SUMMARY OF ASBESTOS ABATEMENT AT VERA WILSIE ELEMENTARY SCHOOL_2-20-18 (1).pdf
PDF 62 KB Posted
- Attached to
- Abatement Bid Package #2
- Solicitation number
- RFP-NEWS-180000001817-3
- Issued by
- Oceana County, Michigan
About this file
This is a bid specification document for an asbestos abatement project at Newaygo Public Schools in Michigan, specifically at the High School and Vera Wilsie Elementary School. The project requires contractors to remove various asbestos-containing materials as part of 2018 building renovations. Bids are due April 4th, 2018 at 2:00 PM at the Christman Job Trailer located at 29 E. Post Street in Newaygo. A mandatory pre-bid conference is scheduled for March 27th, 2018 at 4:00 PM at Vera Wilsie Elementary School's Main Office. The scope includes removing approximately 24,000 SF of floor tile mastic, window glazing, vent grate caulking, 130 pipe fitting and elbow insulations, and 10 fire doors at Vera Wilsie Elementary School, plus 1,500 SF of exterior transite soffit at the High School.
The document requires contractors to conduct a site visit to verify all conditions and material quantities before submitting proposals, with no allowances to be made for errors or misunderstandings. The materials are clearly itemized with specific HSA numbers, descriptions, asbestos confirmation, locations, and quantities for both facilities. No pricing terms, set-asides, funding information, or contract term details are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asbestos Removal Specs_Vera Wilsie_2-20-18 (1).pdf | ||
| Addendum 2 Write Up.pdf | ||
| Invitation to Bid -Abestos.pdf | ||
| Addendum 1 Write Up (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: High School & Vera Wilsie Elementary School - Asbestos Abatement
OWNER: Newaygo Public Schools 360 South Mill Street
Newaygo, MI 49337
BID DATE: April 4th, 2018
BID TIME: 2:00 PM - To be opened in Christman Job Trailer
BID LOCATION: Newaygo Public Schools Christman Job Trailer – Velma Matson Project
29 E. Post Street Newaygo, MI 49337
PREBID WALKTHROUGH
A mandatory prebid conference will start at 4:00 PM on March 27th, 2018 at Vera Wilsie Elementary School.
Meeting will begin at Main Office.
INSPECTION OF PREMISES
The Contractor must visit the site to satisfy themselves of all conditions and material quantities before submittal of their proposal. No allowance shall subsequently be made on behalf of Contractor for reason of error or misunderstanding.
SUMMARY OF 2018 ASBESTOS ABATEMENT AT THE HIGH SCHOOL & VERA WILSIE ELEMENTARY
SCHOOL
The asbestos-containing materials to be removed at Vera Wilsie Elementary School as part of the 2018 building renovations include, but are not limited to the following:
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS? LOCATION / QUANTITY
VW-1 12”x12” floor tile w/mastic Tile- No
Mastic- Yes Classrooms, kitchen area and office areas (24,000 SF)
VW-2 Window glazing Yes All exterior windows in older building (<200 Cubic Feet)
VW-5 Vent grate caulking Yes Exterior vents (<100 Cubic Feet)
VW-6 Pipe insulation Yes Pipe elbows and fittings (130 Fitting and Elbows)
VW-7 Fire Doors Yes All tagged fire doors (10 Doors)
SF – Square Feet; LF – Lineal Feet
The asbestos-containing materials to be removed at the High School as part of the 2018 building renovations include, but are not limited to the following:
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS? LOCATION / QUANTITY
NHS-15 Exterior transite soffit Yes Exterior soffit / 1,500 SF
SF – Square Feet; LF – Lineal Feet
| HSA Material Description |
| ASbestos? |
| Location / Quantity |