This document contains a submittal schedule for a federal construction renovation project and the related federal contract opportunity notice. The submittal schedule outlines the submission requirements for over 80 line items, including shop drawings, product data, samples, operation and maintenance manuals, and other submittals. Key submission deadlines are not specified.

The related federal contract opportunity is a pre-solicitation notice for a renovation project at a Department of Veterans Affairs medical center. The project scope involves renovating a portion of a building to house mental health programs and staff. The solicitation will be issued on November 30, 2020 via beta.sam.gov for a firm fixed price construction contract between $1-2 million. The contract will be a 100% set-aside for service-disabled veteran-owned small businesses. The selected contractor will have 280 days to complete the work.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NUMBER TITLE NONE SCHEDULE

SHOP

DRAWINGS

PRODUCT

DATA

SUSTAINA

BILITY

SAMPLES MSDS

DESIGN

DATA

TEST

REPORTS

CERTIFICA

TES

QUALIFIC

ATIONS

MFR

INSTRUCT

MFR FIELD

REPORT

O&M

DATA

CLOSE

OUT

OTHER

01 00 00 GENERAL REQUIREMENTS X X

01 32 16.15 PROJECT SCHEDULE X

01 33 23 SHOP DRAWINGS, PRODUCT DATA,

AND SAMPLES X

01 33 23a

MAXIMO ASSET PMI SCHEDULER X

01 35 26 SAFETY REQUIREMENTS X APP, AHA, FIRE SAFETY PLAN

01 42 19 REFERENCE STANDARDS X

01 45 00 QUALITY CONTROL CQC PLAN

01 45 00a

QUALITY CONTROL REPORT FORM X

01 45 29 TESTING LABORATORY SERVICES X

01 57 19 TEMPORARY ENVIRONMENTAL

CONTROLS ENVIRO PLAN

01 58 16 TEMPORARY INTERIOR SIGNAGE X

01 74 19 CONSTRUCTION WASTE

MANAGEMENT DEMO DEBRIS MGMT PLAN

01 81 13 SUSTAINABLE CONSTRUCTION

REQUIREMENTS X X X

SUSTAINABILITY PLAN, IAQ

MGMT PLAN

02 41 00 DEMOLITION X

02 82 11 TRADITIONAL ASBESTOS

ABATEMENT X X X

ABATEMENT PLAN,

SUPPORTING DOCUMENTS

03 30 00 CAST-IN-PLACE CONCRETE X X DESIGN MIX

NOT USED

NOT USED

06 10 00 ROUGH CARPENTRY X

06 20 00 FINISH CARPENTRY X X X X X X

07 21 13 THERMAL INSULATION X X X

07 81 00 APPLIED FIREPROOFING X X

07 84 00 FIRESTOPPING X X X

07 92 00 JOINT SEALANTS X X X X X

07 95 13 EXPANSION JOINT COVER

ASSEMBLIES X X X X X

SECTION

DIV

01 - GENERAL REQUIREMENTS

02 - EXISTING CONDITIONS

03 - CONCRETE

SUBMITTALS

04 - MASONRY

05 - METALS

06 - WOOD, PLASTICS, AND COMPOSITES

07 - THERMAL AND MOISTURE PROTECTION

DRAWINGS

PRODUCT

DATA

SUSTAINA

BILITY

SAMPLES MSDS

DESIGN

DATA

TEST

REPORTS

CERTIFICA

TES

QUALIFIC

ATIONS

MFR

INSTRUCT

MFR FIELD

REPORT

O&M

DATA

CLOSE

OUT

OTHER

SECTION

DIV

01 - GENERAL REQUIREMENTS

SUBMITTALS

08 11 13 HOLLOW METAL DOORS AND

FRAMES X X X

08 14 00 INTERIOR WOOD DOORS X X X X

08 31 13 ACCESS DOORS AND FRAMES X X X

08 33 13 COILING COUNTER DOORS X X X X

08 41 13 ALUMINUM-FRAMED ENTRANCES

AND STOREFRONTS X X X

08 71 00 DOOR HARDWARE X X X

08 71 00a DOOR HARDWARE SCHEDULE X

08 80 00 GLAZING X X X X

09 05 16 SUBSURFACE PREPARATION FOR

FLOOR FINISHES X X

09 22 16 NON-STRUCTURAL METAL

FRAMING X X

09 29 00 GYPSUM BOARD X X

09 51 00 ACOUSTICAL CEILINGS X X X X

09 65 13

RESILIENT BASE AND ACCESSORIES X X X

09 65 16 RESILIENT SHEET FLOORING X X X X

09 65 19 RESILIENT TILE FLOORING X X X X X

09 68 00 CARPETING X X X X X

09 72 16 WALL COVERINGS X X X X X

09 91 00 PAINTING X X X X

10 14 00 SIGNAGE X X X X

10 21 23 CUBICLE CURTAIN TRACKS X X X

