This is an Addendum No. 1 issued by The Christman Company for Newaygo Public Schools Abatement Bid Package #2 (Project No. 214855). The addendum modifies the scope of work for the abatement project at Vera Wilsie Elementary School in Newaygo, Michigan. The addendum includes three required documents: Iran Sanctions form, Familial Relationship Statement, and prevailing wage documents. Bids are due Wednesday, April 4, 2018 at 2:00 PM. The architect is Tower Pinkster.

The addendum contains extensive prevailing wage rate documentation, detailing the required wages and benefits for various construction trades in Michigan, including asbestos/lead abatement workers, carpenters, laborers, operating engineers and other relevant classifications. The documentation includes detailed breakdowns of straight time, overtime, and double time rates, along with apprentice wage scales. The Iran Economic Sanctions Act Certificate requires bidders to certify they are not an Iran-linked business as defined by Michigan Public Act 517 of 2012.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A d d e n d u m N o . 1

The Christman Company 634 Front Avenue NW, Suite 500 Grand Rapids, MI 49504-5355 Phone 616-454-4454 Fax 616-454-1795

Project Name: Newaygo Public Schools – Abatement Bid Package #2

Project No.: 214855

Architect: Tower Pinkster

Date: March 22, 2018

Bid Package No.: Two(2)

Bid Due Date: Wednesday, April 4; 2:00 PM

This Addendum is issued to inform the bidders of modifications in the scope of work being bid for this project.

A. Documents included in this Addendum:

Iran Sanctions form Familial Relationship Statement Prevailing wage documents

B. Bids are due on the following date:

Wednesday, April 4, 2018; 2:00 PM for this bid package.

Acknowledge receipt of this Addendum on the Bid Proposal Form.

The applicable provisions of the Contract Documents shall govern all work included herein unless specifically noted otherwise.

END OF ADDENDUM NO. 1

IRAN ECONOMIC SANCTIONS ACT CERTIFICATE

ln accordance with the lran Economic Sanctions Act, Michigan 201 2 PA 517, effective April 1 ,2013, (MCL 129.311, et seq.), (the "Act"), the undersigned certifies in support of its bid or proposal that it is not an lran linked business as such is defined in the Act.

Contractor

By

Dated

Name:

Title

Act No. 517 Public Acts of 2012

Approved by the Governsr Ðecernber 28,2012

Filed r¡vith the Secretary of State December 28,2012

FFFFCTIVE ÐATE: April !,2013 sTnre oF ît$cHtGARl S6TH L=GI8LAruBE

REGULAR SESSION AF 2OI2

lnt¡oduced by Srnataro l{ahn,.Mrrlean, Br.rnderrburg, .ånderron, G.rcen and Booher

HNROÏ,LHI] SENAÏH BTLL No. Lû24 -åN Á.CT to ¡l"ohibir ferl*tlr¡a rçhr¡ have ce¡'{ain er¡u¡ronric re!:rLicnuhi¡rs rvith tn¡n florÐ submifting trid* r¡n reqnests f*r lrropusxls with thit rtate, politier* suh<livisions of thi* st*te, sììd othe¡ trruhlie entífÍes; tc rue$¡irc bidderç for *ertain public cont.racLs to s¡¡bmit celtiñcatinn *f eïìgihilit¡ r¡'igh ùhe bid¡ tn :requi:re æprn:is; aud to pmr'ìde fsr s¡tnctio¡x f,or fulse rerdlficasion.

Tfu Prxry[e ø.¡f tJic .5taf* o.f,,$ficlrignnr. cnøcl!' iiicc. L Thix *ct sJrsll he kr¡nw¡ aud mqv be cited as Èhe "Irau ec$nonic *an*tions act""

Se*. fl. Å*r r¡¿edl in this $e.tì

{a} "Ë¿*rÉ'-v seetsr oË'[ran" nggas netír'itie,g No dev+lop p+tlnleul¡ or nstulrl gàr ]EB{r!}rrRB or Ru*Tear prlwer in [¡*n.

(Ïr) ¡tfm'est*rclrl" meÀr¡s Ì cr ¡norre of rthc fnlln:*.ing:

(¡) A mlundtnretrt of c*bldbutir¡n rrf frtr¡dt¡. or ¡:ro¡:erty.

tid) ,{, }q*n qr othër ëxten¡i$n of crcdit.

{.djã) lfte entrry ìntc or r'Ènc¡r.al nf a runtr.act for gaads or. servjces.

fcl "Int'eptftefi[ *(rtiyit].' me$nÈ I ür. hr{rïë uf t,he f*Iluwillg:

{¡ll .¿l }ærson t:h+ hap *¡ intestruç¡lÈ qf $å{i,{lf{1.üf}fl.tïl çr m*¡e in th* energy xqetÕ¡: of Ira¡.

{ii} -4. frnand.al j¡ctitution that estsndx ,l¿ü,{X}ú,{tr}.0ü nr ÐraþE in credit to anothe¡ persor, fur {5 dayr nr mane, if that peÏstr* rtrilÌ r¡se tlre c¡"edìt fr¡¿'inr'e*l;tter* ili l.lìe fi¡*ÊråïtJ -úèct'É¡ ûf hwr.

{tì} "I¡tr¡" TrTsë¡:rñ $ry nger¡e5 0r'inrtnrmeltsliiy of lran,

(e) "Iurn linked businesê" mrätr¡Ë cith.r of the followinç til A pemr:u izngagtng in invÈstra€tlt *rtir"it:ies in the elergy.çec:t¿¡r" of lrun, íncluding lt Fei'*ttn thut ¡rr*vitles eil ar )iquefierl nat¡usl gax tanker* or ¡rrrxlur:ft u¡cd tq +onsirucl r)¡ì rilsir¡t*i¡r ¡:ipçlines u¡ccl ln tmlrr¡rol't aíl *r liquefi+d nxfu¡'al g'ax f*r: the enelgy seetor of h':r¡r.

l.fil  lirruneiaå fn¡;fitulisn thxt extends rreclit ùo ¿nothe¡ Feni{rrr, if t}r*t perc*:n u*l r¡xe fhr crrrlíl to eng"*ge in in*estRrent sctivitÍe,3 iu lhe enelg'' *ee{ür of lrrn.

