Summary

This is a project manual and bidding document for the Sussex County Vocational Technical School District in Georgetown, Delaware, for the construction of a new West Pavilion Field House, Agricultural Building, and Greenhouse at Sussex Technical High School (Project No. 2024150.02). The project is managed as a construction management delivery method with bids solicited for thirteen separate trade contracts: Concrete Work, Masonry Work, Steel Work, Carpentry & General Work, Roofing Work, Hollow Metal/Doors/Hardware, Aluminum Storefront/Glass & Glazing, Drywall/Metal Stud, Painting/Caulking, Mechanical, Electrical, Post Frame Construction, and Greenhouse. A non-mandatory pre-bid meeting is scheduled for July 7, 2026, at 9:00 a.m. at Sussex Technical High School, with sealed bids due August 4, 2026, at 2:00 p.m. at the same location. The Contract Documents include detailed drawings, specifications organized by division, and all associated forms required for submission. The project involves new construction with phased work schedules and construction management oversight by Richard Y. Johnson & Son, Inc., with architectural services provided by Becker Morgan Group, Inc.

Each bid must be accompanied by a bid security deposit equal to ten percent of the bid amount plus all additive alternates, submitted on the prescribed bid form with a completed subcontractor list identifying all second and third-tier contractors by full name and address. Successful bidders must execute performance and payment bonds equal to one hundred percent of the contract price within twenty days of award notification, maintain a mandatory drug testing program compliant with OMB Regulation 4104, comply with Delaware prevailing wage requirements, provide craft training in applicable trades if employing ten or more employees, and ensure non-discrimination in employment practices. The contract award must be made within thirty days of bid opening to the lowest responsive and responsible bidder, with contract execution required within twenty days thereafter. Delaware business licenses must be provided for the successful bidder and all subcontractors before contract execution, and the documents note that construction schedules, allowances, and unit prices are specified in the bid form and project specifications.

View the file

Other files

File Type Posted
SUS26001-STHS_BPC_ad2.pdf PDF
SUS26001-STHS_BPC_ad1.pdf PDF
SUS26001-STHS_BPC_pw.pdf PDF
SUS26001-STHS_BPC_itb.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

SUSSEX TECHNICAL HIGH SCHOOL

WEST PAVILION FIELD HOUSE &

GREENHOUSE

Georgetown, Delaware

DRAFT BIDDING DOCUMENTS

BMG Project #2024150.02

SPECIFICATIONS

June 16, 2026

BECKER MORGAN GROUP, INC.

312 WEST MAIN STREET, SUITE 300

SALISBURY, MARYLAND 21801

NOT FOR BID

DIN

G

STHS WEST PAVILION & GREENHOUSE

BECKER MORGAN GROUP, INC. TITLE PAGE/CONSULTANT DIRECTORY

2024150.02 000101-1

Title Page/Consultants Directory

By Project Contacts Owner’s Representative Sussex County Vocational Technical School District 17137 County Seat Highway Georgetown, Delaware 19947

Architects Becker Morgan Group, Inc. Brad Hastings 312 W Main St#300 Salisbury, Maryland 21801 410-546-9100

Construction Manager Richard Y. Johnson & Son 18404 Johnson Road Dean Johnson PO Box 105 Lincoln, Delaware 19960 302-422-3732

BECKER MORGAN GROUP, INC. TABLE OF CONTENTS

2024150.02 000110-1

SECTION 000110 – TABLE OF CONTENTS

VOLUME I

DIVISION 00 – CONTRACT REQUIREMENTS

INTRODUCTORY INFORMATION

00 01 07 Seals Page 00 01 11 Title Page/Consultant Directory 00 01 10 Table Of Contents 00 01 15 List Of Drawings 00 11 16 Advertisement for Bid

PROCUREMENT INFORMATION

00 21 13 Instructions to Bidders 00 41 26 Bid Forms Including:

Bid Form Sub Listing Non-Collusion Statement Affidavit of Employee Drug Testing Program Affidavit of Contractor Qualifications 004313 State Of Delaware Bid Bond

CONTRACTING INFORMATION

00 52 26 Agreement Including Standard Form Of Agreement Between Owner And Contractor (Aia A132 –

2019) 00 61 13.13 State Of Delaware Performance Bond Form 00 61 13.16 State Of Delaware Payment Bond Form 00 62 76 Monthly Requisition & Continuation Sheet (AIA G732-2019 & G703-2021) 00 63 00 Standard Forms Certificates and Modification Forms 00 72 26 General Conditions of the Contract For Construction (AIA A232-2019) 00 73 00 Supplementary General Conditions A232-2019 Including Attachment “A” Construction Manager General Conditions 00 73 16 Insurance Including Sample Certificate Of Insurance 00 73 46 Delaware Prevailing Wage Rates 00 80 13 General Requirements 00 81 14 Drug Testing Forms 00 93 00 Reference Materials Geotechnical Report (Boring Logs) Payroll Report Form

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 12 00 Multiple Contract Summary 01 12 16 Alteration Project Procedures 01 14 00 Work Restrictions 01 20 00 Price and Payment Procedures 01 21 00 Allowances 01 22 00 Unit Prices 01 23 00 Alternates 01 25 00 Substitution Procedures 01 25 01 Substitution Request Sample Form 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures

NOT FOR BID

2024150.02 000110-2

01 29 73 Schedule Of Values 01 31 00 Project Management and Coordination 01 31 13 Project Coordination 01 32 16 Construction Schedule 01 32 33 Construction Progress Documentation 01 33 00 Submittal Procedures 01 33 01 CADD Release Form 01 33 19 Field Engineering 01 35 00 Safety 01 40 00 Quality Control 01 40 13 Quality Requirements 01 42 00 References 01 42 19 Reference Standards 01 50 00 Temporary Construction Utilities, Facilities & Controls 01 60 00 Materials and Equipment Product Requirements 01 70 00 Contract Closeout 01 73 29 Cutting and Patching 01 74 19 Construction Waste Management 01 75 00 Facility Startup/Commissioning 01 77 00 Closeout Procedures 01 78 36 Warranties 01 80 00 Statement of Special Inspections 01 19 13 General Commissioning Requirements 01 19 14 Plumbing Commissioning Requirements 01 19 15 HVAC Commissioning Requirements

