Supplemental Cottonwood Campground Bridge Repairs Work Data Sheet.docx

DOCX document 14 KB Posted

Attached to
COTTONWOOD BRIDGE SITE 1 & 3 REPAIRS
Solicitation number
140L6221Q0019
Issued by

View the file

Other files

File Type Posted
FY15 CottonwoodCampgroundTrailBridgeSite3 InspRpt_0002.pdf PDF
Sol_140L6221Q0019_Amd_0002.pdf PDF
FY15 CottonwoodCampgroundTrailBridgeSite1 InspRpt_0002.pdf PDF
Sol_140L6221Q0019_Amd_0001.pdf PDF
061519 Timber Decking.DOC DOC document
01009 General Information and Requirements.docx DOCX document
313700 RipRap.doc DOC document
Bid Schedule Cottonwood Bridge Repairs.xlsx XLSX spreadsheet
099313 Exterior Staining.doc DOC document
Final Cottonwood Bridges Plans.pdf PDF
Sol_140L6221Q0019.pdf PDF
01505 Mobilization.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL WORK DATA SHEET

A. Site 1 Bridge:

Replace the railing and posts and add a center post to the railing on both sides of the bridge to provide greater strength and safety. Level the concrete bearing seat at Abutment 2 so that the sill beam is supported for its entire length. Stain the bridge. Add a center post to the railing on both sides Install additional rip rap around the base of Abutment 1 to prevent future erosion. Fill in voids in both abutments using a not shrink grout to reduce water damage.

B. Site 3 Bridge:

Replace the timber deck and tighten the railing so it is not loose. Clean the concrete bearing seats before replacing both existing 8-0 inch round timber sill beams with new 12 inch by 12 inch treated timber sill beams anchored into the concrete abutments. Stain the bridge. Remove the willows and debris immediately upstream of the bridge that are partially blocking flow during high flows. Fill voids in both abutments using non shrink grout to reduce water damage.