{fl'?g:xon'o mr..ånh rnl of the lhTlorinç {i} ¡ln intììvidual, r:r:qrortitirrrr, cumpitn¡'* limìted li**ilit.v rorn¡xtng liu.tines-{ aÈËt¡(ii*tion, ¡iagtnerstrip, s,ecieí1', t.t"t¡¡itr rÈ.

ury ot-ït-r ü û¡r gor'er, nmsnlul eu t jtl., trg*niørrti on, {¡r gr:r.r$p, {ii} -Any ¡gcvenvnental entity cl inp-tlr¡ment'{1it1' of a grvrrr:rnent, inchding a n¡uiûilaterrd devcfupnrent. ingÉitution, ¡¡¡+ ¿lefilred in s¿etit¡n tTûl{ei(,3} i}f l.h€ iitternuÌjünsl lìnantiat instit¡¡tiun¡il ar:¿, 29 l-lfil,- 9{?ìltd{?'.).

(tdd) .A,ny Êt¡$eûsfflrr eubunit, ¡rarcnt cont¡:*ny, rx *thsidi*r3 of, or company r¡nder common onrrerxhiÞ or contrril with, any entity dprcribed in aubprua¡¡r'aÞh ii) or {id}.

(gl "P*blic e.ntity" rneans thi^r staÉe +r an ¡rIie$Ê¡r or *uthority of this state. çchool distriÈt, community college distrirt, intemlcdiete xchool tlisùri*t, citl', vìllage, townrhip, county, public nuthorfty, or putrlie airport rnthorit¡'.

Sec. å. (11 Beginning April l, 1t13, an lran linked husìnscs k nat eligihle to submit, a bid on å requ€ãt for prapocal n'ilh s þulìlie sntitl'.

{2) Be¡trlning .{'pril l, 2ú1;}, ¿ public *ntity shall mquire { pürson that subrüiLs a bid on e r€quest for propo*el u'ith the public entity tn cer{iff that. it is not an ffan linked businen*.

Sec, {. If a public entity d¿t¿rrnines. using credihh infcrnration av.sitra}rle to the publiq {}at a person h*¡ rubmitted a f¿rl¡e te¡tificaüon under sertinn 3lÊ!, ttre public entity shall provide the persan nith ç'ritten notice of ite deternrination snd rf th+ int¿nt. nôl t¿ enlcrr inlo r-rr reneu. * conlr*c4 wilh the ÞcÌìÉûü" ?he nrrtica *hsll ínchnle information on how ts conts*t the dstcnnÍnation and spe*i$' È}at the psrËún mey beeonre olÍgiblø Jnr a futu¡e contrâet rritl¡ the public entity if the pereon cea"ses tbe actiyitie* tJral eause it to he au Irun linked bueine*n, Tlre perxon ¡rhall h¡ve gû d4vx following re*eipf of the ¡¡rtice t¡l respond in wriling ånd to dÈmûnstrat¿ that 0ha det$rnìnstion rf false <aÉifiestion ns¡ mede in enr¡r: If t p{ri:8011 does not lnqke t}s-t doruonstretion n¡ithin Sú elays *fter reeeipt of the notice, tlre putrlic entit¡' nrey fenuinate any exisùing cnntlact and shall reporf the nåme nf the p'e.r.ran to the atloirrey general together n ith information sulll¡o¡ting the tle(crmination.

Sec, 5. The attoirre¡ general may h'ring * cil'i¡ actioü againxt. an¡l percrn rreported under section 4. If a civil action rÕËr¡lüs in t lînding that thç perxon submítlecl * falxe *fitifIcå¿iün, thr ¡:erson is r*x¡xnnihle for * rir.it ¡xnålt¡r rf not nrqre tlrar f¿50,ú{X}.0{l or È Èirnes thc a¡ns¡tut ¡¡f th+ eütrurt or propo**d r¡pnt¡ïet fsr nùich tJrs fa.l¡æ rertifisqÈiün r['å.$ made, r*:hichev.'er Lt gleater, the co*t of tåe public entity's ínvesti¿¡ationn *rul rea.çonable attorney fee*n in additian to the fina. ^ù pt:mtn who tubxr¡ltod s f*lse tertifl*adion *h*ll l¡e ileligihle t* bid 0n e ttquúst for prer¡rlsal for I ¡e*rx fi.trrrr tJre date the public *ntity dstf¡minss È-lrat the per$on ha*. cubrnittsd the fêlçß r:eÌtification.

"!ec.

ü. I'l¡e ¡nuyition* üt tì¡is åeÈ lil'É *ffer*ive *nty if l.rat iÊ å rústn $pûnÉûr rrf teryr¡r ffi dsfined untìe-r **c4ilr¡ ? of tho ditss-t*re¡rl fronr ten"or: uct, lútlû P ¿3d, Itftl- lg9.t9S.

Iln*cting Èerli(rn t. Tl¡is rrct {rke-q effe'tt April }, ãûlf, Thix rc{ l* +rdmetl tt tske immediate eiT*cL

C^^-P /tt*^*- V,;...j-, Secretarl¡ of the Senate

*Î tlerk of lhs ï{nu*+ of ßo¡rr+sëÍtflt¡$Ès

The Christman Company Form of Sworn Statement of Familial Relationships

00205-1

FORM OF SWORN STATEMENT OF FAMILIAL RELATIONSHIP

As required by Section 1267 of the Revised School Code - MCL 380.1267

STATE OF MICHIGAN

: ss.

