Supplemental Price Breakdown by Division Sheet.docx

DOCX document 22 KB Posted

Attached to
36C26126R0007 Replace B530 Gymnasium Floor Solicitation
Solicitation number
36C26126R0007
Issued by

About this file

The document is a Supplemental Price Breakdown by Division Sheet for Solicitation Number 36C26126R0007, which involves replacing the gymnasium flooring in Building 530 for the Department of Veterans Affairs Veterans Health Administration. The breakdown provides a comprehensive template for contractors to detail project costs across 35 different construction divisions, including special sections, general requirements, existing conditions, concrete, masonry, electrical, plumbing, and other specialized areas. The document requires vendors to provide total costs for each division, followed by subtotals for additional expenses such as bonds, insurance, overhead, and profit, enabling a detailed financial analysis of the proposed construction project.

View the file

Other files

File Type Posted
36C26126R0007 0001.pdf PDF
REQUEST FOR INFORMATION FORM.docx DOCX document
9 - Plumbing.pdf PDF
8 - Mechanical.pdf PDF
2 - Civil.pdf PDF
4 - Structural.pdf PDF
16 - Existing Elkay two level.pdf PDF
7 - Equipment.pdf PDF
15 - Existing Gymnasium Floor Detail.pdf PDF
12 - 2 - Electrical.pdf PDF
14 - Bleachers.pdf PDF
640-26-112 SPECS.pdf PDF
5 - Architectural.pdf PDF
13 - Fire Alarm.pdf PDF
1 - General.pdf PDF
36C26126R0007 Replace Gymnasium Flooring.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0007 640-26-112

SOLICITATION: 36C26126R0007 PROJECT: 640-26-112

Replace Gymnasium Flooring in Building 530

PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 00-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$

06000

DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL

__________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .