATER RESOURCES GROUP LEADER
COMPANY: WILEY|WILSON
ADDRESS: 127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
PHONE: (434) 455-3219
EMAIL: KTHOMPSON@WILEYWILSON.COM
1. CONTACT "MISS UTILITY" AT 1-800-552-7001 PRIOR TO BEGINNING ANY EXCAVATION OR
DEMOLITION IN ACCORDANCE WITH THE VIRGINIA UNDERGROUND UTILITY DAMAGE PREVENTION
ACT. CONTACT APPROPRIATE UTILITY AUTHORITY IN THE EVENT THAT MISS UTILITY DOES NOT LOCATE PRIVATE UTILITIES. PROVIDE THIRD PARTY LOCATING SERVICE AS REQUIRED TO LOCATE
UTILITIES ON PRIVATE PROPERTY.
2. ALL ABOVE GROUND SITE FEATURES AND UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES
HAVE BEEN PLOTTED FROM AVAILABLE RECORDS, AND THEREFORE THEIR LOCATION MUST BE
CONSIDERED APPROXIMATE ONLY. THERE MAY BE OTHERS, THE EXTENTS OF WHICH ARE
PRESENTLY NOT KNOWN. VERIFY LOCATION OF ALL UTILITIES NECESSARY TO PERFORM THE
WORK INDICATED IN THE PROJECT DOCUMENTS PRIOR TO ORDERING ANY MATERIALS AT NO
ADDITIONAL COST TO THE OWNER.
3. PROTECT ALL EXISTING UTILITIES WITHIN THE LIMITS OF WORK, WHETHER SHOWN ON THE PLANS
OR NOT. IF RELOCATION OF EXISTING UTILITIES IS REQUIRED, CONTACT THE APPROPRIATE
RESPONSIBLE UTILITY AUTHORITY BEFORE DISRUPTING UTILITY SERVICE. DAMAGE TO THE
UTILITIES AS A RESULT OF THE CONTRACTOR'S ACTIVITIES MUST BE REPAIRED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
4. IN THE EVENT THAT A UTILITY LINE IS DISCOVERED THAT IS NOT IDENTIFIED ON THE CONTRACT DOCUMENTS, IMMEDIATELY STOP WORK IN THIS AREA AND IMMEDIATELY CONTACT THE ENGINEER
OF RECORD.
5. DO NOT STORE MATERIALS, EQUIPMENT,OPERATE OR PARK EQUIPMENT WITHIN THE DRIPLINE OF
EXISTING TREES THAT ARE TO REMAIN, EXCEPT AS REQUIRED FOR CONSTRUCTION IN THOSE
AREAS. PROTECT ALL EXISTING TREES TO REMAIN WITHIN THE LIMITS OF WORK.
6. RESTORE, TO THEIR ORIGINAL OR BETTER CONDITION AND AT CONTRACTOR'S OWN EXPENSE, ALL EXISTING AND NEW SITE FEATURES DAMAGED AS A RESULT OF THE CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO: PAVEMENT, CURBS, SIGNS, LANDSCAPING, STRUCTURES, WALLS, FENCES, AND UTILITIES.
7. MAINTAIN A MINIMUM OF ONE (1) SET OF APPROVED PLANS AT THE PROJECT SITE DURING
CONSTRUCTION. VERIFY AND CHECK ALL DIMENSIONS AND DETAILS SHOWN ON THE DRAWINGS
PRIOR TO THE START OF CONSTRUCTION. BRING ANY DISCREPANCY TO THE ATTENTION OF THE
ENGINEER OF RECORD IMMEDIATELY FOR CLARIFICATION.
8. FURNISH AND PERFORM ALL WORK INCIDENTAL TO THE CONTRACT AND NECESSARY TO
COMPLETE THE PROJECT, ALTHOUGH NOT SPECIFICALLY REFERRED TO ON THE CONTRACT
DOCUMENTS, AT NO ADDITIONAL COST TO THE OWNER.
9. KEEP THE PROJECT AREA AND SURROUNDING AREA FREE FROM RUBBISH, DUST, NOISE, EROSION, ETC. THE WORK MUST BE DONE IN CONFORMANCE WITH THE AIR AND WATER POLLUTION
CONTROL STANDARDS AND REGULATIONS FROM THE DEPARTMENT OF HEALTH AT NO
ADDITIONAL COST TO THE OWNER.
10. IN THE EVENT THAT HAZARDOUS MATERIALS ARE DISCOVERED THAT ARE NOT IDENTIFIED ON THE
CONTRACT DOCUMENTS, IMMEDIATELY STOP WORK IN THIS AREA AND IMMEDIATELY CONTACT
THE ENGINEER OF RECORD.
11. OBTAIN ALL FEDERAL, STATE, AND LOCAL PERMITS AND APPROVALS REQUIRED FOR
CONSTRUCTION.
12. IF ANY ACCIDENT OCCURS THAT RELEASES PETROCHEMICAL OR TOXIC SUBSTANCES,
IMMEDIATELY NOTIFY THE ENGINEER OF RECORD AND THE DEPARTMENT OF HEALTH.
13. PROVIDE EROSION AND SEDIMENT CONTROL MEASURES AS THE FIRST STEP IN CONSTRUCTION
OPERATIONS AND MAINTAIN IN ACCORDANCE WITH THE GOVERNING AUTHORITY'S MOST RECENT
EROSION AND SEDIMENT CONTROL MANUAL. REMOVE TEMPORARY EROSION CONTROL
MEASURES AFTER COMPLETION OF THE PROJECT. THE EROSION CONTROL MEASURES INDICATED
ARE THE MINIMUM, OTHER MEASURES MAY BE REQUIRED BY THE EROSION CONTROL INSPECTOR.
PROVIDE MEASURES REQUIRED TO COMPLY WITH APPLICABLE REGULATIONS. REMOVE EROSION
CONTROL MEASURES WHEN THE SITE IS STABILIZED.
14. DO NOT COMMENCE WORK (GRADING, EXCAVATING, AND CONSTRUCTION) ON THE PROJECT UNTIL THE APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AS SPECIFIED ON
THE PLANS.
15. UPON COMPLETION OF THE PROJECT, RESTORE LAYDOWN/STAGING AREA TO THE ORIGINAL OR
BETTER CONDITION AT NO ADDITIONAL COST TO THE OWNER.
16. WATER AND SEWER SEPARATION MUST COMPLY WITH LOCAL, STATE, AND FEDERAL
REQUIREMENTS. IF CONFLICTING, THE MORE STRINGENT GUIDANCE IS REQUIRED.
ARCH ARCHITECT
A/E ARCHITECT/ENGINEER
AP ACCREDITED PROFESSIONAL
APPR APPROVED
AVE AVENUE
BD+C BUILDING DESIGN AND
CONSTRUCTION
CHIS CHISELED
CHK CHECK
CO CLEANOUT
CONC CONCRETE
CONSTR CONSTRUCTION
CONTR CONTRACT
CT COURT
DEB DIVISION OF ENGINEERING AND
BUILDINGS
DEG/° DEGREES
DI/DIP DUCTILE IRON PIPE
DRW DRAWN
DWG DRAWING
DES DESIGN
DR DRIVE
DS DOWNSPOUT
E EAST
E EASTING
E/ELEC ELECTRIC
EL/ELEV ELEVATION
ENG ENGINEER
EX EXISTING
ETC ET CETERA
FF FINISH FLOOR
FT/' FEET
GV GATE VALVE
HCAP HANDICAP
HORIZ HORIZONTAL
IN/" INCH
INFO INFORMATION
INV INVERT
L'SCAPE LANDSCAPING
LN LANE
LOD LIMITS OF DISTURBANCE
LP LIGHT POLE
LS LICENSED SURVEYOR
MIN MINIMUM
MJ MECHANICAL JOINT
N NORTH
N NORTHING
NO NUMBER
O.C. CENTER
PC PROJECT CODE
PE PROFESSIONAL ENGINEER
PM PROJECT MANAGER
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
S/SS SANITARY
SD/D STORM DRAIN
SF SQUARE FEET
SSCO SANITARY SEWER CLEANOUT
SSMH SANITARY SEWER MANHOLE
STA STATION
STDI STORM DRAIN INLET
ST STREET
SYM SYMBOL
TS TAPPING SLEEVE
TYP TYPICAL
UGE UNDERGROUND ELECTRIC
VA VIRGINIA
VSDB VIRGINIA SCHOOL FOR THE DEAF AND
THE BLIND
VERT VERTICAL
W WATER
WPIV WATER POST-INDICATOR VALVE
W/ WITH
@ AT
522C2 CHILHOWIE-EDOM URBAN LAND
COMPLEX, 15 TO 25% SLOPES
522D2 CHILHOWIE-EDOM URBAN LAND
COMPLEX, 15 TO 45% SLOPES
SURVEY NOTES
LEGEND
EXISTING PROPOSED
SYMBOLS
EXISTING PROPOSED
OWNER CONTACT INFORMATION
OWNER: VIRGINIA COMMUNITY COLLEGE SYSTEM
PROJECT MANGER: MIKE WAGNER, VCCO, CAPITAL OUTLAY PROJECT MANAGER
OWNER ADDRESS: 300 ARBORETUM PLACE, SUITE 200, RICHMOND, VA 232236
PHONE: (804) 819-4918
EMAIL: MWAGNER@VCCS.EDU
SURVEY CONTACT INFORMATION
NAME: BRIAN S. HARVEY, LS
PROJECT DESIGNER
COMPANY: WILEY|WILSON
ADDRESS: 127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
PHONE: (434) 455-3247
EMAIL: BHARVEY@WILEYWILSON.COM
1. THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND
RESPONSIBLE CHARGE OF, BRIAN S HARVEY, LS FROM AN ACTUAL GROUND SURVEY
MADE UNDER MY SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS
OBTAINED ON SEPTEMBER 9, 2025 AND THAT THIS PLAT, MAP, OR DIGITAL
GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS
UNLESS OTHERWISE NOTED.
2. SURVEY CONDUCTED BY WILEY|WILSON, SEPTEMBER 2025. VERTICAL CONTROL:
NAVD 88; HORIZONTAL CONTROL: NAD 83 VIRGINIA STATE PLANE COORDINATE
SYSTEM, SOUTH ZONE, U.S. SURVEY FOOT.
3. ALL EXISTING UNDERGROUND UTILITY LOCATIONS AS SHOWN ON THESE PLANS ARE
APPROXIMATE AND MAY NOT REPRESENT ALL UNDERGROUND UTILITIES OR SERVICE
LINES.
4. SOURCE OF EXISTING UTILITY MAPPING: UTILITY LOCATIONS ARE BASED ON QUALITY
LEVEL "B" AS DEFINED BY ASCE STANDARD 38-22 "STANDARD GUIDELINES FOR
INVESTIGATING AND DOCUMENTING EXISTING UTILITIES".
5. CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXACT LOCATION, DEPTH, SIZE, AND
TYPE OF UTILITIES SHOWN AND NOTIFYING ENGINEER OF DISCREPANCIES.
CONTRACTOR IS SOLELY RESPONSIBLE FOR DAMAGE TO PROPERTY, UTILITIES, OR
PHYSICAL IMPROVEMENTS.
6. MISS UTILITY WAS CONTACTED PRIOR TO TOPOGRAPHIC SURVEY. MISS UTILITY
DESIGN TICKET NUMBER A524700852, DATED SEPTEMBER 4, 2025.
7. CONTRACTOR SHALL CONTACT "MISS UTILITY" AT 1-800-552-7001 PRIOR TO
BEGINNING ANY EXCAVATION OR DEMOLITION IN ACCORDANCE WITH THE VIRGINIA
UNDERGROUND UTILITY DAMAGE PREVENTION ACT.
8. PROPERTY LINE INFORMATION IS BASED ON CORRELATION OF FIELD
MEASUREMENTS WITH INFORMATION FOUND IN VARIOUS PLATS AND DEEDS OF
RECORD. NO BOUNDARY SURVEY WAS PERFORMED.
9. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND IS NOT
INTENDED TO SHOW ALL EASEMENTS THAT MAY AFFECT THE PROPERTY.
10. ALL PROPERTY PINS DISTURBED BY CONTRACTOR ACTIVITIES SHALL BE REPLACED
BY A VIRGINIA LICENSED LAND SURVEYOR.
11. THE EXISTENCE OF HAZARDOUS WASTE, VEGETATED WETLANDS, OR TIDAL
WETLANDS WAS NEITHER INVESTIGATED NOR CONFIRMED DURING THE
PERFORMANCE OF THIS SURVEY.
ABBREVIATIONS
GENERAL CIVIL NOTES PROPERTY INFORMATION
PERIMETER CONTROL MEASURES
C-PCM-04 SILT FENCE SF SF SF
SURFACE STABILIZATION MEASURES
C-SSM-09 TEMPORARY SEEDING
C-SSM-10 PERMANENT SEEDING
C-SSM-11 MULCHING
TS
PS
MU
TS
PS
MU
CONCRETE
PATTERNS
EXISTING PROPOSED
LOD
B
J
S
M
BENCHMARK
CONTROL POINT - NAIL SET
DROP INLET
SANITARY MANHOLE
LIGHT POLE
JUNCTION BOX
SPOT LIGHT
WATER METER
WATER VALVE
SIAMESE CONNECTION
POST INDICATOR VALVE
TELEPHONE PEDESTAL
GAS VALVE
GAS FILLER CAP
SIGN
BOLLARD
HOIST
BUSH
REMOVE/DEMOLISH
TPED
CAP
WPIV
WV
GV
HANDRAIL
EDGE OF PAVEMENT
PLANTED AREA
MAJOR CONTOURS
MINOR CONTOURS
UNDERGROUND TELEPHONE
UNDERGROUND FUEL LINE
UNDERGROUND ELECTRIC
SANITARY LINE
STORM LINE
WATER LINE
LIMITS OF DISTURBANCE
REMOVE/DEMOLISH
UNDERGROUND FUEL TANK
I I I I I I
UGT
FG
UGE
SS
SD
W o o o o o o o o
STRUCTURE ID
STDI 147
STDI 422
STRUCTURE DETAILS
RIM = 2275.69
18" RCP INV IN = 2271.51 FROM STDI 422
15" RCP INV OUT = 2271.49 TO
RIM = 2277.54
18" RCP INV IN = 2274.44 FROM
18" RCP INV OUT = 2274.42 TO STDI 147
STRUCTURE ID
SSMH 2
SSMH 420
SSMH 421
STRUCTURE DETAILS
RIM = 2276.49
6" PVC INV IN = 2273.49 FROM SSMH 421
6" PVC INV OUT = 2273.44 TO SSMH 420
RIM = 2275.28
6" PVC INV IN = 2269.78 FROM SSMH 2
6" PVC INV OUT = 2268.23 TO
RIM = 2280.02
6" PVC INV IN = 2277.82 FROM
6" PVC INV OUT = 2275.55 TO SSMH 2
FG
SO
U
TH
W
ES
T
VI
R
G
IN
IA
C
O M
M U
N
IT
Y C
O
LL
EG
E
R
EP
LA
C
E O
IL
B
U R
N
ER
S W
IT
H
G
AS
BO
IL
ER
A
T D
AV
IS
H
AL
L
PR
O
JE
C T
C O
D E:
-B
-0
02/13/2026
250077
C
ED
AR
B
LU
FF
, V
IR
G
IN
IA
X:
\2
5\
S
W
VC
C D av is
H al l B oi le r R ep la c\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
7A
_C
1.
dw g
/1
3/
:1
0p m
G. KEITH THOMPSON, JR.
Lic. No. 41823
123456
E
D
A
B
C
123456
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
DRAWN:
CHECK:
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
NAIL SET 2
N 3543042.30
E 10520858.16
EL 2275.93
WV
WV
2276.376
FH
LPBM 242
CHIS. SQUARE
EL 2279.70
WPIV
M
2277.633
WM
2281.181
WFSC
B
2278.211
BOL
B
2278.166
BOL
HOIST
2278.625
STEP
2278.623
STEP
2269.571
STEP
2269.563
STEP379
2269.574
STEP
2266.179
STEP
2266.188
STEP
2266.365
STEP
SLSLSL
SL
SL
3" HOLLY
2' BUSH
2' BUSH2' BUSH
2' BUSH
2' BUSH2' BUSH
2' BUSH 2' BUSH
2' BUSH2' BUSH
2' BUSH
2' BUSH 411
2282.292
TPED
B
2278.324
BOL
15" RCP
INV 2262.03
PICNIC
TABLE
o o o o o o o o o o o o o o o o o o
COOLING
UNIT
GENERATOR
CONC. W
ALL
STEPS
STEPS
PLANTER
ASPHALT
ASPHALT
CONC.
CONC.