COUNTY OF NEWAYGO

__________________________________, being duly sworn, deposes and says:

That ________________________________ (the "Bidder") has bid to be the (Contractor) (Subcontractor) for an improvement to the following described real property located in Newaygo County, Michigan, which is owned by the Newaygo Public School District, and legally described as follows:

VERA WILSIE ELEMENTARY SCHOOL

140 Main Street Newaygo, Michigan 49337

That the following is a statement of disclosure of any familial relationship that exists between the owner or any employee of the Bidder and any member of the Newaygo Public School District Board of Education or the Superintendent, as required pursuant to Section 1267 of the Revised School Code, as amended.

That there are no such familial relationships existing at this time.

That a familial relationship exists between _________________________________, who is an (owner) (employee) of the Bidder and the __________________ (nature of familial relationship - e.g., brother, sister, cousin, etc.) of _____________________________, who is (a member of the Board) (the Superintendent).

Deponent

Subscribed and sworn to before me this ________ day of ______________________, 2017.

____________________________________Notary Public, County, Michigan

My commission expires: _______________ mwalker Line

STATE OF MICHIGAN

Wage and Hour Division

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243) www.michigan.gov/wagehour

Informational Sheet: Prevailing Wages on State Projects

P a g e | 1 of 10

REQUIREMENTS OF

THE PREVAILING WAGES ON STATE PROJECTS ACT, PUBLIC ACT 166 OF 1965

The State of Michigan determines prevailing rates pursuant to the Prevailing Wages on State Projects Act, Public Act 166 of 1965, as amended. The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects for which the state or a school district is the contracting agent and which is financed or financially supported by the state. By law, prevailing rates are compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. The official prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. Prevailing wage is satisfied when wages plus fringe benefits paid to a worker are equal to or greater than the required rate.

State of Michigan responsibilities under the law:

• The department establishes the prevailing rate for each classification of construction mechanic requested by a contracting agent prior to contracts being let out for bid on a state project.

Contracting agent responsibilities under the law:

• If a contract is not awarded or construction does not start within 90 days of the date of the issuance of rates, a re- determination of rates must be requested by the contracting agent.

• Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts being let out for bid on a state project.

• The contracting agent, by written notice to the contractor and the sureties of the contractor known to the contracting agent, may terminate the contractor's right to proceed with that part of the contract, for which less than the prevailing rates have been or will be paid, and may proceed to complete the contract by separate agreement with another contractor or otherwise, and the original contractor and his sureties shall be liable to the contracting agent for any excess costs occasioned thereby.

Contractor responsibilities under the law:

• Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing rates prescribed in a contract.

• Every contractor and subcontractor shall keep an accurate record showing the name and occupation of and the actual wages and benefits paid to each construction mechanic. This record shall be available for reasonable inspection by the contracting agent or the department.

• Each contractor or subcontractor is separately liable for the payment of the prevailing rate to its employees.

• The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to commencement of work.

• A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of Labor, Bureau of Apprenticeship and Training and the rate is included in the contract.

Enforcement:

A person who has information of an alleged prevailing wage violation on a state project may file a complaint with the State of Michigan. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with Section 5 of Act 166, the investigation will be concluded and a referral may be made to the local prosecuting attorney.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 2 of 10

General Information Regarding Fringe Benefits

Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate:

o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract or policy o If a fringe benefit is paid into a fund, for a construction mechanic

When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week).

The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated:

Vacation 40 hours X $14.00 per hour = $560/2080 = $.27 Dental insurance $31.07 monthly premium X 12 mos. = $372.84 /2080 = $.18 Vision insurance $5.38 monthly premium X 12 mos. = $64.56/2080 = $.03 Health insurance $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $1.33 Life insurance $27.04 monthly premium X 12 mos. = $324.48/2080 = $.16 Tuition $500.00 annual cost/2080 = $.24 Bonus 4 quarterly bonus/year x $250 = $1000.00/2080 = $.48 401k Employer Contribution $2000.00 total annual contribution/2080 = $.96

Total Hourly Credit $3.65

Other examples of the types of fringe benefits allowed:

Sick pay Holiday pay Accidental Death & Dismemberment insurance premiums

The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate o Legally required payments, such as:

Unemployment Insurance payments Workers’ Compensation Insurance payments FICA (Social Security contributions, Medicare contributions) o Reimbursable expenses, such as:

Clothing allowance or reimbursement Uniform allowance or reimbursement Gas allowance or reimbursement Travel time or payment Meals or lodging allowance or reimbursement Per diem allowance or payment o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as:

Industry advancement funds Financial or material loans

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 3 of 10

OVERTIME PROVISIONS for MICHIGAN PREVAILING WAGE RATE COMMERCIAL SCHEDULE

1. Overtime is represented as a nine character code. Each character represents a certain period of time after the first 8 hours Monday thru Friday.

Monday thru Friday Saturday Sunday & Holidays

Four 10s

First 8 Hours 4

8 9 9th Hour 1 5

10th Hour 2 6

Over 10 hours 3 7

Overtime for Monday thru Friday after 8 hours:

the 1st character is for time worked in the 9th hour (8.1 - 9 hours) the 2nd character is for time worked in the 10th hour (9.1 - 10 hours) the 3rd character is for time worked beyond the 10th hour (10.1 and beyond)

Overtime on Saturday:

the 4th character is for time worked in the first 8 hours on Saturday (0 - 8 hours) the 5th character is for time worked in the 9th hour on Saturday (8.1 - 9 hours) the 6th character is for time worked in the 10th hour (9.1 - 10 hours) the 7th character is for time worked beyond the 10th hour (10.01 and beyond)

Overtime on Sundays & Holidays The 8th character is for time worked on Sunday or on a holiday

Four Ten Hour Days The 9th character indicates if an optional 4-day 10-hour per day workweek can be worked between Monday and Friday without paying overtime after 8 hours worked, unless otherwise noted in the rate schedule. To utilize a 4 ten workweek, notice is required from the employer to employee prior to the start of work on the project.