2024150.02 000110-3

VOLUME 2

DIVISION 02 -- EXISTING CONDITIONS

Site Preparation and Earthwork, see Division 31 covered in Bid B

DIVISION 03 -- CONCRETE

030516 - Underslab Vapor Barrier

033000 - Cast-in-Place Concrete

DIVISION 04 -- MASONRY

042000 - Unit Masonry

047200 - Cast Stone Masonry

DIVISION 05 -- METALS

051200 - Structural Steel Framing

052100 - Steel Joist Framing

053100 - Steel Decking

054000 - Cold-Formed Metal Framing

055133 – Metal Ladders

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

061000 - Rough Carpentry

061600 - Sheathing

061753 - Shop-Fabricated Wood Trusses

062000 - Finish Carpentry

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

072100 - Thermal Insulation

072119 - Foamed-In-Place Insulation

074113 - Metal Roof Panels

074213 - Metal Wall Panels

075300 - Elastomeric Membrane Roofing

076200 - Sheet Metal Flashing and Trim

NOT FOR BID

2024150.02 000110-4

077200 - Roof Accessories

078413 - HVAC & Plumbing Penetration Firestopping

079200 - Joint Sealants

DIVISION 08 -- OPENINGS

080671 - Door Hardware Schedule – Greenhouse Pavillion

080671 - Door Hardware Schedule – West Pavillion

081113 - Hollow Metal Doors and Frames

083313 - Coiling Counter Doors

083323 - Overhead Coiling Doors

084313 - Aluminum-Framed Storefronts

DIVISION 09 -- FINISHES

092116 - Gypsum Board Assemblies

096723 – Resinous Flooring

099113 - Exterior Painting

099123 - Interior Painting

099600 – High-Performance Coatings

DIVISION 10 -- SPECIALTIES

101419 - Dimensional Letter Signage

101423 - Panel Signage

102113.19 - Plastic Toilet Compartments

102800 - Toilet, Bath, and Laundry Accessories

104400 - Fire Protection Specialties

105113 - Metal Lockers

107316.13 - Metal Canopies

DIVISION 11 -- EQUIPMENT

DIVISION 12 -- FURNISHINGS

123600 - Countertops

NOT FOR BID

2024150.02 000110-5

DIVISION 13 -- SPECIAL CONSTRUCTION

133413.13 - Greenhouses

133418 - Post Frame Building Systems

DIVISION 14 -- CONVEYING EQUIPMENT

DIVISION 21 -- FIRE SUPPRESSION

DIVISION 22 -- PLUMBING

220500 - Common Work Results for Plumbing

220505 - Plumbing Piping Fittings and Valves

220701 - Plumbing Insulation

224000 - Plumbing Fixtures

224005 - Plumbing Equipment

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

230500 - Common Work Results for HVAC

230505 - HVAC Piping, Fittings, Valves

230548 - Vibration Controls for HVAC and Plumbing Equipment

230593 - Testing Adjusting & Balancing for HVAC & Plumbing

230600 - Heating Ventilating and Air Conditioning Equipment

230701 - HVAC Insulation

230900 - Instrumentation & Controls of HVAC & Plumbing Systems (DDC System)

230923 - Airflow Monitoring Stations

23300 - HVAC Air Distribution

235523 - Gas Fired Radiant Heaters

DIVISION 25 -- INTEGRATED AUTOMATION

DIVISION 26 -- ELECTRICAL

260500 - Common Work Results for Electrical

260519 - Low-Voltage Electrical Power Conductors and Cables

260520 - Electric Heating Cables

260526 - Grounding and Bonding for Electrical Systems

NOT FOR BID

2024150.02 000110-6

260528 -Firestopping for Electrical Systems

260529 - Hangers and Supports for Electrical Systems

260533 - Raceways and Boxes for Electrical Systems

260535 - Raceways and Boxes for Low-Voltage Systems

260543 – Underground Ducts and Raceways for Electrical Systems

260545- Utility Holes

260553 - Identification for Electrical Systems

260573 - Power System Studies

260800 - Commissioning of Electrical Systems

260919 - Enclosed Contactors

260923 - Lighting Control Devices

260943 - Network Lighting Controls

261120 - Utility Incoming Service Provisions

262200 - Low-Voltage Transformers

262416 – Panelboards

262418 – Load Centers

262726 - Wiring Devices

262813 - Fuses

262816 - Enclosed Switches Circuit Breakers

262913 – Motor Controllers

263600 - Transfer Switches

264113 - Lightning Protection for Structures

265100 - Interior Lighting

DIVISION 27 -- COMMUNICATIONS

DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY

280500 - Common Work Results for Electronic Safety and Security

283111 - Digital Addressable Fire AAlarm System

NOT FOR BID

2024150.02 000110-7

DIVISION 31 -- EARTHWORK

DIVISION 32 -- EXTERIOR IMPROVEMENTS

DIVISION 33 -- UTILITIES

DIVISION 34 -- TRANSPORTATION

DIVISION 40 -- PROCESS INTEGRATION

DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT

END TABLE OF CONTENTS

BECKER MORGAN GROUP, INC. DRAWING LIST

2024150.02 000115-1

DRAWING LIST

WEST PAVILION FIELD HOUSE

GENERAL

G001 COVER SHEET

G101-A LIFE SAFETY PLAN AND CODE STUDY

STRUCTURAL

S001-A COVER SHEET

S002-A PROJECT SCHEDULES & GENERAL NOTES

S101-A FOUNDATION PLAN

S102-A ROOF FRAMING PLAN

S501-A FOUNDATION SECTIONS & DETAILS

S511-A FRAMING SECTIONS & DETAILS

ARCHITECTURAL

A001-A CONSTRUCTION TYPES - EXTERIOR WALLS, INTERIOR WALLS, MOUNTING AND

SIGNAGE DETAILS

A101-A FIRST FLOOR PLAN, PLUMBING TYPES

A102-A ROOF PLAN

A201-A EXTERIOR ELEVATIONS, BUILDING SECTIONS, WALL SECTIONS

A601-A DOOR AND FINISH SCHEDULE, DOOR DETAILS

PLUMBING

P101-A FIRST FLOOR PLAN - FIELDHOUSE - PLUMBING

MECHANICAL

M101-A FIRST FLOOR PLAN - FIELDHOUSE - HVAC

MP101-A FIRST FLOOR PLA - FIELDHOUSE - MECHANICAL PIPING

ELECTRICAL

EL101-A FIRST FLOOR PLAN - FIELDHOUSE - LIGHTING

EM101-A FIRST FLOOR PLAN - FIELDHOUSE - MECHANICAL POWER

EP101-A FIRST FLOOR PLAN - FIELDHOUSE - POWER

FA101-A FIRST FLOOR PLAN- FIELDHOUSE-FIRE ALARM-A

GREENHOUSE

GENERAL

G101-B LIFE SAFETY PLAN AND CODE STUDY

STRUCTURAL

S001-B COVER SHEET

S002-B PROJET SCHEDULES & GENERAL NOTES

S101-B FOUNDATION PLAN

S102-B ROOF FRAMING PLAN

S501-B FOUNDATION SECTIONS & DETAILS

ARCHITECTURAL

A001-B CONSTRUCTION TYPES- EXTERIOR WALLS, SLABS, FLOORS, ROOFS, AND SOFFITS

NOT FOR BID

2024150.02 000115-2

A002-B CONSTRUCTION TYPES-INTERIOR WALL TYPES, SIGNAGE, CEILING TYPES

A101-B FLOOR PLAN AND REFLECTED CEILING PLAN

A102-B ROOF PLAN

A201-B SECTIONS AND ELEVATIONS

A301-B WALL SECTIONS

A601-B DOOR AND WINDOW TYPES AND SCHEDULE

MECHANICAL

M101- B FIRST FLOOR PLAN - GREENHOUSE - HVAC

M102-B ROOF PLAN - GREENHOUSE - HVAC

MP101-B FIRST FLOOR PLAN - GREENHOUSE - MECHANICAL PIPING

ELECTRICAL

EL101-B FIRST FLOOR PLAN - GREENHOUSE - LIGHTING

EM101-B FIRST FLOOR PLAN - GREENHOUSE - MECHANICAL POWER

EP101- B FIRST FLOOR PLAN - GREENHOUSE - POWER

FA101-B FIRST FLOOR PLAN - GREENHOUSE- FIRE ALARM

SHARED DETAILS

PLUMBING

P001-C PLUMBING TITLE SHEET

P301-C DETAILS - PLUMBING

P302-C DETAILS - PLUMBING

P303-C DETAILS - PLUMBING

P304-C DETAILS - PLUMBING

P305-C DETAILS - PLUMBING

P501-C SCHEDULES - PLUMBING

MECHANICAL

M301-C DETAILS - HVAC

M302-C DETAILS - HVAC

M303-C DETAILS - HVAC

M304-C DETAILS - HVAC

M401-C CONTROLS - HVAC

M402-C CONTROLS - HVAC

M403-C CONTROLS - HVAC

M404-C CONTROLS - HVAC

M501-C SCHEDULES- HVAC

ELECTRICAL

E001-C LEGEND & ABBREVIATIONS ELECTRICAL

E301-C DETAILS ELECTRICAL

E302-C DETAILS ELECTRICAL

E303-C DETAILS ELECTRICAL

E304-C DETAILS ELECTRICAL

E305-C DETAILS ELECTRICAL

E306-C DETAILS ELECTRICAL

E307-C DETAILS ELECTRICAL

E308-C DETAILS ELECTRICAL

E309-C DETAILS ELECTRICAL

E401-C LIGHTING CONTROL SEQUENCES

E501-C SCHEDULES - ELECTRICAL

E502-C SCHEDULES - ELECTRICAL

E503-C SCHEDULES - ELECTRICAL

E504-C SCHEDULES - ELECTRICAL

NOT FOR BID

2024150.02 000115-3

E505-C SCHEDULES - ELECTRICAL

E601-C SINGLE-LINE DIAGRAMS ELECTRICAL

EP-711-C SITE PLAN ATHLETIC FIELDS POWER BID PACK-C

EP-712-C SITE PLAN PROPOSSED BUILDINGS POWER BID PACK-C

EP-713-C SITE PLAN EXISTING BUILDINGS POWER BID PACK-C

FA401-C LIGHTING CONTROL SEQUENCES

END OF SECTION

NOT FOR BID

BECKER MORGAN GROUP, INC. ADVERTISEMENT FOR BID

2024150.02 001116-1

SECTION 001116 – ADVERTISEMENT FOR BID

Public notice is hereby given that sealed bids for Project No. 2024150.02, will be received by the State of Delaware, Sussex County Vocational Technical School District, at the Existing Sussex Tech High School located at 17137 County Seat Highway, Georgetown Delaware 19947 until 2:00pm local time on August 4, 2026 at which time they will be publicly opened and read aloud in the Library. Bidder bears the risk of late delivery. Any bids received after the stated time will be returned unopened.

Project involves the construction of a new West Pavilion Field House, Ag Building and Greenhouse. This is a construction management project. Bids are to be for the following contracts:

C-1: Concrete Work C-8: Drywall/Metal Stud C-2: Masonry Work C-9: Painting/Caulking C-3: Steel Work C-10: Mechanical C-4: Carpentry & General Work C-11: Electrical C-5: Roofing Work C-12: Post Frame Construction C-6: Furnish Hollow Metal/Doors/Hardware C-13: Greenhouse C-7: Aluminum Storefront/Glass & Glazing

Attention is called to construction schedule as detailed in the Bid Documents.