S
SSMH 2
RIM 2276.49
6" PVC OUT 2273.44
6" PVC IN 2273.49
SSSMH 421
RIM 2280.02
6" PVC OUT 2275.55
6" PVC IN 2277.82
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
6" PVC
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
6" P
VC
SS
STDI 147
SIZE = 2.5' X 2.5'
RIM 2275.69
15" RCP OUT 2271.49
18" RCP IN 2271.51
STDI 422
SIZE = 2.5' X 2.5'
RIM 2277.54
18" RCP OUT 2274.42
18" RCP IN 2274.44
SD
SD
SD
SD
SD
SD
SD
SD
" R
CP
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
" R
CP
SD
" R
CP
STEP
2278.625
STEP
STEP
2278.623
STEP
STEP
2269.571
STEP
STEP
2269.563
STEP
STEP
2269.574
STEP
STEP
2266.179
STEP
STEP
2266.188
STEP
STEP
2266.365
STEP
RALPH B. DAVIS HALL
LOD
LO
D
LOD
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
D
UNDERGROUND
PROPANE
TANK
CAP
VENT
GV
CAPFUEL TANK
METAL TOP
"HCAP"
CAT
GKT
GKT
C-101
EXISTING CONDITIONS AND
DEMOLITION PLAN
0 10' 20'
SCALE: 1" = 10'
IF THIS DRAWING IS REDUCED,
GRAPHIC SCALE MUST BE USED.
COORDINATE WITH THE OWNER AND THE GAS DELIVERY
PROVIDER THE EXTRACTION OF EXISTING PROPANE (TO BE
TRANSFERRED TO ANOTHER EXISTING PROPANE TANK) FROM
TANK PRIOR TO DEMOLITION AND EXCAVATION ACTIVITIES.
REMOVE THE 1000 GALLON UNDERGROUND PROPANE TANK,
PIPING, AND ALL RELATED CONNECTION FURNISHINGS FROM
THE BUILDING THAT IS CONNECTED TO THE EXISTING
UNDERGROUND PROPANE TANK. THE UNDERGROUND PROPANE
TANK SIZE AND LOCATION IS APPROXIMATE AND SHOWN
ILLUSTRATIVELY ONLY BASED ON PROVIDED AS BUILT
DRAWINGS
PROTECT EXISTING COMMUNICATIONS. VERIFY LOCATION BY
METHOD OF HAND DIGGING IN THE PROXIMITY OF THE SHOWN
COMMUNICATIONS LINE
VERIFY UNDERGROUND LIGHT OIL STORAGE TANK IS EMPTY.
DAMAGE TO LIGHT OIL STORAGE TANK RESULTING IN SPILLAGE
IS THE RESPONSIBILITY OF THE CONTRACTOR. REMOVE 8000
GALLON LIGHT OIL STORAGE TANK,CONCRETE BALLAST PAD,
ANCHORS, PIPING, AND ALL RELATED CONNECTION
FURNISHINGS FROM THE BUILDING THAT IS CONNECTED TO THE
EXISTING UNDERGROUND LIGHT OIL STORAGE TANK. THE
UNDERGROUND LIGHT OIL STORAGE TANK SIZE AND LOCATION
IS APPROXIMATE AND SHOWN ILLUSTRIOUSLY ONLY BASED ON
PROVIDED AS BUILT DRAWINGS
4 REMOVE VALVE
5 REMOVE VENT
PROTECT EXISTING ELECTRICAL FEED TO LIGHT POLE. VERIFY
LOCATION BY METHOD OF HAND DIGGING IN THE PROXIMITY OF
THE SHOWN ELECTRICAL LINE
7 PROTECT CONCRETE WALL
8 PROTECT CONCRETE CURB
9 REMOVE HANDICAP SIGN TO BE REINSTALLED AFTER
CONSTRUCTION
SHEET KEYNOTES
GENERAL SHEET NOTES
1 SEE SHEET C-001 FOR CIVIL NOTES, ABBREVIATIONS, SYMBOLS,
AND LEGENDS
CONTRACTOR MUST PROTECT ALL EXISTING FEATURES TO
INCLUDE BUT NOT LIMITED TO EXISTING ASPHALT ROAD,
CONCRETE CURBING, UNDERGROUND UTILITIES, LIGHT POLES,
AND LANDSCAPING.
3 REFER TO VIRGINIA STATEWIDE FIRE PREVENTION CODE (SFPC)
2021 SECTION 5704.2.14 REMOVAL AND DISPOSAL OF TANKS.
SO
U
TH
W
ES
T
VI
R
G
IN
IA
C
O M
M U
N
IT
Y C
O
LL
EG
E
R
EP
LA
C
E O
IL
B
U R
N
ER
S W
IT
H
G
AS
BO
IL
ER
A
T D
AV
IS
H
AL
L
PR
O
JE
C T
C O
D E:
-B
-0
02/13/2026
250077
C
ED
AR
B
LU
FF
, V
IR
G
IN
IA
X:
\2
5\
S
W
VC
C D av is
H al l B oi le r R ep la c\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
7A
_C
1.
dw g
/1
3/
:1
0p m
G. KEITH THOMPSON, JR.
Lic. No. 41823
123456
E
D
A
B
C
123456
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
DRAWN:
CHECK:
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
NAIL SET 2
N 3543042.30
E 10520858.16
EL 2275.93
WV
WV
2276.376
FH
LPBM 242
CHIS. SQUARE
EL 2279.70
WPIV
M
2277.633
WM
2281.181
WFSC
B
2278.211
BOL
B
2278.166
BOL
HOIST
2278.625
STEP
2278.623
STEP
2269.571
STEP
2269.563
STEP379
2269.574
STEP
2266.179
STEP
2266.188
STEP
2266.365
STEP
SLSLSL
SL
SL
3" HOLLY
2' BUSH
2' BUSH2' BUSH
2' BUSH
2' BUSH2' BUSH
2' BUSH 2' BUSH
2' BUSH2' BUSH
2' BUSH
2' BUSH 411
2282.292
TPED
B
2278.324
BOL
15" RCP
INV 2262.03
PICNIC
TABLE
o o o o o o o o o o o o o o o o o o
COOLING
UNIT
GENERATOR
CONC. W
ALL
STEPS
STEPS
PLANTER
ASPHALT
ASPHALT
CONC.
CONC.
S
SSMH 2
RIM 2276.49
6" PVC OUT 2273.44
6" PVC IN 2273.49
SSSMH 421
RIM 2280.02
6" PVC OUT 2275.55
6" PVC IN 2277.82
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
6" PVC
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
6" P
VC
SS
STDI 147
SIZE = 2.5' X 2.5'
RIM 2275.69
15" RCP OUT 2271.49
18" RCP IN 2271.51
STDI 422
SIZE = 2.5' X 2.5'
RIM 2277.54
18" RCP OUT 2274.42
18" RCP IN 2274.44
SD
SD
SD
SD
SD
SD
SD
SD
" R
CP
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
" R
CP
SD
" R
CP
TS PS
MU
FG
FG
TS PS
MU
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
SF
10' MIN
STEP
2278.625
STEP
STEP
2278.623
STEP
STEP
2269.571
STEP
STEP
2269.563
STEP
STEP
2269.574
STEP
STEP
2266.179
STEP
STEP
2266.188
STEP
STEP
2266.365
STEP
RALPH B. DAVIS HALL
LOD
LO
D
LOD
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
D
CAT
GKT
GKT
C-102
SITE PLAN
0 10' 20'
SCALE: 1" = 10'
IF THIS DRAWING IS REDUCED,
GRAPHIC SCALE MUST BE USED.
DETAIL
6500 GALLON UNDERGROUND PROPANE TANK.
REFER TO NFPA 58: LIQUEFIED PETROLEUM
GAS CODE, 2020 EDITION, CHAPTER 6 TABLE
6.4.1.1 FOR SEPARATION DISTANCES FROM
BUILDING. TANK MUST BE INSTALLED IN
ACCORDANCE WITH THE PROVISIONS OF
SECTION 6.30 FOR REDUCED SEPARATION
DISTANCE OF 10 FEET, PER SECTION 6.4.2.1.
SEE MECHANICAL DETAILS FOR
COORDINATION.
A6/M-501
2 3/4" POLYETHYLENE PIPING NA
3 REINSTALL REMOVED HANDICAP SIGN NA
4 30" DIAMETER TRAFFIC BEARING FRAME AND
COVER NA
SHEET KEYNOTES
GENERAL SHEET NOTES
1 SEE SHEET C-001 FOR CIVIL NOTES, ABBREVIATIONS, SYMBOLS,
AND LEGENDS
2 TEMPORARY SEED, PERMANENT SEED AND MULCH ALL DISTURBED
AREAS REGARDLESS OF APPROXIMATE LIMITS OF DISTURBANCE
3 APPROXIMATE LIMITS OF DISTURBANCE IS 876 SF
SO
U
TH
W
ES
T
VI
R
G
IN
IA
C
O M
M U
N
IT
Y C
O
LL
EG
E
R
EP
LA
C
E O
IL
B
U R
N
ER
S W
IT
H
G
AS
BO
IL
ER
A
T D
AV
IS
H
AL
L
PR
O
JE
C T
C O
D E:
-B
-0
02/13/2026
250077
C
ED
AR
B
LU
FF
, V
IR
G
IN
IA
X:
\2
5\
S
W
VC
C D av is
H al l B oi le r R ep la c\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
7A
_C
2.
dw g
/1
3/
:1
0p m
G. KEITH THOMPSON, JR.
Lic. No. 41823
123456
E
D
A
B
C
123456
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
DRAWN:
CHECK:
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
PS
TS
*PERENNIAL RYEGRASS WILL GERMINATE FASTER AND AT LOWER SOIL TEMPERATURES
THAN FESCUE, THEREBY PROVIDING COVER AND EROSION RESISTANCE FOR SEEDBED.
**USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED
BELOW:
ANNUAL RYE: MARCH, APRIL THROUGH MAY 15TH
FOXTAIL MILLET: MAY 16TH THROUGH AUGUST 15TH
ANNUAL RYE: AUGUST 16TH THROUGH SEPTEMBER, OCTOBER
WINTER RYE: NOVEMBER THROUGH FEBRUARY
LIME & FERTILIZER SPECIFICATIONS:
A SOILS TEST IS REQUIRED PRIOR TO FINAL SITE STABILIZATION, TO DETERMINE LIME
AND FERTILIZER APPLICATION RATES FOR THE ESTABLISHMENT OF GRASS ON SITE.
CONTACT VIRGINIA COOPERATIVE EXTENSION OR A GEOTECHNICAL FIRM WITH SOIL
TESTING FACILITIES TO OBTAIN A SOILS REPORT FOR NUTRIENT APPLICATION.
INCORPORATION:
LIME AND FERTILIZER SHALL BE INCORPORATED INT0 THE TOP 4 INCHES OF TOPSOIL BY
DISCING OR OTHER MEANS WHENEVER POSSIBLE. FOR EROSION CONTROL, WHEN
APPLYING LIME AND FERTILIZER WITH A HYDROSEEDER, APPLY TO A ROUGH, LOOSE
SURFACE.
MULCHING:
MULCH WITH STRAW AT A RATE OF 2 TONS/ACRE OR EQUIVALENT.
TEMPORARY SEEDING SCHEDULE
PLANTING SPECIES SPECIES RATE (LBS/ACRE)
SEPT 1 - FEB 15 50/50 MIX OF ANNUAL
RYEGRASS (LOLIUM
MULTI-FLORUM) & 50 - 100
CEREAL (WINTER) RYE
(SECALE CERALE)
FEB 16 - APR 30 ANNUAL RYEGRASS
(LOLIUM MULTI-FLORUM) 60 - 100
MAY 1 - AUG 31 GERMAN MILLET (SETARIA
ITALICA) 50
PERMANENT SEEDING SCHEDULE
SITE SPECIFIC SEEDING MIXTURES FOR APPALACHIAN/MOUNTAIN AREA
TOTAL POUNDS PER ACRE
MINIMUM LAWN CARE (COMMERCIAL OR
RESIDENTIAL)
200-250 LBS
KENTUCKY 31 OR TURF-TYPE TALL FESCUE 95-100%
IMPROVED PERENNIAL RYEGRASS* 0-10%
KENTUCKY BLUEGRASS 0-10%
HIGH MAINTENANCE LAWN CARE
MINIMUM OF THREE (3) UP TO FIVE (5) VARIETIES OF
BLUEGRASS FROM APPROVED LIST FOR USE IN
VIRGINIA
125 LBS
GENERAL SLOPE (3:1 OR LESS)
KENTUCKY 31 FESCUE 128 LBS
INDIAN GRASS 2 LBS
SEASONAL NURSE CROP** 20 LBS
150 LBS
LOW MAINTENANCE SLOPE (STEEPER THAN 3:1)
KENTUCKY 31 FESCUE 108 LBS
ROUNDHEADED BUSHCLOVER 2 LBS
SEASONAL NURSE CROP** 20 LBS
INDIAN GRASS 20 LBS
150 LBS
CAT
GKT
GKT
C-501
CIVIL DETAILS
SO
U
TH
W
ES
T
VI
R
G
IN
IA
C
O M
M U
N
IT
Y C
O
LL
EG
E
R
EP
LA
C
E O
IL
B
U R
N
ER
S W
IT
H
G
AS
BO
IL
ER
A
T D
AV
IS
H
AL
L
PR
O
JE
C T
C O
D E:
-B
-0
02/13/2026
250077
C
ED
AR
B
LU
FF
, V
IR
G
IN
IA
X:
\2
5\
S
W
VC
C D av is
H al l B oi le r R ep la c\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
7A
_C
1.
dw g
/1
3/
:1
1p m
G. KEITH THOMPSON, JR.
Lic. No. 41823
123456
E
D
A
B
C
123456
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
DRAWN:
CHECK:
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
HVAC AND MECHANICAL PIPING LEGEND
CONSTRUCTION PHASING
DUCT SYSTEMS
AIR TERMINAL TAGS
S2C
NUMBER: UNIT DESIGNATION
NUMBER: AIRFLOW
R-1 WxH
SIZE: WIDTH x HEIGHT
SENSORS
TEMPERATURE
HUMIDITY
SMOKE
CARBON MONOXIDE
CARBON DIOXIDE
PRESSURE
DIFFERENTIAL PRESSURE
STATIC PRESSURE
OCCUPANCY
CHILLED WATER RETURN
PIPING SYSTEMS
CHR
CHS
CD
FOR
FOS
HWR
HWS
PG
CHILLED WATER SUPPLY
CONDENSATE DRAIN
FUEL OIL RETURN
FUEL OIL SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
PROPANE GAS
NG NATURAL GAS
EMERGENCY STOP SWITCH
MECHANICAL ABBREVIATIONS MECHANICAL GENERAL NOTES
GENERAL
1. REFER TO EACH DRAWING FOR NOTES SPECIFIC TO THAT DRAWING SHEET.
2. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND INDICATE THE GENERAL AND APPROXIMATE LOCATION OF EQUIPMENT, PIPING AND DUCTWORK. DO NOT
SCALE DRAWINGS. THEY ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. A COMPLETE HEATING, VENTILATING AND AIR CONDITIONING SYSTEM (HVAC) WITH ALL NECESSARY EQUIPMENT, APPURTENANCES AND CONTROLS MUST BE PROVIDED. THE CONTRACTOR MUST CAREFULLY REVIEW ALL THE CONTRACT DOCUMENTS AND COORDINATE BETWEEN ALL TRADES PRIOR TO SUBMITTING SHOP DRAWINGS. THE CONTRACTOR MUST VERIFY ALL SIZES, MATERIALS, TEMPERATURE AND PRESSURE RATINGS BEFORE ORDERING OR INSTALLING ANY MATERIALS OR EQUIPMENT. THE CONTRACTOR MUST PREPARE INSTALLATION
INSTRUCTIONS AND FABRICATION DRAWINGS PRIOR TO ACTUAL INSTALLATION.
3. ALL MECHANICAL EQUIPMENT AND ACCESSORIES MUST BE INSTALLED IN STRICT ACCORDANCE WITH THE CURRENT APPROVED EDITION OF THE INTERNATIONAL MECHANICAL CODE (IMC) AND ALL OTHER APPLICABLE LOCAL CODES AND BUILDING STANDARDS, UNLESS DRAWINGS AND/OR SPECIFICATIONS INDICATE WORK
OVER AND ABOVE CODE REQUIREMENTS.
4. FURNISH ALL MATERIALS AND LABOR NECESSARY FOR THE COMPLETION OF WORK UNLESS NOTED OTHERWISE.
5. ALL MISCELLANEOUS MATERIAL REQUIRED TO ENSURE PROPER INSTALLATION MUST BE PROVIDED.
6. ALL MECHANICAL EQUIPMENT AND SYSTEMS MUST BE INSTALLED IN A MANNER WHICH MINIMIZES NOISE AND VIBRATION.
7. ALL MATERIALS REQUIRED FOR PROPER INSTALLATION MUST BE NEW UNLESS THE ITEM IS INDICATED AS EXISTING TO REMAIN OR RELOCATED ON THE
DRAWINGS.
COORDINATION
1. COORDINATE THE INSTALLATION OF ALL WORK WITH THE WORK OF OTHER TRADES. MINOR DEVIATIONS FROM THE PLANS, TO INCLUDE OFFSETS AND TRANSITIONS, MAY BE MADE TO AVOID CONFLICTS. MAJOR CONFLICTS MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO COMMENCEMENT OF
THE WORK.
2. EQUIPMENT SIZES SHOWN ARE BASED UPON TYPICAL MANUFACTURED EQUIPMENT AVAILABLE. SHOP DRAWINGS MUST BE PROVIDED FOR REVIEW AND APPROVAL, SHOWING SPACE FOR ACCESS, EGRESS, MAINTENANCE, AND REQUIRED CODE CLEARANCES PRIOR TO ANY PROCUREMENT, FABRICATION, OR
INSTALLATION.