2. Overtime Indicators Used in the Overtime Provision:

H - means TIME AND ONE-HALF due X - means TIME AND ONE-HALF due after 40 HOURS worked D - means DOUBLE PAY due Y - means YES an optional 4-day 10-hour per day workweek can be worked without paying overtime after 8 hours worked N - means NO an optional 4-day 10-hour per day workweek cannot be worked without paying overtime after 8 hours worked

3. EXAMPLES:

HHHHHHHDN - This example shows that the 1½ rate must be used for time worked after 8 hours Monday thru Friday (characters 1 - 3); for all hours worked on Saturday, 1½ rate is due (characters 4 - 7). Work done on Sundays or holidays must be paid double time (character 8). The N (character 9) indicates that 4 ten-hour days is not an acceptable workweek at regular pay.

XXXHHHHDY - This example shows that the 1½ rate must be used for time worked after 40 hours are worked Monday thru Friday (characters 1-3); for hours worked on Saturday, 1½ rate is due (characters 4 – 7). Work done on Sundays or holidays must be paid double time (character 8). The Y (character 9) indicates that 4 ten-hour days is an acceptable alternative workweek.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 4 of 10

ENGINEERS - CLASSES OF EQUIPMENT LIST

UNDERGROUND ENGINEERS

CLASS I

Backfiller Tamper, Backhoe, Batch Plant Operator, Clam-Shell, Concrete Paver (2 drums or larger), Conveyor Loader (Euclid type), Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, End Loader, Gradall (and similar type machine), Grader, Power Shovel, Roller (asphalt), Scraper (self propelled or tractor drawn), Side Broom Tractor (type D-4 or larger), Slope Paver, Trencher (over 8’ digging capacity), Well Drilling Rig, Mechanic, Slip Form Paver, Hydro Excavator.

CLASS II

Boom Truck (power swing type boom), Crusher, Hoist, Pump (1 or more 6" discharge or larger gas or diesel powered by generator of 300 amps or more, inclusive of generator), Side Boom Tractor (smaller than type D-4 or equivalent), Tractor (pneu-tired, other than backhoe or front end loader), Trencher (8’ digging capacity and smaller), Vac Truck.

CLASS III

Air Compressors (600 cfm or larger), Air Compressors (2 or more less than 600 cfm), Boom Truck (non-swinging, non-powered type boom), Concrete Breaker (self-propelled or truck mounted, includes compressor), Concrete Paver (1 drum, ½ yard or larger), Elevator (other than passenger), Maintenance Man, Mechanic Helper, Pump (2 or more 4" up to 6" discharge, gas or diesel powered, excluding submersible pump), Pumpcrete Machine (and similar equipment), Wagon Drill Machine, Welding Machine or Generator (2 or more 300 amp or larger, gas or diesel powered).

CLASS IV

Boiler, Concrete Saw (40HP or over), Curing Machine (self-propelled), Farm Tractor (w/attachment), Finishing Machine (concrete), Firemen, Hydraulic Pipe Pushing Machine, Mulching Equipment, Oiler (2 or more up to 4", exclude submersible), Pumps (2 or more up to 4" discharge if used 3 hrs or more a day-gas or diesel powered, excluding submersible pumps), Roller (other than asphalt), Stump Remover, Vibrating Compaction Equipment (6’ wide or over), Trencher (service) Sweeper (Wayne type and similar equipment), Water Wagon, Extend-a-Boom Forklift.

HAZARDOUS WASTE ABATEMENT ENGINEERS

CLASS I

Backhoe, Batch Plant Operator, Clamshell, Concrete Breaker when attached to hoe, Concrete Cleaning Decontamination Machine Operator, Concrete Pump, Concrete Paver, Crusher, Dozer, Elevating Grader, Endloader, Farm Tractor (90 h.p. and higher), Gradall, Grader, Heavy Equipment Robotics Operator, Hydro Excavator, Loader, Pug Mill, Pumpcrete Machines, Pump Trucks, Roller, Scraper (self-propelled or tractor drawn), Side Boom Tractor, Slip Form Paver, Slope Paver, Trencher, Ultra High Pressure Waterjet Cutting Tool System Operator, Vactors, Vacuum Blasting Machine Operator, Vertical Lifting Hoist, Vibrating Compaction Equipment (self-propelled), and Well Drilling Rig.

CLASS II

Air Compressor, Concrete Breaker when not attached to hoe, Elevator, End Dumps, Equipment Decontamination Operator, Farm Tractor (less than 90 h.p.), Forklift, Generator, Heater, Mulcher, Pigs (Portable Reagent Storage Tanks), Power Screens, Pumps (water), Stationary Compressed Air Plant, Sweeper, Water Wagon and Welding Machine.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 5 of 10

CARPENTER CRAFT JURISDICTION

Michigan recognizes the Carpenters for any and all work related to weatherization that has historically been the work of the Carpenter. This work shall include, but not be limited to: all work defined under the Federal Weatherization Assistance Program.

The jurisdiction of Carpenters, as to all work that has historically and traditionally been performed consisting of the milling, fashioning, joining, assembling, erecting, fastening or dismantling of all materials of wood, plastic, metal, fiber, cork, or composition and all other substitute materials, as well as the handling, cleaning, erecting, installing and dismantling of all machinery, equipment and all materials used by Carpenters.