A NON-MANDATORY Pre-Bid Meeting will be held on July 7, 2026, at 9:00amat the Existing Sussex Tech High School located at 17137 County Seat Highway, Georgetown Delaware 19947 in the Library for the purpose of establishing the listing of subcontractors and to answer questions. ATTENDANCE OF THIS

MEETING IS NOT A PREREQUISITE FOR BIDDING ON THIS CONTRACT.

Sealed bids shall be addressed to Sussex County Vocational Technical School District, Attn: Superintendent Dr. Kevin Carson. The outer envelope should clearly indicate: "Sussex Technical High School Project No.

2024150.02, Company Name, Contract you are bidding, SEALED BID - DO NOT OPEN."

Construction documents will be available for review at the office of Richard Y Johnson & Son, Inc.

Contract documents may be purchased at DiCarlo Printers, located at 2006 Northwood Drive, Salisbury MD, 21801 or RCI Printing and Graphics located at 298 Churchmans Road, New Castle DE, 19720. Electronic documents will be made available on the website of Richard Y. Johnson & Son, Inc.’s www.ryjson.com under plan room. It is the responsibility of each bidder to review and coordinate all project documents. This includes plans, specifications and addendums. All documents will be available on the day of the pre-bid meeting on the website on Richard Y. Johnson & Son, Inc. www.ryjson.com under plan room.

Questions should be directed to the Construction Manager, Richard Y. Johnson & Son, Inc. in writing only.

Email questions too Attn: Jesse Dixon (jdixon@ryjson.com).

A bid security in the amount of 10% of the bid must accompany each bid. Bid Security shall specify the Owner as the obligee. Owner: Sussex County Vocational Technical School District, 17137 County Seat Highway, Georgetown, Delaware 19947

Minority Business Enterprises (MBE), Disadvantaged Business Enterprises (DBE) and Women-Owned Business Enterprises (WBE) will be afforded full opportunity to submit bids on this contract and will not be subject to discrimination on the basis of race, color, national origin or sex in consideration of this award. Each bid must be accompanied by a bid security equivalent to ten percent of the bid amount and all additive alternates. The successful bidder must post a performance bond and payment bond in a sum equal to 100 percent of the contract price upon execution of the contract. The Owner reserves the right to reject any or all bids and to waive any informalities therein. The Owner may extend the time and place for the opening of the bids from that described in the advertisement, with not less than two calendar days notice by certified delivery, facsimile machine or other electronic means to those bidders receiving plans.

NOT FOR BID

BECKER MORGAN GROUP, INC. INSTRUCTIONS TO BIDDERS

2024150.02 002113-1

INSTRUCTIONS TO BIDDERS

TABLE OF ARTICLES

1. DEFINITIONS

2. BIDDER’S REPRESENTATION

3. BIDDING DOCUMENTS

4. BIDDING PROCEDURES

5. CONSIDERATION OF BIDS

6. POST-BID INFORMATION

7. PERFORMANCE BOND AND PAYMENT BOND

8. FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR

2024150.02 002113-2

ARTICLE 1: GENERAL

1.1 DEFINITIONS

1.1.1 Whenever the following terms are used, their intent and meaning shall be interpreted as follows:

1.2 STATE: The State of Delaware.

1.3 AGENCY: Contracting State Agency as noted on cover sheet.

1.4 DESIGNATED OFFICIAL: The agent authorized to act for the Agency.

1.5 BIDDING DOCUMENTS: Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding Requirements consist of the Advertisement for Bid, Invitation to Bid, Instructions to Bidders, Supplementary Instructions to Bidders (if any), General Conditions, Supplementary General Conditions, General Requirements, Special Provisions (if any), the Bid Form (including the Non-collusion Statement), and other sample bidding and contract forms. The proposed Contract Documents consist of the form of Agreement between the Owner and Contractor, as well as the Drawings, Specifications (Project Manual) and all Addenda issued prior to execution of the Contract.

1.6 CONTRACT DOCUMENTS: The Contract Documents consist of the, Instructions to

Bidders, Supplementary Instructions to Bidders (if any), General Conditions, Supplementary General Conditions, General Requirements, Special Provisions (if any), the form of agreement between the Owner and the Contractor, Drawings (if any), Specifications (Project Manual), and all addenda.

1.7 AGREEMENT: The form of the Agreement shall be AIA Document A101, Standard Form of

Agreement between Owner and Contractor where the basis of payment is a STIPULATED SUM. In the case of conflict between the instructions contained therein and the General Requirements herein, these General Requirements shall prevail.

1.8 GENERAL REQUIREMENTS (or CONDITIONS): General Requirements (or conditions) are instructions pertaining to the Bidding Documents and to contracts in general. They contain, in summary, requirements of laws of the State; policies of the Agency and instructions to bidders.

1.9 SPECIAL PROVISIONS: Special Provisions are specific conditions or requirements peculiar to the bidding documents and to the contract under consideration and are supplemental to the General Requirements. Should the Special Provisions conflict with the General Requirements, the Special Provisions shall prevail.

1.10 ADDENDA: Written or graphic instruments issued by the Owner/Architect prior to the execution of the contract which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections.

1.11 BIDDER OR VENDOR: A person or entity who formally submits a Bid for the material or

Work contemplated, acting directly or through a duly authorized representative who meets the requirements set forth in the Bidding Documents.

2024150.02 002113-3

1.12 SUB-BIDDER: A person or entity who submits a Bid to a Bidder for materials or labor, or both for a portion of the Work.

1.13 BID: A complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.

1.14 BASE BID: The sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents as the base, to which Work may be added or from which Work may be deleted for sums stated in Alternate Bids (if any are required to be stated in the bid).

1.15 ALTERNATE BID (or ALTERNATE): An amount stated in the Bid, where applicable, to be added to or deducted from the amount of the Base Bid if the corresponding change in the Work, as described in the Bidding Documents is accepted.

1.16 UNIT PRICE: An amount stated in the Bid, where applicable, as a price per unit of measurement for materials, equipment or services or a portion of the Work as described in the Bidding Documents.

1.17 SURETY: The corporate body which is bound with and for the Contract, or which is liable, and which engages to be responsible for the Contractor's payments of all debts pertaining to and for his acceptable performance of the Work for which he has contracted.