3. COORDINATE THE ELECTRICAL REQUIREMENTS OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACT DOCUMENTS PRIOR TO ORDERING.
4. DO NOT PLACE PIPING ABOVE ELECTRICAL, COMMUNICATIONS, DATA EQUIPMENT OR PANELS.
PIPING
1. SLOPE CONDENSATE DRAINS AT 1/8" PER FOOT MINIMUM IN THE DIRECTION OF FLOW. PROVIDE FITTINGS TO ALLOW CLEANING OF ENTIRE SYSTEM.
2. ALL PIPING MUST HAVE ITS SLOPE AND INVERT ESTABLISHED PRIOR TO THE INSTALLATION OF ANY PIPING.
3. ALL PIPING SYSTEMS THAT ARE NOT OPEN TO ATMOSPHERE MUST BE PROVIDED WITH VALVED DRAINS AT LOW POINTS AND MANUAL AIR VENTS AT HIGH POINTS.
4. PROVIDE UL LISTED FIRESTOPPING ASSEMBLIES FOR EACH PENETRATION OF RATED ASSEMBLIES.
5. ALL PIPING MUST BE SLEEVED THROUGH MASONRY WALL PENETRATIONS. ALL PARTITION PENETRATIONS MUST BE ACOUSTICALLY SEALED.
6. SIZE AND ROUTE REFRIGERANT PIPING PER EQUIPMENT MANUFACTURER'S WRITTEN INSTRUCTIONS.
7. CONNECTIONS BETWEEN DISSIMILAR METALS MUST BE MADE WITH DIELECTRIC FITTINGS.
EQUIPMENT
1. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
2. ALL MECHANICAL EQUIPMENT MUST BE INSTALLED IN SUCH A MANNER SO THAT ALL FILTERS, VALVES, MOTORS, DAMPERS, ETC., ARE COMPLETELY ACCESSIBLE
AND SERVICEABLE, INCLUDING ACCESS DOORS IF REQUIRED.
3. COMPLETE AND PROPER INSTALLATION OF THERMOSTATS AND ALL OTHER NECESSARY FIELD MOUNTED CONTROL COMPONENTS MUST BE THE RESPONSIBILITY OF THE MECHANICAL OR CONTROLS CONTRACTOR. THE EQUIPMENT MANUFACTURER MUST FURNISH COMPLETE WIRING CONTROLS. ALL CONTROL WIRING IN MECHANICAL ROOMS OR AREAS SUBJECT TO DAMAGE MUST BE IN CONDUIT AND INSTALLED PER ELECTRICAL CONTRACT DOCUMENTS.
4. PROVIDE FLEXIBLE CONNECTIONS BETWEEN HVAC EQUIPMENT AND SHEET METAL DUCTWORK.
RENOVATION WORK
1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY, AND PREVIOUS RECORD DRAWINGS FORM THE BASIS FOR MANY OF THESE DRAWINGS. FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. THERE MAY EXIST FIELD CONDITIONS WHICH DIFFER FROM THOSE SHOWN ON THESE DRAWINGS. ANY SUCH DEVIATIONS MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR MATERIAL/EQUIPMENT PURCHASE WHICH WOULD BE UNUSABLE UNDER THOSE CIRCUMSTANCES.
UNDERGROUND PROPANE STORAGE TANK
1. UNDERGROUND TANK MUST BE INSTALLED TO INCLUDE ALL NECESSARY PROVISIONS OF SECTION 6.30 OF NFPA 58: LIQUEFIED PETROLEUM GAS CODE, 2020, TO COMPLY WITH THE REDUCED SEPARATION DISTANCE OF 10 FEET, IN ACCORDANCE WITH TABLE 6.4.1.1 AND SECTION 6.4.2.1
S=SUPPLY
R=RETURN
NECK SIZE:
E=EXHAUST
T=TRANSFER
D=12" E=14" F=16"
DEMOLITION
WORK IN THIS PHASE
KEYNOTE
POINT OF
CONNECTION
POINT OF
DISCONNECTION
DEMO EXISTING TO REMAIN
WORK IN
THIS PHASE
EXISTING TO REMAIN
T
CO
CO2
P
DP
SP
ESS
OCC
A=6" B=8" C=10"
EXISTING TO REMAIN
SD
H
NUMBER: UNIT DESIGNATION
NUMBER: AIRFLOW
S=SUPPLY
R=RETURN
E=EXHAUST
T=TRANSFER
ROUND DUCT
RECTANGULAR12"x10"
12"ø
SUPPLY DUCT
RETURN DUCT
EXHAUST DUCT OVAL DUCT23"/10"
DOWN UP DUCT DIMENSIONS
BELOW GRADE
AFMS
FS
S
F
M
DUCT ACCESSORIES
DAMPER,
MANUAL
BALANCING
DAMPER,
BACKDRAFT
DAMPER,
CONTROL
DAMPER,
FIRE
DAMPER,
SMOKE
DAMPER,
FIRE & SMOKE
SECURITY
BARS
AIRFLOW
MONITORING
STATION
FLEXIBLE
DUCT
45 DEG
BEND
90 DEG
BEND
GOREDMITERED
DOWN
90 DEG
BEND
45 DEG
BEND
UP
90 DEG
BEND
45 DEG
BEND
RECTANGULAR DUCT FITTINGS
MITERED RADIUS
ROUND DUCT FITTINGS
OVAL DUCT FITTINGS
DOWN
TEE
TEE UP
TEE DN
90 DEG
ELBOW
45 DEG
ELBOW
PIPE UP
PIPE DN
REDUCER,
ECCENTRIC
REDUCER,
CONCENTRIC
FLANGE
JOINT
BLIND
FLANGE
PIPE
CAP
VALVE, GLOBE
VALVE, GATE
VALVE, CHECK
VALVE, BUTTERFLY, CONTROL
VALVE, BUTTERFLY, MANUAL
VALVE, BALL, CONTROL
VALVE, BALL, MANUAL
VALVE, BALANCING
WYE STRAINER
PIPE ACCESSORIES PIPE FITTINGS
UP
UPDOWN
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
LEGEND, ABBREVIATIONS
& GENERAL NOTES
SWL
ZDA
02/13/2026
250077
M-001
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
(D) DEMOLISH
(E) EXISTING ELEMENT TO REMAIN
ACC AIR COOLED CHILLER
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASUREMENT STATION
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
APPROX APPROXIMATELY
ARCH ARCHITECTURE
AS AIR SEPARATOR
ATFP
ANTI-TERRORISM / FORCE
PROTECTION
BEL BELLMOUTH FITTING
BT BUFFER TANK
CD CONDENSATE DRAIN
CDW CONDENSER WATER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CLG COOLING OR CEILING
CO CLEANOUT
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COND CONDENSATE OR CONDENSER
CT COOLING TOWER
CU CONDENSING UNIT
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROL
DEG DEGREES
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DI DIGITAL INPUT
DN DOWN
DO DIGITAL OUTPUT
DOAS DEDICATED OUTDOOR AIR SYSTEM
DP DIFFERENTIAL PRESSURE
EA EXHAUST AIR OR EACH
EF EXHAUST FAN
EL ELEVATION
ESS EMERGENCY STOP SWITCH
EXH EXHAUST
F OR °F DEGREES FAHRENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER
FO FUEL OIL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FOOT OR FEET
FZ FREEZESTAT
GA GAUGE
GAL GALLON (U.S.)