The jurisdiction, therefore, extends over the following divisions and subdivisions of the trade: Carpenters and Joiners, Millwrights, Pile Drivers, Bridge, Dock and Wharf Carpenters, Underpinners, Timbermen, and Core-drillers, Shipwrights, Boat Builders, Ship- hand, Stair-Builders, Millmen, Wood and Resilient Floor Decorators, Floor Finishers, Carpet-layers, Shinglers, Siders, Insulators, Acoustic and Drywall Applicators, Sharers and House Movers, Loggers, Lumber and Sawmill Workers, Reed and Rattan Workers, Shingle Weavers, Casket and Coffin Makers, Railroad Carpenters and Car Builders, regardless of material used and all those engaged in the operation of woodworking or other machinery required in fashioning, milling or manufacturing of products used in the trade, and the handling, erecting and installing materials on any of the above divisions or sub-divisions, burning, welding and rigging incidental to the trade. When the term "Carpenter and Joiner" is used, it shall mean all the subdivisions of the trade. The trade autonomy of Carpenters therefore extends over the divisions and subdivisions of the trade, which are set forth as follows:

(a) The framing, erecting and prefabrication of roofs, partitions, floors and other parts of buildings of wood, metal, plastic or other substitutes; application of all metal flashing used for hips, valleys and chimneys; the erection of Stran Steel section or its equal. The building and setting of all forms and centers for brick and masonry. The fabrication and erection of all forms for concrete and decking, the dismantling of same (as per International Agreement) when they are to be re-used on the job or stored for re-use. The cutting and handling of all falsework for fireproofing and slabs. Where power is used in the setting or dismantling of forms, all signaling and handling shall be done by carpenters. The setting of templates for anchor bolts for structural members and for machinery, and the placing, leveling and bracing of these bolts. All framing in connection with the setting or metal columns. The setting of all bulkheads, footing forms and the setting of and fabrication of, screeds and stakes for concrete and mastic floors where the screed is notched or fitted, or made up of more than one member. The making of forms for concrete block, bulkheads, figures, posts, rails, balusters and ornaments, etc.

(b) The handling and erecting of rough material and drywall, the handling, assembly, setting and leveling of all fixtures, display cases, all furniture such as tables, chairs, desks, coat racks, etc., all de-mountable or moveable partitions such as Von wall, E Wall, Steel Case, Herman Miller, Haworth, American Seating, Westinghouse, Lazy Boy, rosewood, etc. All rebuilding, remodeling and setting up of all kinds of partitions, finished lumber, metal and plastic trim to be erected by Carpenters shall be handled from the truck or vehicle delivering same to the job by Carpenters.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 6 of 10

(c) The building and moving of all scaffolding runways and staging where carpenters' tools are used, the building from the ground up of all scaffolds over fourteen (14) feet in height including metal and specially designed scaffolding. The building and construction of all hoists and derricks made of wood; the making of mortar boards, boxes, trestles, all shoring, razing and moving of buildings. Lift type trucks are to be considered a tool of the trade. Metal siding and metal roofing fall within the scope of jurisdiction for the carpenters.

(d) The cutting or framing and fireproofing of the openings for pipes, conduits, ducts, etc., where they pass through floors, partitions, walls, roofs or fixtures composed in whole or in part of wood. The laying out of making and installation of all inserts and sleeves for pipes, ducts, etc., where carpenters' tools and knowledge are required. The making and installing of all wooden meter boards, crippling and backing for fixtures. The welding of studs and other fastenings to receive material being applied by carpenters.

(e) The installation of all grounds, furring or stripping, ceilings and sidewalks, application of all types of shingling and siding, etc.

(f) The installation of all interior and exterior trim or finish of wood, aluminum, kalamein, hollow or extruded metal, plastic, doors, transoms, thresholds, mullions and windows. The setting of jambs, bucks, window frames of wood or metal where braces or wedges are used. The installation of all wood, metal or other substitutes of casing, molding, chair rail, wainscoting, china closets, base of mop boards, wardrobes, metal partitions as per National Decisions or specific agreements, etc. The complete laying out, fabrication and erection of stairs. The making and erecting of all fixtures, cabinets, shelving, racks, louvers, etc. The mortising and application of all hardware in connection with our work. The sanding and refinishing of all wood, cork or composition floors to be sanded or scraped, filled, sized and buffed, either by hand or power machines. The assembling and setting of all seats in theaters, halls, churches, schools, auditorium, grandstands and other buildings. All bowling alley work.

(g) The manufacture, fabrication and installation of all screens, storm sash, storm doors and garage doors; the installation of wood, canvas, plastic or metal awnings or eye shades, door shelters, jalousies, etc. The laying of wood, wood block and wood composition in floors.

(h) The installation of all materials used in drywall construction, such as plasterboard, all types of asbestos boards, transite and other composition board. The application of all material which serves as base for acoustic tile, except plaster. All acoustical applications as per National Agreement or specific agreement.

(i) The building and dismantling of all barricades, hand rails, guard rails, partitions and temporary partitions. The erection and dismantling of all temporary housing on construction projects.

(j) The installation of rock wool, cork and other insulation material used for sound or weatherproofing. The removal of caulking and placing of staff bead and brick mold and all Oakum caulking, substitutes, etc., and all caulking in connection with carpentry work.

(k) The installation of all chalk boards/marker boards.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 7 of 10

(l) The operation of all hand operated winches used to raise wooden structures.

(m) The erection of porcelain enameled panels and siding.

(n) The unloading and distribution of all furnished, prefabricated and built-up sections such as door bucks, window frames, cupboards, cabinets, store fixtures, counters and show cases or comparably finished or prefabricated materials, to the job sites or points of installation as used in the construction, alteration and remodeling industry.