1.18 BIDDER'S DEPOSIT: The security designated in the Bid to be furnished by the Bidder as a guaranty of good faith to enter into a contract with the Agency if the Work to be performed or the material or equipment to be furnished is awarded to him.

1.19 CONTRACT: The written agreement covering the furnishing and delivery of material or work to be performed.

1.20 CONTRACTOR: Any individual, firm or corporation with whom a contract is made by the

Agency.

1.21 SUBCONTRACTOR: An individual, partnership or corporation which has a direct contract with a contractor to furnish labor and materials at the job site, or to perform construction labor and furnish material in connection with such labor at the job site.

1.22 CONTRACT BOND: The approved form of security furnished by the contractor and his surety as a guaranty of good faith on the part of the contractor to execute the work in accordance with the terms of the contract.

ARTICLE 2: BIDDER'S REPRESENTATIONS

2.1 PRE-BID MEETING

2.1.1 A pre-bid meeting for this project will be held at the time and place designated. Attendance at this meeting is a pre-requisite for submitting a Bid, unless this requirement is specifically waived elsewhere in the Bid Documents.

2024150.02 002113-4

2.2 By submitting a Bid, the Bidder represents that:

2.2.1 The Bidder has read and understands the Bidding Documents and that the Bid is made in accordance therewith.

2.2.2 The Bidder has visited the site, become familiar with existing conditions under which the

Work is to be performed, and has correlated the Bidder’s his personal observations with the requirements of the proposed Contract Documents.

2.2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding

Documents without exception.

2.3 JOINT VENTURE REQUIREMENTS

2.3.1 For Public Works Contracts, each Joint Venturer shall be qualified and capable to complete the Work with their own forces.

2.3.2 Included with the Bid submission, and as a requirement to bid, a copy of the executed Joint

Venture Agreement shall be submitted and signed by all Joint Venturers involved.

2.3.3 All required Bid Bonds, Performance Bonds, Material and Labor Payment Bonds must be executed by both Joint Venturers and be placed in both of their names.

2.3.4 All required insurance certificates shall name both Joint Venturers.

2.3.5 Both Joint Venturers shall sign the Bid Form.

2.3.6 Both Joint Venturers shall include their Federal E.I. Number with the Bid.

2.3.7 In the event of a mandatory Pre-bid Meeting, each Joint Venturer shall have a representative in attendance.

2.3.8 Due to exceptional circumstances and for good cause shown, one or more of these provisions may be waived at the discretion of the State.

2.4 ASSIGNMENT OF ANTITRUST CLAIMS

2.4.1 As consideration for the award and execution by the Owner of this contract, the Contractor hereby grants, conveys, sells, assigns and transfers to the State of Delaware all of its right, title and interests in and to all known or unknown causes of action it presently has or may now or hereafter acquire under the antitrust laws of the United States and the State of Delaware, relating to the particular goods or services purchased or acquired by the Owner pursuant to this contract.

ARTICLE 3: BIDDING DOCUMENTS

3.1 COPIES OF BID DOCUMENTS

3.1.1 Bidders may obtain complete sets of the Bidding Documents from the

Architectural/Engineering firm designated in the Advertisement or Invitation to Bid in the number and for the deposit sum, if any, stated therein.

2024150.02 002113-5

3.1.2 Bidders shall use complete sets of Bidding Documents for preparation of Bids. The issuing Agency nor the Architect assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

3.1.3 Any errors, inconsistencies or omissions discovered shall be reported to the Architect immediately.

3.1.4 The Agency and Architect may make copies of the Bidding Documents available on the above terms for the purpose of obtaining Bids on the Work. No license or grant of use is conferred by issuance of copies of the Bidding Documents.

3.2 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS

3.2.1 The Bidder shall carefully study and compare the Bidding Documents with each other, and with other work being bid concurrently or presently under construction to the extent that it relates to the Work for which the Bid is submitted, shall examine the site and local conditions, and shall report any errors, inconsistencies, or ambiguities discovered to the Architect.

3.2.2 Bidders or Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to the Architect at least seven days prior to the date for receipt of Bids. Interpretations, corrections and changes to the Bidding Documents will be made by written Addendum. Interpretations, corrections, or changes to the Bidding Documents made in any other manner shall not be binding.

3.2.3 The apparent silence of the specifications as to any detail, or the apparent omission from it of detailed description concerning any point, shall be regarded as meaning that only the best commercial practice is to prevail and only material and workmanship of the first quality are to be used. Proof of specification compliance will be the responsibility of the Bidder.

3.2.4 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for all permits, labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work.

3.2.5 The Owner will bear the costs for all impact and user fees associated with the project.

3.3 SUBSTITUTIONS

3.3.1 The materials, products and equipment described in the Bidding Documents establish a standard of quality, required function, dimension, and appearance to be met by any proposed substitution. The specification of a particular manufacturer or model number is not intended to be proprietary in any way. Substitutions of products for those named will be considered, providing that the Vendor certifies that the function, quality, and performance characteristics of the material offered is equal or superior to that specified. It shall be the Bidder's responsibility to assure that the proposed substitution will not affect the intent of the design, and to make any installation modifications required to accommodate the substitution.

3.3.2 Requests for substitutions shall be made in writing to the Architect at least ten days prior to the date of the Bid Opening. Such requests shall include a complete description of the proposed substitution, drawings, performance and test data, explanation of required installation modifications due the substitution, and any other information necessary for an evaluation. The burden of proof of the merit of the proposed substitution is upon the

NOT FOR BID

2024150.02 002113-6 proposer. The Architect’s decision of approval or disapproval shall be final. The Architect is to notify Owner prior to any approvals.

3.3.3 If the Architect approves a substitution prior to the receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding.

3.3.4 The Architect shall have no obligation to consider any substitutions after the Contract award.

3.4 ADDENDA

3.4.1 Addenda will be mailed or delivered to all who are known by the Architect to have received a complete set of the Bidding Documents.

3.4.2 Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose.

3.4.3 No Addenda will be issued later than 2 calendar days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which extends the time or changes the location for the opening of bids.