GALV GALVANIZED
GPM GALLONS PER MINUTE
H HUMIDITY
HGI HOODED GRAVITY INTAKE
HGR HOODED GRAVITY RELIEF
HPC HIGH PRESSURE CONDENSATE
HPS HIGH PRESSURE STEAM
HWB HOT WATER BOILER
HWP HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
L LOUVER
LPC LOW PRESSURE CONDENSATE
LPS LOW PRESSURE STEAM
MPC MEDIUM PRESSURE CONDENSATE
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
NC
NOISE CRITERIA OR NORMALLY
CLOSED
NG NATURAL GAS
NO NUMBER OR NORMALLY OPEN
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OCC OCCUPANCY
P PRESSURE
PC PUMPED CONDENSATE
PG PROPANE GAS
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
RA RETURN AIR
REF REFRIGERANT
RH RELATIVE HUMIDITY
RLF RELIEF AIR
SA SUPPLY AIR
SD
SMOKE DAMPER OR SMOKE
DETECTOR
SF SQUARE FEET
SFD
COMBINATION FIRE & SMOKE
DAMPER
SP STATIC PRESSURE
STD STANDARD
STL STEEL
T TEMPERATURE
TB TERMINAL BOX
TSTAT THERMOSTAT
TUC TERMINAL UNIT CONTROLLER
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VLV VALVE
VRF VARIABLE REFRIGERANT FLOW
W/ WITH
W/O WITHOUT
WG WATER GAUGE
XFER TRANSFER
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
10/16/202002/13/202502/13/2026
M
V F
D V
F D
(D) B-2
(D) B-1
LADDER
ACCESS TO
BASEMENT
(E) CHIMNEY
(E) DHW HEATER
(D) ET-2
(D) CHEMICAL POT
FEEDER AND WATER
FILTER
FURNACE ROOM
(E) 40" X 40"
SUPPLY AIR
LOUVER 3600 CFM
(E) S-3
(D) 12"ø FLUE
(D) 18"ø FLUE
(E) B-3
(D) HWP-3
(D) HWP-4
(D) 1/2" FOS
(E) HWP-7
(D) HWP-5
(D) HWP-6
(E) 4" CHS (E) 3" HWS
(E) 4" FIRE PROTECTION
(E) 4" CHS
(E) 4" CHR
(E) AS
(D) AS
(E) EXPANSION
TANK
(E) 40" X 40" INTAKE
AIR LOUVER
(E) CHEMICAL POT
FEEDER AND
WATER FILTER
(E) 3" HWR
FROM BUILDING
(E) 3" CHR
FROM BUILDING
(E) ELECTRICAL
EQUIPMENT
(E) CONTROL
PANELS
(E) CWP-2
(E) CWP-1
LADDER
ACCESS TO
FIRST FLOOR
(D) 1/2" FOS
(D) 1/2" FOS
(D) 1/2" FOR
(D) FUEL OIL PIPING
ROUTED UP THRU
FLOOR
(D) FUEL OIL PUMP
(E) FIRE PROTECTION
PIPING UP
BASEMENT
(D) ABANDONED FUEL OIL PIPING
THROUGH MECHANICAL ROOM
FLOOR SLAB
(E) CHIMNEY
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
KEY PLAN
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
MECHANICAL
DEMOLITION PLANS
SWL
ZDA
02/13/2026
250077
MD101
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
SCALE: 3/8" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN
A4
GENERAL NOTES
KEYNOTES
KEY PLAN
GRAPHIC SCALE(S)
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
PLAN
NORTH
SCALE: 3/8" = 1'-0"
BASEMENT MECHANICAL DEMOLITION PLAN
A6
1. DEMOLISH ALL FUEL OIL PIPING TO UNDERGROUND FUEL OIL TANK. SEE
CIVIL SHEET C-101 FOR CONTINUATION. PATCH AND REPAIR PIPE
OPENINGS THROUGH WALL AND FLOOR TO MATCH EXISTING CONDITIONS.
2. PROVIDE SHUTOFF VALVE AND DEMOLISH DOMESTIC COLD WATER
MAKEUP PIPING TO POINT SHOWN.
3. PATCH AND REPAIR CHIMNEY TO MATCH EXISTING CONDITIONS.
4. EXISTING 4" CHW TO/FROM AIR-COOLED CHILLER.
5. DEMOLISH VARIABLE FREQUENCY DRIVES THAT SERVE HWP-3/4.
6. PRESSURE REDUCING VALVE AND BYPASS ON DOMESTIC COLD WATER
MAKEUP.
7. DISCONNECT 2" PRESSURE DIFFERENTIAL BYPASS CONTROL VALVE AND
PRESERVE FOR RECONNECTION.
1. REFER TO SHEET M-001 FOR PROJECT GENERAL NOTES.
2. REMOVE ALL MECHANICAL EQUIPMENT AS SHOWN.
3. REMOVE ALL PIPING AND PIPING ACCESSORIES AS SHOWN.
WALL TYPE LEGEND:
FIRE BARRIER - EXISTING 1
HOUR RATED MIN. PROTECTED
OPENINGS.
FIRE BARRIER - EXISTING 2
HOUR RATED MIN. PROTECTED
OPENINGS.
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
M
F
D V
F D
A6 M-101 M-301
HWP-3
HWP-4
A4 M-101 M-301
(E) B-3
LADDER ACCESS
TO BASEMENT
(E) CHIMNEY
(E) DOMESTIC HOT
WATER HEATER
(E) EXPANSION
TANK
ET-2
CHEMICAL POT
FEEDER
(E) ELECTRICAL
EQUIPMENT
(E) 40" X 40"
SUPPLY AIR
LOUVER 3600 CFM
(E) 40" X 40" INTAKE
AIR LOUVER
(E) CHEMICAL POT
FEEDER AND
WATER FILTER
FURNACE ROOM
(E) CWP-1
(E) CWP-2
(E) S-3
(E) 4" FIRE
PROTECTION PIPING
(E) DOMESTIC
WATER ENTRANCE
(E) HWP-7
(E) 4" FIRE PROTECTION
(E) 4" CHS (E) 3" HWS
HWP-5
PROPANE GAS
REGULATOR
(E) AS
(E) 3" HWR
FROM BUILDING
(E) CHW PIPING TO AIR
COOLED CHILLER OUTSIDE
(E) 3" CHR
FROM BUILDING
4" HWS
4" HWS
4" HWS
CSD-1
CSD-1
(E) EQUIPMENT PAD
AS-1
(E) CONTROL
PANELS
SF-1
(E) FD
(E) FD
2" HWS
2" HWS
(E) FD
2" PG
B-1
(E) 3" HWS
1" CD
2" BYPASS
3" HWS
4" HWR
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
KEY PLAN
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
FIRST FLOOR
MECHANICAL PLAN
SWL
ZDA
02/13/2026
250077
M-101
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
GENERAL NOTES
KEYNOTES
KEY PLAN
GRAPHIC SCALE(S)
SCALE: 3/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN
A4
0 2' 4' 6'
SCALE: 3/8" = 1'-0"
PLAN
NORTH
1. 3/4" PG RISES ABOVE GRADE TO REGULATOR. SIZE REGULATOR FOR 517
CFH WITH 10 PSIG INLET PRESSURE AND 13" W.C. OUTLET PRESSURE PER
BOILER PRESSURE REQUIREMENTS. PENETRATE EXTERIOR WALL
APPROXIMATELY 2' AFF. SEE CIVIL SHEET C-102 FOR CONTINUATION.
2. VARIABLE FREUENCY DRIVES. SEE ELECTRICAL SHEETS FOR
COORDINATION.
3. 6" DIAMETER INTAKE AIR, UP THRU ROOF. SEE DETAIL ON M-502 FOR ROOF
PENETRATION.
4. 8" DIAMETER FLUE EXHAUST, UP THRU ROOF. SEE DETAIL ON M-502 FOR
ROOF PENETRATION.
5. CONNECT TO EXISTING MAKEUP WATER LINE WITH EXISTING TO REMAIN
RPZ BACKFLOW PREVENTER.
6. ASME CSD-1 SHUTDOWN SWITCH LOCATION.
7. PRESSURE REDUCING VALVE AND BYPASS ON 1" DOMESTIC COLD WATER
MAKEUP.
8. PROVIDE BOILER MANUFACTURER CONDENSATE TRAP. INSTALL PER IOM.
9. PROVIDE BOILER MANUFACTURER CONDENSATE NEUTRALIZATION KIT.
INSTALL PER IOM.
10. RECONNECT EXISTING 2" PRESSURE DIFFERENTIAL BYPASS CONTROL
VALVE.
1. REFER TO SHEET M-001 FOR PROJECT GENERAL NOTES.
2. MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES AROUND ALL
EQUIPMENT.
3. DO NOT ROUTE PIPING ABOVE ELECTRICAL OR COMMUNICATION
EQUIPMENT.
WALL TYPE LEGEND:
FIRE BARRIER - EXISTING 1
HOUR RATED MIN. PROTECTED
OPENINGS.
FIRE BARRIER - EXISTING 2
HOUR RATED MIN. PROTECTED
OPENINGS.
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
(E) CHIMNEY
WORKING AREA
(E) ROOF DRAIN
M
IN
F
R O
M W
A L
L
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
KEY PLAN
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
ROOF MECHANICAL PLAN
SWL
ZDA
02/13/2026
250077
M-102
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
GENERAL NOTES
KEYNOTES
KEY PLAN
GRAPHIC SCALE(S)
0 2' 4' 6'
SCALE: 3/8" = 1'-0"
PLAN
NORTH
SCALE: 3/8" = 1'-0"
ROOF MECHANICAL PLAN
A4
1. 6" DIAMETER INTAKE AIR. SEE DETAIL ON M-502 FOR ROOF PENETRATION.
2. 8" DIAMETER FLUE EXHAUST. SEE DETAIL ON M-502 FOR ROOF
PENETRATION.
3. ROOF CONTINUES.
1. REFER TO SHEET M-001 FOR PROJECT GENERAL NOTES.
2. MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES AROUND ALL
EQUIPMENT.
3. DO NOT ROUTE PIPING ABOVE ELECTRICAL OR COMMUNICATION
EQUIPMENT.