(o) The handling of doors, metal, wood or composite, partitions and other finished bulk materials used for trim from the point of delivery.

(p) All processing of these materials and handling after processing.

(q) The making up of panels and fitting them into walls, all bracing and securing, all removal of panels from the casting including all braces, whalers, hairpins, etc.

(r) The handling and setting of all metal pans and sections from the stock piles of reasonable distance as required by job needs shall be performed by carpenters. The stripping of such metal pans, panels or sections is to be performed by carpenters.

(s) The sharpening of all carpenter hand or power tools, or those used by carpenters.

(t). The layout, fabrication, assembling of and erection and dismantling of all displays made of wood, metal, plastic, composition board or any substitute material; the covering of same with any type of material, the crating and un-crating, the handling from the point of unloading and back to the point of loading of all displays and other materials or components.

(u) The same shall apply to all other necessary component parts used for display purposes such as turntables, platforms, identification towers and fixtures, regardless of how constructed, assembled or erected or dismantled.

(v) The make-up, handling, cutting and sewing of all materials used in buntings, flags, banners, decorative paper, fabrics and similar materials used in the display decorative industry for draperies and back drops. The decorative framing of trucks, trailers and autos used as floats or moving displays. The slatting of walls to hand fabrics and other decorative materials, drilling of all holes to accommodate such installations. Setting up and removal of booths constructed of steel or aluminum tubing as stanchions, railings, etc., handling and placing of furniture, appliances, etc., which are being used to complete the booth at the request of the exhibitor. Fabricating and application of leather, plastic and other like materials used for covering of booths. The handling of all materials, fabricating of same. The loading and unloading, erecting and assembling at the exhibit of show area, also in or out of storage when used in booth decorations.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 8 of 10

(w) A display shall be construed as any exhibit or medium of advertising, open to private or public showing, which is constructed of wood, metal, plastic or any other substitute to accomplish the objectives of advertising or displaying.

(x) Handling, fitting, draping, measuring and installation of fixtures and other hardwares for draperies, all manner of making, measuring, repairing, sizing, hanging and installation of necessary fixtures and hardware for shades and Venetian blinds.

(y) Work consisting of cutting and/or forming of all materials in preparation for installing of floors, walls and ceilings;

the installation of all resilient floor and base; wall and ceiling materials to include cork, linoleum, prefabricated, laminated, rubber, asphalt, vinyl, metal, plastic, seamless floors and all other similar materials in sheet, interlocking liquid or tile form; the installation of all artificial turf, the installation, cutting and/or fitting of carpets;

installation of padding, matting, linen crash and all preformed resilient floor coverings; the fitting of all devices for the attachment of carpet and other floor, wall and ceiling coverings; track sewing of carpets, drilling of holes for sockets and pins, putting in dowels and slats; and all metal trimmings used; the installation of all underlayments, sealants in preparation of floors, walls and ceilings, the unloading and handling of all materials to be installed and the removal of all materials in preparing floors when contracted for by the employer, shall be done only by employees covered under this Agreement.

(z) The installation of all sink-tops and cabinets, to include all metal trim and covering for same. All cork, linoleum, congo-wall, linewall, veos tile, plexiglass, vinawall tile, composition tile, plastic tile, aluminum tile and rubber in sheets or tile form and the application thereof. All bolta-wall and bolta-wall tile and similar products.

(aa) The handling and placing of all pictures and frames and the assembly of bed frames and accessories. The hanging and placing of all signage.

(bb) The installation of all framework partitions and trim materials for toilets and bathrooms made of wood, metal, plastics or composition materials; fastening of all wooden, plastic or composition cleats to iron or any other material for accessories.

(cc) The erection of cooling towers and tanks.

(dd) The setting, lining, leveling and bracing of all embedded plates, rails and angles. The setting of all stay in place forms.

(ee) Environmental: Clean room, any type of environmental chamber, walk in refrigerated coolers and all refrigerated rooms or buildings.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 9 of 10

PILE DRIVING AND CAISSON DRILLING

(ff) All unloading, handling, signaling and driving of piles, whether wood, steel, pipe, beam pile, composite, concrete or molded in place, wood and steel sheeting, cofferdam work, trestle work, dock work, floating derricks, caisson work, foundation work, bridge work, whether old or new, crib work, pipe line work and submarine work. Cutting of all wood, steel or concrete pile, whether by machine or hand; welding and cutting, peeling, and heading of all wood pile, steel sheeting and wood sheeting. The erecting and dismantling of all pile driving rigs, also derricks whether on land or water; also the moving, shoring and underpinning of all buildings. The loading and unloading of all derricks, cranes and pile driving materials. The tending, maintenance and operation of all valves pertaining to the operation of driving of pile. All diving and tending essential to the completion of jurisdictional claims.

All work done in the established yards of the Company and all work not enumerated above, shall be handled and manned as the Employer decides.

The pile driver will unload all material shipped in by rail from the point that the rail car is spotted.

All cleaning and preparation of all piling prior to driving.

The welding and attachment of all boot plates, pile points, splice plates, connectors, rock crosses, driving crosses, driving rigs, point reinforcements and overboots.

The construction, reconstruction, repair, alteration, demolition and partial or complete removal of all marine work including, but not limited to, docks, piers, wharves, quays, jetties, cribs, causeways, breakwaters, lighthouses and permanent buoys, etc. (mixing and placing of concrete excepted).

The driving and pulling of all wood, steel and concrete foundation piles and sheet piling.

The heading, pointing, splicing, cutting and welding of all piles.

The placing of all wales, bolts, studs, lagging, rods and washers including the cutting, drilling, boring or breaking of all holes or openings thereof.

The removal of all materials and/or obstructions of any nature (rip-rap included) that retard or interfere with the driving of piles or with the placing of wales, bolts and rods.

P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)

P a g e | 10 of 10

This is to be subject to the discretion of the contractor who may choose to use blasting specialists or other demolition specialists.

The handling on the job of all materials used in the work.

The manning of all floating equipment (towing equipment excepted) engaged in the work enumerated, including deck engines, except machinery manned by Operating Engineers.

The placing of all rip-rap, fill stone, bedding stone, cover stone and concrete blocks in connection with marine construction. Work normally performed by Employers, such as soil tests, shoring, underpinning of buildings, cribbing, driving of sheet piling, marine divers, tenders, underwater construction workers and similar operations shall continue to be included in the jurisdiction of this Agreement.

All burning, cutting, welding and fabrication of pipe, H-beams, sheet pile (metal or wood), done on the job site or in the yard of the Employer shall be done by pile drivers. The driving of bearing piles, sheet piling with heavy equipment, caissons, pile caps, auger drilling and boring, the setting up for load testing for any type of piling, all layout and spotting for piling, caisson and boring work, all earth retention, ditch boarding, installing tiebacks.

ASBESTOS ABATEMENT CARPENTERS

(gg) All erection and maintenance of barriers and partitions used in the removing of asbestos or any abatement work. The abatement of any materials previously installed by the carpenter such as transite, ceiling and floor tiles. All operating and maintaining of current equipment used in any abatement work.

State of Michigan WHPWRequest@michigan.gov Official Request #: 150

Requestor: Newaygo Public School District Project Description: To Be Determined

Project Number:

Newaygo County

Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 1/29/2018

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Asbestos & Lead Abatement Laborer

MLDC 9/7/2017

Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y

Apprentice Rates:

Trainee 600 hours + 1 calendar year $30.22 $33.28 $41.73 comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Asbestos, Lead and Mold Abatement, Hazardous Material Handler

AS207 3/27/2017

Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Boilermaker

BO169 2/17/2015

Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y

Apprentice Rates:

1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

County: Newaygo

Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 1/29/2018

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Bricklayer

BR-9-1-B 11/3/2016

Bricklayer & Block Masonry $41.20 $53.42 $65.64 H H H H H H H D Y

Apprentice Rates:

0-749 hours $30.60 $37.77 $44.94 750 - 1,499 hours $31.93 $39.76 $47.60 1,500 - 2,249 hours $33.25 $41.74 $50.24 2,250 - 2,999 hours $34.58 $43.74 $52.90 3,000 - 3,749 hours $35.90 $45.72 $55.54 3,750 - 4,499 hours $37.22 $47.70 $58.18 5,250 - 6,000 hours $39.87 $51.68 $63.48 comment make up day allowed Saturday for bricklayer only No make up day for block 4 10s allowed M-F

BR-9-1-BL 11/3/2016

Stone Mason and Artificial Masonry $41.20 $53.42 $65.64 H H H H H H H D Y

Apprentice Rates:

0-749 hours $31.93 $39.76 $47.60 750 -1499 hours $33.25 $41.74 $50.24 1500-2249 hours $34.58 $43.74 $52.90 2250-2999 hours $35.90 $45.72 $55.54 3000-3749 hours $37.22 $47.70 $58.18 3750-4499 hours $38.55 $49.70 $60.84 comment 4 10s allowed M-F

Carpenter

CA-100 7/5/2017

Carpenter $40.35 $51.16 $61.96 X X H H H H H D N

Apprentice Rates:

1st year $33.87 $41.44 $49.00 2nd year $34.95 $43.06 $51.16 3rd year $37.11 $46.30 $55.48 4th year $39.27 $49.54 $59.80 comment make up day allowed Saturday

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision

CA-100FL 7/5/2017

Floor Layer $42.09 $53.76 $65.42 X X H H H H H D N

Apprentice Rates:

1st year $32.76 $39.76 $46.76 2nd year $35.09 $43.26 $51.42 3rd year $37.42 $46.75 $56.08 4th year $38.59 $48.50 $58.42 comment make up day allowed Saturday

Cement Finisher

BR-9-1-CF 11/3/2016

Cement Finisher & Plasterer $36.49 $47.25 $58.01 X X H X X X H D Y

Apprentice Rates:

0-749 hours $28.32 $35.21 $42.11 750-1499 hours $29.48 $36.95 $44.43 1500-2249 hours $30.65 $38.70 $46.77 2250-2999 hours $31.82 $40.46 $49.11 3000-3749 hours $32.99 $42.22 $51.45 3750-4499 hours $34.16 $43.97 $53.79 comment 4 10s allowed M-F; plasterer OT schedule is HHHHHHHDY

Cement Mason

PL16-8 8/18/2016

Cement Mason $36.97 $48.56 $60.14 H H H H H H H D Y

Apprentice Rates:

1st year $28.86 $36.39 $43.92 2nd year $31.18 $39.87 $48.56 3rd year $33.49 $43.34 $53.18 comment make up day allowed Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Drywall

PT-845-DF 6/2/2016

Drywall Taper and Finisher $38.89 $51.89 $64.89 H H H H H H H D N

Apprentice Rates:

0 - 1,000 hours $27.19 $34.34 $41.49 1,001 - 2,000 hours $28.49 $36.29 $44.09 2,001 to 3,000 hours $30.57 $39.41 $48.25 3,001 to 4,000 hours $32.39 $42.14 $51.89 4,001 to 5,000 hours $34.99 $46.04 $57.09 5,001 to 6,000 hours $37.59 $49.94 $62.29

Electrician

EC-275 SC 10/1/2014

Sound and Communication Journeyman Technician $34.32 $47.25 $60.18 H H H H H H H D Y

Apprentice Rates:

1st period $18.88 $26.64 $34.39 2nd period $21.63 $30.68 $39.73 3rd period $24.37 $34.71 $45.05 4th period $27.12 $38.75 $50.39 comment make up day allowed Four consecutive 10s allowed M-Th/Friday may be used as a make-up day

EC-275-IW 8/25/2017

Journeyman Electrician - Inside Wireman $48.84 $69.90 $90.96 H H H H H H H D Y

Apprentice Rates:

1st period 0-1000 hours $19.33 $25.71 $32.08 2nd period 1001-2000 hrs $20.90 $28.07 $35.22 3rd period 2001-3500 hrs $24.28 $33.13 $41.98 4th period 3501-5000 hrs $25.90 $35.57 $45.22 5th period 5001-6500 hrs $29.75 $41.34 $52.92 6th period 6501-8000 hrs $33.06 $46.31 $59.54 comment make up day allowed 4 consecutive 10s allowed M-Th Friday may be used as a make-up day, Overtime @ time and half after 10 hours worked in a day or 40 in week when 4 10 hour days worked

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Elevator Constructor

EL-85 4/8/2013

Elevator Constructor Mechanic $70.77 $116.32 D D D D D D D D Y

Apprentice Rates:

1st year $50.27 $75.32 2nd year $54.83 $84.44 3rd year $57.10 $88.98 4th year $61.66 $98.10 comment 4 tens allowed M-TH

Glazier

GL-826 6/3/2016

Glazier $44.78 $60.87 $76.95 H H H H H H H D Y

Apprentice Rates:

1st 6 months $31.91 $41.57 $51.21 2nd 6 months $33.52 $43.98 $54.43 3rd 6 months $35.12 $46.38 $57.63 4th 6 months $36.74 $48.81 $60.87 5th 6 months $38.35 $51.22 $64.09 6th 6 months $39.96 $53.64 $67.31 7th 6 months $41.57 $56.05 $70.53 8th 6 months $43.17 $58.45 $73.73 comment 4 tens allowed on consecutive days

Heat and Frost Insulator

AS25S 3/31/2017

Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

County: Statewide

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Heat and Frost Insulator and Asbestos Worker

AS47 7/25/2017

Heat and Frost Insulator and Asbestos Worker $47.75 $63.01 $78.27 H H H H H H H D Y

Apprentice Rates:

1st year $27.88 $35.51 $43.14 2nd year $31.85 $41.00 $50.16 3rd year $35.82 $46.50 $57.18 4th year $39.80 $52.01 $64.22 5th year $43.78 $57.51 $71.25 comment make up day allowed Friday for cancelled work in a four 10 hour schedule

Ironworker

IR-25-F2 3/31/2017

Fence, Sound Barrier & Guardrail erection/installation and Exterior $31.95 $42.05 $52.15 X X H X X X H D Y Signage work

Apprentice Rates:

60% Level $22.99 $29.05 $35.11 65% Level $24.11 $30.68 $37.24 70% Level $25.24 $32.31 $39.38 75% Level $26.35 $33.92 $41.50 80% Level $27.47 $35.55 $43.63 85% Level $28.59 $37.18 $45.76 comment Four ten hour work days may be worked during Monday-Saturday.

IR-25-HH-WEST 12/5/2016

Heavy Hauler $41.43 $52.55 $63.67 H H H H H H H D Y

Apprentice Rates:

1st Year $26.18 $31.74 $37.30 2nd Year $29.52 $36.75 $43.98 3rd Year $34.71 $43.60 $52.50 4th Year $36.94 $46.95 $56.96 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision

IR-25-PE-Z2 3/31/2017

Pre-engineered Metal Work $45.87 $56.03 $66.19 X X H X X X X D Y

Apprentice Rates:

Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41 comment make up day allowed 4 tens allowed M-Th with Saturday make up day

IR-25-REF-WEST 7/5/2017

Reinforcing: any work in connection with field fabrication, post $49.25 $61.47 $73.68 H H H H H H H D Y tensioning, prestressing of handling by power, rigging, crane signaling, crane assembly and dismantle, racking, sorting, cutting, bending, hoisting, placing, burning, welding, use of tie gun, and tying of all materials used to reinforce concrete construction. Realigning of reinforcing steel, wire mesh and placing of steel dowels, as well as refastening and resetting same while concrete is being poured. The handling and placing of j or jack bar on slip form construction. The placing of all clips, bolts, and steel rods and wire fabricator mesh pertaining to gunite construction. Drilling holes in concrete for dowels used to reinforce a concrete slab, beam or wall and the use of a chemical anchoring system (such as epoxy) to secure dowels. The use of a non-metallic carbon fiber or polymer typically used to reinforce concrete. Some brand names are NEFMAC, leadline or Tokyo rope.

Apprentice Rates:

1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 150 Official Rate Schedule

Requestor: Newaygo Public School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract.

Contract must be awarded by: 4/29/2018

Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision IR-25-RIG-west 7/5/2017 Rigging, heavy machinery moving and related tasks $49.25 $61.47 $73.68 X X X X X X X D Y

Apprentice Rates:

1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed Saturday

IR-25-STR-WEST 7/5/2017

Structural, ornamental, welder and pre-cast $49.25 $61.47 $73.68 H H H H H H H D Y

Apprentice Rates:

1ST LEVEL $31.94 $40.13 $48.32

2ND LEVEL $31.94 $40.13 $48.32

3RD LEVEL $33.47 $42.42 $51.37

4TH LEVEL $35.00 $44.71 $54.41

5TH LEVEL $37.87 $47.72 $57.57

6TH LEVEL $38.94 $49.31 $59.69

7TH LEVEL $42.45 $53.35 $64.25

8TH LEVEL $43.52 $54.95 $66.37

comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 150 Official Rate Schedule