3.4.4 Each bidder shall ascertain prior to submitting his Bid that they have received all Addenda issued, and shall acknowledge their receipt in their Bid in the appropriate space. Not acknowledging an issued Addenda could be grounds for determining a bid to be non-responsive.

ARTICLE 4: BIDDING PROCEDURES

4.1 PREPARATION OF BIDS

4.1.1 Submit the bids on the Bid Forms included with the Bidding Documents.

4.1.2 Submit the original Bid Form for each bid. Bid Forms may be removed from the project manual for this purpose.

4.1.3 Execute all blanks on the Bid Form in a non-erasable medium (typewriter or manually in ink).

4.1.4 Where so indicated by the makeup on the Bid Form, express sums in both words and figures, in case of discrepancy between the two, the written amount shall govern.

4.1.5 Interlineations, alterations or erasures must be initialed by the signer of the Bid.

4.1.6 BID ALL REQUESTED ALTERNATES AND UNIT PRICES, IF ANY. If there is no change in the Base Bid for an Alternate, enter “No Change”. The Contractor is responsible for verifying that they have received all addenda issued during the bidding period. Work required by Addenda shall automatically become part of the Contract.

4.1.7 Make no additional stipulations on the Bid Form and do not qualify the Bid in any other manner.

4.1.8 Each copy of the Bid shall include the legal name of the Bidder and a statement whether the

Bidder is a sole proprietor, a partnership, a corporation, or any legal entity, and each copy shall be signed by the person or persons legally authorized to bind the Bidder to a contract.

A Bid by a corporation shall further give the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current Power of Attorney attached, certifying agent's authority to bind the Bidder.

NOT FOR BID

2024150.02 002113-7

4.1.9 Bidder shall complete the Non-Collusion Statement form included with the Bid Forms and include it with their Bid.

4.1.10 In the construction of all Public Works projects for the State of Delaware or any agency thereof, preference in employment of laborers, workers or mechanics shall be given to bona fide legal citizens of the State who have established citizenship by residence of at least 90 days in the State.

4.1.11 Each bidder shall include a signed Affidavit for the Bidder certifying compliance with OMB

Regulation 4104 - “Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on “Large Public Works Projects.” “Large Public Works” is based upon the current threshold required for bidding Public Works as set by the Purchasing and Contracting Advisory Council.

4.2 BID SECURITY

4.2.1 All bids shall be accompanied by a deposit of either a good and sufficient bond to the agency for the benefit of the agency, with corporate surety authorized to do business in this State, the form of the bond and the surety to be approved by the agency, or a security of the bidder assigned to the agency, for a sum equal to at least 10% of the bid plus all add alternates, or in lieu of the bid bond a security deposit in the form of a certified check, bank treasurer’s check, cashier’s check, money order, or other prior approved secured deposit assigned to the State. The bid bond need not be for a specific sum, but may be stated to be for a sum equal to 10% of the bid plus all add alternates to which it relates and not to exceed a certain stated sum, if said sum is equal to at least 10% of the bid. The Bid Bond form used shall be the standard OMB form (attached).

4.2.2 The Agency has the right to retain the bid security of Bidders to whom an award is being considered until either a formal contract has been executed and bonds have been furnished or the specified time has elapsed so the Bids may be withdrawn or all Bids have been rejected.

4.2.3 In the event of any successful Bidder refusing or neglecting to execute a formal contract and bond within 20 days of the awarding of the contract, the bid bond or security deposited by the successful bidder shall be forfeited.

4.3 SUBCONTRACTOR LIST

4.3.1 In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, each Bidder shall submit with their Bid a completed List of Sub-Contractors included with the Bid Form. NAME ONLY ONE SUBCONTRACTOR FOR EACH TRADE. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the Bidder will be using to perform the work and provide material for that subcontractor category. Should the Bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the Bidder shall list that third-tier contractor’s full name and address (City & State). If the Bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the Bidder intends to perform the work themselves, the Bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address

NOT FOR BID

2024150.02 002113-8

(City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.

4.3.2 It is the responsibility of the Contractor to ensure that their Subcontractors are in compliance with the provisions of this law. Also, if a Contractor elects to list themselves as a Subcontractor for any category, they must specifically name themselves on the Bid Form and be able to document their capability to act as Subcontractor in that category in accordance with this law.

4.4 AFFIDAVIT OF CONTRACTOR QUALIFICATIONS

4.4.1 In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, each Bidder shall submit with their Bid the Affidavit of Contractor Qualifications certifying that the Bidder will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term. After a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

4.5 AFFIDAVIT OF CRAFT TRAINING COMPLIANCE

4.5.1 In accordance with Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code, contractors and subcontractors must provide craft training for journeyman and apprentice levels if all of the following apply:

A. A project meets the prevailing wage requirement under Title 29, Chapter 69, Section 6960 of the Delaware Code.

B. The contractor employs 10 or more total employees.

C. The project is not a federal highway project

Failure to provide required craft training on the project may subject the successful contractor and/or subcontractor(s) to penalties as outlined in Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code.

Bidders shall submit the Affidavit of Craft Training Compliance prior to contract execution.

4.6 EQUALITY OF EMPLOYMENT OPPORTUNITY ON PUBLIC WORKS

4.6.1 During the performance of this contract, the contractor agrees as follows:

A. The Contractor will not discriminate against any employee or applicant for employment because of race, creed, sex, color, sexual orientation, gender identity or national origin. The Contractor will take affirmative action to ensure the applicants are employed, and that employees are treated during employment, without regard to their race, creed, sex, color, sexual orientation, gender identity or national origin.

NOT FOR BID

2024150.02 002113-9

Such action shall include, but not be limited to, the following: Employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places available to employees and applicants for employment notices to be provided by the contracting agency setting forth this nondiscrimination clause.

B. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed, sex, color, sexual orientation, gender identity or national origin."

4.7 PREVAILING WAGE REQUIREMENT

4.7.1 Wage Provisions: For renovation and new construction projects whose costs exceed the thresholds contained in Delaware Code, Title 29, Section 6960, the minimum wage rates for various classes of laborers and mechanics shall be as determined by the Department of Labor, Division of Industrial Affairs of the State of Delaware.

