Supplemental Price Breakdown by Division Sheet.docx

DOCX document 22 KB Posted

Attached to
J056--ACC Pharmacy Preparation and Demolition Project # 459-26-003
Solicitation number
36C26126R0011
Issued by

About this file

This is a Supplemental Price Breakdown by Division Sheet template for Solicitation 36C26126R0011, a Department of Veterans Affairs Veterans Health Administration project (459-26-003) for pharmacy flooring replacement including demolition and replacement work. The document is designed to collect detailed divisional cost breakouts from contractors bidding on the project.

The template requires contractors to provide itemized pricing across 27 MasterFormat divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Contractors must complete line items for applicable divisions, calculate a subtotal, and then add costs for Other, Bonds and Insurance, Overhead, and Profit to arrive at a total contract price. The form requires signature and authorization from a representative with identification of their title and date. This document is explicitly noted as being for price analysis purposes only.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0011 459-26-003

SOLICITATION: 36C26126R0011 PROJECT: 459-26-003

Replace Pharmacy Flooring including demo and replacement

PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 00-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$

06000

DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL

__________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)