10 26 00 WALL AND DOOR PROTECTION X X X

10 28 00 TOILET, BATH, AND LAUNDRY

ACCESSORIES X X X

10 30 90 MANUFACTURED ELECTRIC

FIREPLACES X X X

10 44 13 FIRE EXTINGUISHER CABINETS X

10 51 23

PLASTIC-LAMINATE-CLAD LOCKERS X X X

NOT USED

12 32 00 MANUFACTURED WOOD

CASEWORK X X X X

12 32 00 COUNTERTOPS X X

NOT USED

08 - OPENINGS

09 - FINISHES

10 - SPECIALTIES

11 - EQUIPMENT

12 - FURNISHINGS

13 - SPECIAL CONSTRUCTION

DRAWINGS

PRODUCT

DATA

SUSTAINA

BILITY

SAMPLES MSDS

DESIGN

DATA

TEST

REPORTS

CERTIFICA

TES

QUALIFIC

ATIONS

MFR

INSTRUCT

MFR FIELD

REPORT

O&M

DATA

CLOSE

OUT

OTHER

SECTION

DIV

01 - GENERAL REQUIREMENTS

SUBMITTALS

DRAWINGS

PRODUCT

DATA

SUSTAINA

BILITY

SAMPLES MSDS

DESIGN

DATA

TEST

REPORTS

CERTIFICA

TES

QUALIFIC

ATIONS

MFR

INSTRUCT

MFR FIELD

REPORT

O&M

DATA

CLOSE

OUT

OTHER

SECTION

DIV

01 - GENERAL REQUIREMENTS

SUBMITTALS

NOT USED

21 13 13 WET-PIPE SPRINKLER SYSTEM X X X X X X

22 05 11 COMMON WORK RESULTS FOR

PLUMBING X X X

22 05 23 GENERAL DUTY VALVES FOR

PLUMBING PIPING X X X

22 07 11 PLUMBING INSULATION X X

22 11 00 FACILITY WATER DISTRIBUTION X X

22 13 00 FACILITY SANITARY AND VENT

PIPING X X

22 14 00 FACILITY STORM DRAINAGE X X

22 40 00 PLUMBING FIXTURES X X X

23 05 11 COMMON WORK RESULTS FOR

HVAC X X X

23 05 93 TESTING, ADJUSTING AND

BALANCING FOR HVAC X X X X

23 07 11 HVAC AND BOILER PLANT

INSULATION X

23 09 23 DIRECT-DIGITAL CONTROL SYSTEM

FOR HVAC X X X X X

23 21 13 HYDRONIC PIPING X X X X

23 25 00 HVAC WATER TREATMENT X X X X

23 31 00 HVAC DUCTS AND CASINGS X X

23 36 00 AIR TERMINAL UNITS X X X

23 37 00 AIR OUTLETS AND INLETS X X

26 05 11 REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS X

26 05 19

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES

X X

26 05 26 GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS X X X

26 05 33 RACEWAY AND BOXES FOR

ELECTRICAL SYSTEMS X X

26 09 23 LIGHTING CONTROLS X X X

26 24 16 PANELBOARDS X X X

26 27 26 WIRING DEVICES X X X

26 51 00 INTERIOR LIGHTING X X X

21 - FIRE SUPRESSION

14 - CONVEYING EQUIPMENT

22 - PLUMBING

23 - HVAC

26 - ELECTRICAL

DRAWINGS

PRODUCT

DATA

SUSTAINA

BILITY

SAMPLES MSDS

DESIGN

DATA

TEST

REPORTS

CERTIFICA

TES

QUALIFIC

ATIONS

MFR

INSTRUCT

MFR FIELD

REPORT

O&M

DATA

CLOSE

OUT

OTHER

SECTION

DIV

01 - GENERAL REQUIREMENTS

SUBMITTALS

27 05 11 REQUIREMENTS FOR

COMMUNICATIONS SYSTEMS X X X

27 05 26

GROUNDING AND BONDING FOR

COMMUNICATIONS SYSTEMS

X X

27 05 33 RACEWAYS AND BOXES FOR

COMMUNICATIONS SYSTEMS X X

27 10 00 CONTROL, COMMUNICATION AND

SIGNAL WIRING X X X

27 51 16 PUBLIC ADDRESS AND MASS

NOTIFICATION SYSTEMS X X X X

27 52 23 NURSE CALL AND CODE BLUE

SYSTEMS X X X X X

28 05 00

COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY

X X X

28 05 13

CONDUCTORS AND CABLES FOR

ELECTRONIC SAFETY AND SECURITY

X X X X

28 05 26

GROUNDING AND BONDING FOR

ELECTRONIC SAFETY AND SECURITY

X X X

28 25 28.33

CONDUITS AND BACKBOXES FOR

ELECTRONIC SAFETY AND SECURITY

X X X X

28 13 00 PHYSICAL ACCESS CONTROL

SYSTEMS X X X X X

28 23 00 VIDEO SURVEILLANCE X X X X

28 31 00 FIRE DETECTION AND ALARM X X X

32 28 00 PLANTING IRRIGATION X X X X X

32 90 00 PLANTING X X X X X X X

32 - EXTERIOR IMPROVEMENTS

27 - COMMUNICATIONS

28 - ELECTRONIC SAFETY AND SECURITY

File details come from the government source that posted it. Updated .