4.7.2 The employer shall pay all mechanics and labors employed directly upon the site of work, unconditionally and not less often than once a week and without subsequent deduction or rebate on any account, the full amounts accrued at time of payment, computed at wage rates not less than those stated in the specifications, regardless of any contractual relationship which may be alleged to exist between the employer and such laborers and mechanics.

4.7.3 The scale of the wages to be paid shall be posted by the employer in a prominent and easily accessible place at the site of the work.

4.7.4 Every contract based upon these specifications shall contain a stipulation that sworn payroll information, as required by the Department of Labor, be furnished weekly. The Department of Labor shall keep and maintain the sworn payroll information for a period of 6 months from the last day of the work week covered by the payroll.

4.8 SUBMISSION OF BIDS

4.8.1 Enclose the Bid, the Bid Security, and any other documents required to be submitted with the

Bid in a sealed opaque envelope. Address the envelope to the party receiving the Bids.

Identify with the project name, project number, and the Bidder's name and address. If the Bid is sent by mail, enclose the sealed envelope in a separate mailing envelope with the notation "BID ENCLOSED" on the face thereof. The State is not responsible for the opening of bids prior to bid opening date and time that are not properly marked.

4.8.2 Deposit Bids at the designated location prior to the time and date for receipt of bids indicated in the Advertisement for Bids. Bids received after the time and date for receipt of bids will be marked “LATE BID” and returned.

4.8.3 Bidder assumes full responsibility for timely delivery at location designated for receipt of bids.

4.8.4 Oral, telephonic or telegraphic bids are invalid and will not receive consideration.

2024150.02 002113-10

4.8.5 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids, provided that they are then fully in compliance with these Instructions to Bidders.

4.9 MODIFICATION OR WITHDRAW OF BIDS

4.9.1 Prior to the closing date for receipt of Bids, a Bidder may withdraw a Bid by personal request and by showing proper identification to the Architect. A request for withdraw by letter or fax, if the Architect is notified in writing prior to receipt of fax, is acceptable. A fax directing a modification in the bid price will render the Bid informal, causing it to be ineligible for consideration of award. Telephone directives for modification of the bid price shall not be permitted and will have no bearing on the submitted proposal in any manner.

4.9.2 Bidders submitting Bids that are late shall be notified as soon as practicable and the bid shall be returned.

4.9.3 A Bid may not be modified, withdrawn or canceled by the Bidder during a thirty (30) day period following the time and date designated for the receipt and opening of Bids, and Bidder so agrees in submitting their Bid. Bids shall be binding for 30 days after the date of the Bid opening.

ARTICLE 5: CONSIDERATION OF BIDS

5.1 OPENING/REJECTION OF BIDS

5.1.1 Unless otherwise stated, Bids received on time will be publicly opened and will be read aloud. An abstract of the Bids will be made available to Bidders.

5.1.2 The Agency shall have the right to reject any and all Bids. A Bid not accompanied by a required Bid Security or by other data required by the Bidding Documents, or a Bid which is in any way incomplete or irregular is subject to rejection.

5.1.3 If the Bids are rejected, it will be done within thirty (30) calendar day of the Bid opening.

5.2 COMPARISON OF BIDS

5.2.1 After the Bids have been opened and read, the bid prices will be compared and the result of such comparisons will be made available to the public. Comparisons of the Bids may be based on the Base Bid plus desired Alternates. The Agency shall have the right to accept Alternates in any order or combination.

5.2.2 The Agency reserves the right to waive technicalities, to reject any or all Bids, or any portion thereof, to advertise for new Bids, to proceed to do the Work otherwise, or to abandon the Work, if in the judgment of the Agency or its agent(s), it is in the best interest of the State.

5.2.3 An increase or decrease in the quantity for any item is not sufficient grounds for an increase or decrease in the Unit Price.

5.2.4 The prices quoted are to be those for which the material will be furnished F.O.B. Job Site and include all charges that may be imposed during the period of the Contract.

5.2.5 No qualifying letter or statements in or attached to the Bid, or separate discounts will be considered in determining the low Bid except as may be otherwise herein noted. Cash or separate discounts should be computed and incorporated into Unit Bid Price(s).

2024150.02 002113-11

5.3 DISQUALIFICATION OF BIDDERS

5.3.1 An agency shall determine that each Bidder on any Public Works Contract is responsible before awarding the Contract. Factors to be considered in determining the responsibility of a Bidder include:

A. The Bidder’s financial, physical, personnel or other resources including

Subcontracts;

B. The Bidder’s record of performance on past public or private construction projects, including, but not limited to, defaults and/or final adjudication or admission of violations of the Prevailing Wage Laws in Delaware or any other state;

C. The Bidder’s written safety plan;

D. Whether the Bidder is qualified legally to contract with the State;

E. Whether the Bidder supplied all necessary information concerning its responsibility; and, F. Any other specific criteria for a particular procurement, which an agency may establish; provided however, that, the criteria be set forth in the Invitation to Bid and is otherwise in conformity with State and/or Federal law.

5.3.2 If an agency determines that a Bidder is nonresponsive and/or nonresponsible, the determination shall be in writing and set forth the basis for the determination. A copy of the determination shall be sent to the affected Bidder within five (5) working days of said determination.

5.3.3 In addition, any one or more of the following causes may be considered as sufficient for the disqualification of a Bidder and the rejection of their Bid or Bids.

5.3.3.1 More than one Bid for the same Contract from an individual, firm or corporation under the same or different names.

5.3.3.2 Evidence of collusion among Bidders.

5.3.3.3 Unsatisfactory performance record as evidenced by past experience.

5.3.3.4 If the Unit Prices are obviously unbalanced either in excess or below reasonable cost analysis values.

5.3.3.5 If there are any unauthorized additions, interlineation, conditional or alternate bids or irregularities of any kind which may tend to make the Bid incomplete, indefinite or ambiguous as to its meaning.

5.3.3.6 If the Bid is not accompanied by the required Bid Security and other data required by the

Bidding Documents.

5.3.3.7 If any exceptions or qualifications of the Bid are noted on the Bid Form.

5.4 ACCEPTANCE OF BID AND AWARD OF CONTRACT

2024150.02 002113-12

5.4.1 A formal Contract shall be executed with the successful Bidder within twenty (20) calendar days after the award of the Contract.

5.4.2 Per Section 6962(d)(13) a., Title 29, Delaware Code, “The contracting agency shall award any public works contract within thirty (30) days of the bid opening to the lowest responsive and responsible Bidder, unless the Agency elects to award on the basis of best value, in which case the election to award on the basis of best value shall be stated in the Invitation To Bid.”

5.4.3 Each Bid on any Public Works Contract must be deemed responsive by the Agency to be considered for award. A responsive Bid shall conform in all material respects to the requirements and criteria set forth in the Contract Documents and specifications.

5.4.4 The Agency shall have the right to accept Alternates in any order or combination, and to determine the low Bidder on the basis of the sum of the Base Bid, plus accepted Alternates.

5.4.5 The successful Bidder shall execute a formal contract, submit the required Insurance

Certificate, and furnish good and sufficient bonds, unless specifically waived in the General Requirements, in accordance with the General Requirement, within twenty (20) days of official notice of contract award. The successful Bidder shall provide, at least two business days prior to contract execution, copies of the Employee Drug Testing Program for the Bidder and all listed Subcontractors. Bonds shall be for the benefit of the Agency with surety in the amount of 100% of the total contract award. Said Bonds shall be conditioned upon the faithful performance of the contract. Bonds shall remain in affect for period of one year after the date of substantial completion.

5.4.6 If the successful Bidder fails to execute the required Contract, Bond and all required information, as aforesaid, within twenty (20) calendar days after the date of official Notice of the Award of the Contract, their Bid guaranty shall immediately be taken and become the property of the State for the benefit of the Agency as liquidated damages, and not as a forfeiture or as a penalty. Award will then be made to the next lowest qualified Bidder of the Work or readvertised, as the Agency may decide.

5.4.7 Each bidder shall supply with its bid its taxpayer identification number (i.e., federal employer identification number or social security number) and should the vendor be awarded a contract, such vendor shall provide to the agency the taxpayer identification license numbers of such subcontractors. Such numbers shall be provided on the later of the date on which such subcontractor is required to be identified or the time the contract is executed.

The successful Bidder shall provide to the agency to which it is contracting, within 30 days of entering into such public works contract, copies of all Delaware Business licenses of subcontractors and/or independent contractors that will perform work for such public works contract. However, if a subcontractor or independent contractor is hired or contracted more than 20 days after the Bidder entered the public works contract the Delaware Business license of such subcontractor or independent contractor shall be provided to the agency within 10 days of being contracted or hired.

5.4.8 The Bid Security shall be returned to the successful Bidder upon the execution of the formal contract. The Bid Securities of unsuccessful bidders shall be returned within thirty (30) calendar days after the opening of the Bids.

2024150.02 002113-13

ARTICLE 6: POST-BID INFORMATION

6.1 CONTRACTOR’S QUALIFICATION STATEMENT

6.1.1 Bidders to whom an award of a Contract is under consideration shall, if requested by the

Agency, submit a properly executed AIA Document A305, Contractor’s Qualification Statement, unless such a statement has been previously required and submitted.

6.2 BUSINESS DESIGNATION FORM

6.2.1 Successful bidder shall be required to accurately complete an Office of Management and

Budget Business Designation Form for Subcontractors.

6.3 Bidders to whom an award of a Contract has been made must produce their Delaware

Business License before the Contract can be executed.

ARTICLE 7: PERFORMANCE BOND AND PAYMENT BOND

7.1 BOND REQUIREMENTS

7.1.1 The cost of furnishing the required Bonds, that are stipulated in the Bidding Documents, shall be included in the Bid.

7.1.2 If the Bidder is required by the Agency to secure a bond from other than the Bidder’s usual sources, changes in cost will be adjusted as provide in the Contract Documents.

7.1.3 The Performance and Payment Bond forms used shall be the standard OMB forms

(attached).

7.2 TIME OF DELIVERY AND FORM OF BONDS

7.2.1 The bonds shall be dated on or after the date of the Contract.

7.2.2 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix a certified and current copy of the power of attorney.

ARTICLE 8: FORM OF AGREEMENT BETWEEN AGENCY AND CONTRACTOR

8.1 Unless otherwise required in the Bidding Documents, the Agreement for the Work will be written on AIA Document A101, Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment is a Stipulated Sum.

END OF INSTRUCTIONS TO BIDDERS

2024150.02 002113-14

BECKER MORGAN GROUP, INC. BID FORM

2024150.02 004126-1

Sussex County Vocational Technical School District STHS West Pavilion & Greenhouse

17137 County Seat Highway, Georgetown Delaware 19947 Project No. 2024150.02

BID FORM

For Bids Due: August 4, 2026 To: Sussex Technical School District Attn: Superintendent Dr. Kevin Carson Contracts Clearly Mark Contract you are bidding (Only 1 contract per bid form) For Bid Package C: GREENHOUSE

___ Contract #1 Concrete Work ___ Contract #2 Masonry Work ___ Contract #3 Steel Work ___ Contract #4 Carpentry & General Work ___ Contract #5 Roofing Work ____Contract #6 Furnish Hollow Metal/Doors/Hardware ___ Contract #7 Aluminum Storefront/Windows/ Glass and Glazing ___ Contract #8 Drywall/Metal Stud ___ Contract #9 Painting/Caulking ___ Contract #10 Mechanical ___ Contract #11 Electrical ___ Contract #12 Post Frame Construction ___ Contract #13 Greenhouse

Name of Bidder:

Delaware Business License No.: Taxpayer ID No.:

(A copy of Bidder’s Delaware Business License must be attached to this form.)

(Other License Nos.):

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:

2024150.02 004126-2

17137 County Seat Highway,…