4. CONTRACTOR RESPONSIBLE FOR PROVIDING ROOF PROTECTION DURING
AND FOLLOWING ALL ROOF WORK.
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
0' - 0"
First Floor Level
14' - 9 15/16"
B.O. Roof Deck
13' - 0 3/4"
B.O. Joist
HWP-3
HWP-4
4" HWS
4" HWS
4" H
W S
4" HWS
4" HWS
(E) FIRE
PROTECTION PIPING
(E) 2" MOTORIZED CONTROL
VALVE
2" PG
ET-2
CHEMICAL POT FEEDER
DCW MAKEUP
SF-1
4" HWS
2" PG
2" HWS
2" HWS
4" HWS FROM
BOILERS
15' - 9 15/16"
T.O. ROOF DECK
4"
H W
S
2" HWS
0' - 0"
First Floor Level
14' - 9 15/16"
B.O. Roof Deck
13' - 0 3/4"
B.O. Joist
B-1
HWP-5
15' - 9 15/16"
T.O. ROOF DECK
2" PG
6"ø OA
8"ø FLUE
3" HWR
3" HWS
3" HWS
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
SECTIONS
SWL
ZDA
02/13/2026
250077
M-301
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
SCALE: 1/2" = 1'-0"M-301M-101
FIRST FLOOR MECHANICAL SECTION - P-3A6
SCALE: 1/2" = 1'-0"M-301M-101
FIRST FLOOR MECHANICAL PLAN - B-1A4
GENERAL NOTES
KEYNOTES
GRAPHIC SCALE(S)
1. EXISTING HOUSEKEEPING PAD.
2. PROVIDE BOILER MANUFACTURER CONDENSATE TRAP. INSTALL PER IOM.
3. PROVIDE BOILER MANUFACTURER CONDENSATE NEUTRALIZATION KIT.
INSTALL PER IOM.
4. RECONNECT EXISTING 2" PRESSURE DIFFERENTIAL BYPASS CONTROL
VALVE.
1. REFER TO SHEET M-001 FOR PROJECT GENERAL NOTES.
2. MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES AROUND ALL
EQUIPMENT
3. DO NOT ROUTE PIPING ABOVE ELECTRICAL OR COMMUNICATION
EQUIPMENT.
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
M-101 M-501
C3
M-102 M-501
A4
M-102 M-501
A2
C-102 M-501
A6
A
B
C
D
E
F
G
COMMERCIAL LIQUID PROPANE STORAGE TANK - 6,500 GALLONS
TANK MANUFACTURER'S PRECAST CONRETE DEADMAN SYSTEM
HOLD DOWN STRAP WITH TURNBUCKLE ASSEMBLY
LIQUID WITHDRAW VALVE
SERVICE VALVE
FILL VALVE
SAFETY RELIEF VALVE (250 PSI)
TANK COMPONENT SCHEDULE
ITEM DESCRIPTION
A
B B
C
NOTES:
1. INSTALL STORAGE TANK AND ALL TANK COMPONENTS PER TANK MANUFACTURER'S RECOMMENDATIONS AND PROVISIONS OF NFPA 58, SECTION 6.4.2.1, 6.30, AND 6.30.3.5 FOR REDUCED SEPARATION DISTANCE FROM A
BUILDING.
2. UNDERGROUND CONTAINERS SHALL BE INSTALLED SO THAT THE POINT OF DISCHARGE FROM PRESSURE RELIEF
DEVICES ARE LOCATED ABOVE THE NORMAL MAXIMUM WATER TABLE.
3. THE MANHOLE LID SHALL BE VENTILATED WITH OPENINGS THAT EQUAL OR EXCEED THE COMBINED DISCHARGE AREAS OF THE PRESSURE RELIEF DEVICES AND OTHER VENT LINES THAT DISCHARGE INTO THE MANHOLE OR
HOUSING.
TOP OF GRADE
SEE CIVIL DWGS
SAND BACKFILL
AROUND TANK PER
MANUFACTURER'S
INSTRUCTIONS
NOT TO SCALE
UNDERGROUND LIQUID PROPANE STORAGE TANK DETAIL
NOT TO SCALE
PROPANE PRESSURE REGULATOR & PIPE
PENETRATION DETAIL
SHUT-OFF VALVE
6" LONG DIRT LEG
THREADED CAP
FINISHED FLOOR
BUILDING WALL
PIPE SLEEVE, SEE DETAIL
UNION
VENT WITH WEATHER ELBOW
2ND-STAGE GAS PRESSURE REGULATOR
INSULATED FITTING
SHUT-OFF VALVE
TOP OF GRADE
18" APPROX.
12"
24" MIN.
MAGNETIC WARNING AND
IDENTIFICATION TAPE
POLYETHYLENE
ANODELESS RISER
NOTES:
1. ALL PIPING IS TO RUN UNDERGROUND AND WILL BE INSTALLED AND SUPPORTED AT THE BUILDING WALL EXTERIOR.
2. PAINT ALL EXPOSED PIPING.
3. LEAVE 1/2" AROUND THE PIPE AND FILL WILL EXPANSION JOINT FILLER.
D
E
48" DIA FIBERGLASS CONTAINMENT COLLAR
48" DIA FIBERGLASS 8 SIDED SW CONTAINMENT SUMP
WITH WATERTIGHT TOP
30" ACCESS MANHOLE W/ TRAFFIC BEARING FRAME AND COVER
H
I
J
H
I
J
F
G
K
K
L
M
L
M
35 DEGREE MIN
BOILER EXHAUST FLUE ROOF PENETRATION DETAIL
BOILER COMBUSTION AIR INLET DETAIL
NOTE:
PROVIDE GUY WIRES IF REQUIRED BY BOILER MANUFACTURER.
NOTE:
PROVIDE FOUR GUY WIRES AT 90 DEGREES FROM EACH OTHER.
1ST-STAGE PRESSURE REGULATOR (10 PSI OUTLET PRESSURE)
ROOF FLASHING
ADHERE TO EXISTING ROOF
MEMBRANE AND TALL CONE
FLASHING
TALL CONE FLASHING. 12" TALL WITH
28"X28" BASE PLATE AND 16" DIA OPENING
AT BOTTOM. SECURE TO STEEL PLATE
STORM COLLAR
SUPPORT PLATE PLAN VIEW
NOT TO SCALE
INSTALL STACK PER MANUFACTURER'S
RECOMMENDATIONS AND PER LOCAL
REGULATIONS MIN 36" ABOVE INTAKE
DISCHARGE STACK, PROVIDE VENT CAP
PER MANUFACTURER'S INSTRUCTIONS
8" DIA BOILER FLUE
EXHAUST
1/4" THICK X 30" SQUARE STEEL PLATE.
SCREW TO METAL DECKING
VERTICAL PLATE SUPPORT
WITH 17" X 15.5" BASE PLATE
SECURE TO STEEL PLATE
1/4" THICK X 30" SQUARE
STEEL PLATE WITH
OPENING IN MIDDLE FOR FLUE
ATTACH PLATE TO DECK RIDGES
WITH # 14 PHILLIPS MODIFIED
TRUSS SELF-DRILLING SCREWS
AT 8" ON CENTER MAXIMUM
RAIN COLLAR
FLASHING CONE
ANCHOR TO CONCRETE
SLAB
BOILER B-1 INTAKE
6" DIA
(E) METAL DECK
(E) ROOF INSULATION
AND MEMBRANE
PROVIDE BIRDSCREEN
90 DEG
ELBOW
6" DIA INTAKE,
STAINLESS STEEL PIPE
M
IN
A
B O
V E
F
IN
IS
H
E D
R O
O F
NOT TO SCALE
(E) EPDM ROOF
(E) HD ISO BOARD
(E) ISO BOARD INSULATION
(E) METAL DECK
(E) ROOF INSULATION
AND MEMBRANE
(E) EPDM ROOF
(E) HD ISO BOARD
(E) ISO BOARD INSULATION
MANUAL SHUTOFF VALVE
BACKFLOW CHECK VALVE
S.S. GUY WIRE TENSIONER (TYP)
GUY WIRE ANCHOR
W/ THIMBLE (TYP)
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
DETAILS
SWL
ZDA
02/13/2026
250077
M-501
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
ISOLATION
BUTTERFLY VALVE
WYE STRAINER WITH
BLOW DOWN VALVE & CAP
BOILER CIRCULATION
PUMP
TRIPLE DUTY VALVE
PRESSURE GAUGE (TYP)
THERMOMETER (TYP)
FLOW
SWITCH
UNION OR
FLANGE (TYP)
BOILER
FACTORY PROVIDED T&P RELIEF
VALVE (50 PSI, CONFIRM WITH
MANUFACTURER PROVIDE VALVE)
CONDENSATE DRAIN TO MANUFACTURER PROVIDED
CONDENSATE TRAP AND NEUTRALIZATION KIT.
