01505 Mobilization.docx
DOCX document 21 KB Posted
- Attached to
- COTTONWOOD BRIDGE SITE 1 & 3 REPAIRS
- Solicitation number
- 140L6221Q0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY15 CottonwoodCampgroundTrailBridgeSite3 InspRpt_0002.pdf | ||
| Sol_140L6221Q0019_Amd_0002.pdf | ||
| FY15 CottonwoodCampgroundTrailBridgeSite1 InspRpt_0002.pdf | ||
| Sol_140L6221Q0019_Amd_0001.pdf | ||
| Supplemental Cottonwood Campground Bridge Repairs Work Data Sheet.docx | DOCX document | |
| 061519 Timber Decking.DOC | DOC document | |
| 01009 General Information and Requirements.docx | DOCX document | |
| 313700 RipRap.doc | DOC document | |
| Bid Schedule Cottonwood Bridge Repairs.xlsx | XLSX spreadsheet | |
| 099313 Exterior Staining.doc | DOC document | |
| Final Cottonwood Bridges Plans.pdf | ||
| Sol_140L6221Q0019.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DIVISION 1 | SECTION 01505 |
| GENERAL REQUIREMENTS | MOBILIZATION/DEMOBILIZATION |
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.2.1 BASIS OF PAYMENT:
A. Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
01505 (01) Lump Sum
END OF SECTION
LFO BLM Cottonwood Foot Bridges Repair Project 01505 -
MOBILIZATION