This Addendum No. 2 document modifies the sealed bid documents for the Replace Oil Burners with Gas Boiler at Davis Hall project at Southwest Virginia Community College (Project Code 260-B5260-046), issued by Wiley|Wilson on March 20, 2026. The project involves the demolition of one 8,000-gallon underground fuel oil storage tank, one 1,000-gallon underground propane storage tank, and two 1250 MBH fuel oil boilers with associated hot water pumps, and the installation of a new 6,500-gallon underground propane storage tank, a 1,300 MBH propane boiler, and system hot water pumps. The sealed bid deadline is 2:00 P.M. on March 25, 2026, with bids to be opened publicly on March 26, 2026, at the Virginia Community College System office in Richmond, Virginia. Bids may be submitted electronically through eVA or in person at the VCCS office, with modifications permitted by fax and email prior to the deadline.
The addendum addresses four pre-bid questions received as of March 18, 2026, clarifying key contractor responsibilities. James River Solutions supplies fuel oil and Foster Fuels provides propane for the college. The contractor is responsible for removal and disposal of both the old fuel oil tank and existing fuel, with the fuel oil tank confirmed as empty; the contractor must verify this condition prior to removal. The contractor is also responsible for coordinating with the owner and gas delivery provider for extraction of existing propane before demolition. Regarding environmental liability, soil samples around the tank site have been tested and show no contamination; however, the contractor will be responsible for any contamination resulting from failure to verify the tank is empty before removal. A Standard Commonwealth Bid Bond (form CO-10.2) and Contract Security are required regardless of bid amount, and all contractors must be registered vendors in eVA and use the owner's e-Builder web-based project management system for pay applications and invoices.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% Employee-Owned | wileywilson.com
127 Nationwide Drive | Lynchburg, VA 24502 | 434.947.1901
ADDENDUM NO. 2
Replace Oil Burners with Gas Boiler at Davis Hall
Project Code: 260-B5260-046
Southwest Community College / Virginia Community College System
To: Bidders, VCCS, SWCC From: Wiley|Wilson
This Addendum contains 1 pages and listed attachments and modifies the sealed Project Manual and Drawings (bid documents) for the above state project dated February 13 2026, as noted below. Acknowledge receipt of all Addenda in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification.
PRE-BID QUESTIONS RECEIVED AS OF MARCH 18, 2026
Question 1: Who is the existing fuel delivery supplier?
Response: James River Solutions supplies fuel oil and Foster Fuels is the propane vendor for the college.
Question 2: Who is responsible for removal and disposing of old fuel oil tank?
Response: Contractor is responsible. See Sheet Keynote #3 on C-101.
Question 3: Who is responsible for removal of the existing fuel in the fuel oil tank?
Response: Existing fuel oil tank is empty. Contractor is responsible for verifying tank is empty prior to removal of fuel oil tank. See Sheet Keynote #3 on C-101. Contractor to coordinate with owner and gas delivery provider for the extraction of existing propane prior to demolition and removal of existing propane tank. See Sheet Keynote
#1 on C-101.
Question 4: Who is responsible for any contaminated soil from leakage of tank if found?
Response: Soil samples around the tank have been taken and no contamination was found. See keynote #3 on C-101. Contractor must verify tank is empty before removal and will be responsible for any leak/contamination that occurs as a result of failure to verify the tank is empty.
ATTACHMENTS
N/A End of Addendum No. 2
WILEY|WILSON
Tyler Morris, PE Project Manager tdmorris@wileywilson.com 434.455.3692
3/20/2026