(E) HOUSEKEEPING PAD
SHUTOFF VALVE
TEST PORT (TYP)
DIRT LEG
FLUE
COMBUSTION AIR INTAKE
HEATING WATER
SUPPLY & RETURN
FS
1"
AIR SEPARATOR
TO PUMP SUCTION
HIGH CAPACITY
AIR VENT
RELIEF VALVE, 75 PSIG
ROUTE DISCHARGE TO FD
WYE STRAINER
PRESSURE REDUCING VALVE,
(18 PSIG)
BALL VALVE (TYP)
QUICK FILL MANUAL BYPASS
GLOBE VALVE
PRESSURE GAUGE 0-100 PSIG (TYP)
AIR VENT
EXPANSION TANK
(E) HOUSEKEEPING PAD
ANTI-
THERMOSYPHON
LOOP
FROM (E)
BACKFLOW
PREVENTER
1"
DRAIN BALL VALVE WITH
HOSE END CONNECTION
CAPPED (TYP)
TANK PURGE VALVE ASSEMBLY
BALL VALVE
DRAIN
PUMP DISCHARGE
HOUSEKEEPING PAD
SHOT
FEEDER
ANCHOR BOLTS
MANUAL AIR VENT
FACTORY PROVIDED
SUPPORT LEGS
PUMP SUCTION
3/4"
UNION (TYP)
BALL VALVE (TYP)
ADJUST BALANCING VALVE TO
PREVENT OVERFLOWING
BALL VALVE WITH HOSE
END CONNECTION CAPPED
3/4"
BALL VALVE (TYP)
BALANCING VALVE (5 GPM)
ROUTE TO NEAREST DRAIN
PRESSURE GAUGE (TYP)
UNION (TYP)
CHECK VALVE
(E) HOUSEKEEPING PAD
WATER
FILTER
MANUAL AIR VENT
2"
2"
PUMP DISCHARGE
PUMP SUCTION
1. ALL VALVES, STRAINERS, FITTINGS ETC. SHALL BE FULL LINE SIZE.
2. PROVIDE SPOOL PIECES AS NECESSARY TO MAINTAIN ALL MANUFACTURER CLEARANCE REQUIREMENTS.
NOTES:
SUCTION DIFFUSER W/
COARSE STRAINER
DRAIN BALL VALVE
PRESSURE GAUGE (TYP)
BUTTERFLY VALVE (TYP)
SUPPLY RETURN
TRIPLE DUTY VALVE
CONCRETE INERTIA BASE
(E) HOUSEKEEPING
PAD
FLEXIBLE CONNECTION (TYP)
DIFFERENTIAL PRESSURE
MANIFOLD WITH SUCTION AND
DISCHARGE TEST PORTS.
CONCENTRIC REDUCER
FLANGE CONNECTION (TYP)
VIBRATION
ISOLATOR (TYP)
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
DETAILS
SWL
ZDA
02/13/2026
250077
M-502
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
SCALE: NOT TO SCALEM-502
CONDENSING PROPANE FIRED BOILER DETAILC3
M-101
SCALE: NOT TO SCALEM-502
EXPANSION TANK PIPING DETAILA2
M-101
SCALE: 1" = 1'-0"M-502
SHOT FEEDER DETAILC5
M-101
SCALE: 1" = 1'-0"M-502
SIDESTREAM FILTER DETAILD5
M-101
SCALE: NOT TO SCALEM-502
END SUCTION SINGLE STAGE PUMP DETAIL WITH TRIPLE DUTY VALVEA5
M-101
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
02/13/2026
AI
NI
G
RI
V
P R O F
E
SSIONAL EN
G
IN
E E R
OF
C O M M O N
W
EA
LTH
MARK R. PUCCINELLI JR
Lic. No. 061647
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/1
/2
:5 :1
A
M
C L o c a l R e v it \2
R
M
C
E N ta m e s C
T
A Y
.r v t
SCHEDULES
SWL
ZDA
02/13/2026
250077
M-601
MRP
S O
U T
H W
E S
T V
IR
G
IN
IA
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P L A
C E
O
IL
B U
R N
E R
S W
IT
H
G A
S B
O
IL
E R
A T
D A
V
IS
H A
L L
C E
D A
R B
L U
F F
V
IR
G
IN
IA
P R
O J E
C T
C O
D E
-B
-0
GENERAL NOTES:
1. THE DESIGN SHOWN IS BASED ON THE MANUFACTURERS AND MODEL
NUMBERS SHOWN AND IS INTENDED ONLY TO SHOW THE GENERAL SIZE,
CONFIGURATION, LOCATION, CONNECTIONS AND SUPPORT FOR THE
EQUIPMENT OR SYSTEMS SPECIFIED WITH RELATION TO OTHER BUILDING
SYSTEMS. SEE SPECIFICATIONS FOR TECHNICAL REQUIREMENTS
PERTAINING TO THE EQUIPMENT.
RELIEF VALVE PRESSURE SETTING (PSI) 75
PRECHARGE PRESSURE (PSI) 18
FILL PRESSURE (PSI) 18
MINIMUM ACCEPTANCE VOLUME (GAL) 70
TANK SIZE (GAL) 80
TYPE BLADDER
CONFIGURATION VERTICAL
SERVICE HEATING HOT WATER
LOCATION 101
DESIGNATION ET-2
EXPANSION TANK SCHEDULE
MAXIMUM PRESSURE DROP (FT-H2O) 1.5
DESIGN FLOW RATE (GPM) 200
LINE SIZE (IN) 4
SERVICE HEATING HOT WATER
LOCATION 101
DESIGNATION AS-1
AIR SEPARATOR SCHEDULE
1. PROVIDE TANK LEVEL MONITORING POINT TO BAS.
REMARKS
BASIS OF DESIGN MODEL LPG
BASIS OF DESIGN MANUFACTURER HIGHLAND TANK
OVERALL LENGTH (FT-IN) 24'-10"
STRAIGHT SHELL LENGTH (FT-IN) 20'-11"
DIAMETER (FT-IN) 7'-0"
VOLUME (GAL) 6500
INSTALLATION TYPE UNDERGROUND
GAS TYPE PROPANE
PROPANE TANK SCHEDULE
3. CONSTANT VOLUME.
2. PROVIDE MOTORS WITH SHAFT GROUNDING RING.
1. PROVIDE PUMP ON VARIABLE FREQUENCY DRIVE, PROVIDE INVERTER-DUTY MOTOR.
REMARKS LEGEND:
REMARKS 1 & 2 1 & 2 3
BASIS OF DESIGN MODEL E-1510 E-1510 E-80
BASIS OF DESIGN MANUFACTURER BELL & GOSSETT BELL & GOSSETT BELL & GOSSETT
HERTZ 60 60 60
PHASE 3 3 3
VOLTS 480 480 480
RPM 1,800 1,800 1,800
HORSEPOWER 15 15 1-1/2
MOTOR DATA - - - - - -
DISCHARGE (IN) 2 2 2.5
SUCTION (IN) 3 3 2.5
CONNECTION SIZE - - - - - -
MINIMUM EFFICIENCY (%) 72.6 72.6 60
FLUID WATER WATER WATER
TOTAL HEAD (FT-H2O) 120 120 30
FLOW (GPM) 200 200 120
PUMP DATA - - - - - -
TYPE BASE MOUNTED END SUCTION BASE MOUNTED END SUCTION IN-LINE
SERVICE HEATING HOT WATER HEATING HOT WATER HEATING HOT WATER
LOCATION 101 101 101
DESIGNATION HWP-3 HWP-4 HWP-5
PUMPS SCHEDULE
BASIS OF DESIGN MODEL FBF-0101
BASIS OF DESIGN MANUFACTURER EATON
MAX ALLOWABLE FLOW (GPM) 88
FLOW (GPM) 5
MAX PRESSURE (PSI) 150
CONNECTION SIZE (IN) 2
FILTER TYPE BAG
SERVICE HEATING HOT WATER
LOCATION 101
DESIGNATION SF-1
SIDESTREAM FILTER SCHEDULE
2. PROVIDE MANUFACTURER CONDENSATE TRAP AND NEUTRALIZATION KIT.
1. PROVIDE CSD-1 BURNER CONTROLS.
REMARKS LEGEND:
REMARKS 1, 2
MODEL FBL1251
BASIS OF DESIGN LOCHINVAR
FLUE EXHAUST CONNECTION SIZE (IN) 8
AIR INTAKE CONNECTION SIZE (IN) 6
FREQUENCY (Hz) 60
PHASE 1
VOLTAGE (V) 120
TOTAL AMPS (A) 1.5
ELECTRICAL - -
HWS TEMPERATURE (DEG F) 180
HEAD LOSS (FT H20)…