Drawings 515-20-102 Section 1 of 2.pdf
PDF 17 MB Posted
- Solicitation number
- 36C25021B0060
About this file
This document provides details of a federal solicitation for construction renovation services. The Department of Veterans Affairs will issue an invitation for bid on or around November 30, 2020 for Project 515-20-103 to renovate a portion of Building 7 at the VA Medical Center in Battle Creek, Michigan to house Mental Health programs and staff. The project is set aside solely for Service-Disabled Veteran Owned Small Businesses. The contractor will have 280 days to complete the work with a firm fixed price contract valued between $1-2 million to be awarded within 180 days of bid receipt. Interested parties should register at Contract Opportunities to access solicitation documents including specifications and drawings as of November 30th, with responses due per the solicitation. Firms must be registered in SAM and VetBiz, and have a current VETS-4212 report if applicable.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
NOT TO SCALE
SK
YL
INE
DR
HI
LL
B
RA
DY
R
D.
AR
MS
TR
ON
G
RD
.FORT CUSTER DR.
RIVER RD. W.
W. MICHIGAN AVE.
S.
BE
DF
OR
D
RD
.96
89 E. D AVE.
AU
GUSTA
DR.
E. B
EC
KW
ITH
DR.
NORTH BRANCH KALAMAZOO RIVER
E. MICHIGAN AVE.
8 MILE RD.
94 94
GALESBURG
AUGUSTA
BATTLE
CREEK
W. DICKMAN RD
W. DICKMAN RD
W. DICKMAN RD
N
EW
S
CAMPUS MAP
NOT TO SCALE
LAKE ERIE
GRAND
RAPIDS
TRAVERSE
CITY
LAKE SUPERIOR
UPPER PENINSULA
MACKINAW
CITY LAKE HURONALPENA
PETOSKEY
GAYLORD
GRAYLING
LA
KE
M
IC
HI
GA
N
SAGINAW
FLINT
LANSING
DETROIT
KALAMAZOO ANN
ARBOR
BATTLE
CREEK
LOCATION MAP
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
EXCELLENCEHEALTH
CARE
DEPARTMENT OF VETERANS AFFAIRS - BATTLE CREEK VA MEDICAL CENTER
BATTLE CREEK, MICHIGAN
RENOVATE B39-2 WEST FOR PATIENT PRIVACY
AND B39-1 NORTH & SOUTH, B39-2 NORTH & SOUTH, AND B39-1
WEST NURSE STATION REMODEL AND EXISTING PORCH BARRIER
SIGNATURE DATE
Director
Associated Director
Chief of Staff
Associate Director for Patient Care Services
Chief, FMS
Chief, Engineering Section
Chief, Police Service
Chief, Fire Service
Union Safety Representative
Chief, Environmental Management Section
Infection Control Officer
Patient Safety Manager
GEMS Coordinator
Safety Specialist
Contracting Officer
COR
SIGNATURE BLOCK
POSITION DATESIGNATUREPOSITION
Associate Chief of Staff for Mental Health
C:
\R ev it\2
0\1
4_ A_ mi ch ell e.b urr i.rv t 5/2
1/2
1 1 0:2
0:3 0 A
M
39-G001
COVER SHEET RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
515-20-102
05/20/2021
100% BID DOCUMENTS
515-20-102
SHEET
NO. SHEET NAME
FIRE PROTECTION PLAN
39-FP100 FIRE PROTECTION PLANS
PLUMBING
39-PL102 SECOND FLOOR DOMESTIC PLUMBING PLAN
39-PL112 SECOND FLOOR SANITARY, VENT & STORM PLAN
39-PL400 ENLARGED PLUMBING PLANS
39-PL600 PLUMBING SCHEDULES AND DETAILS
MECHANICAL
39-M000 MECHANICAL GENERAL INFORMATION
39-MD102 SECOND FLOOR MECHANICAL DEMOLITION PLAN
39-MH102 SECOND FLOOR MECHANICAL HVAC PLAN
39-MP102 SECOND FLOOR MECHANICAL PIPING PLAN
39-M500 MECHANICAL DETAILS
39-M600 MECHANICAL SCHEDULES
39-M800 CONTROL DIAGRAMS
ELECTRICAL
39-E000 ELECTRICAL GENERAL INFORMATION
39-ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
39-ED102 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
39-EL101 FIRST FLOOR LIGHTING PLAN
39-EL102 SECOND FLOOR LIGHTING PLAN
39-EP101 FIRST FLOOR POWER PLAN
39-EP102 SECOND FLOOR POWER PLAN
39-ET102 SECOND FLOOR TECHNOLOGY PLAN
39-E400 ENLARGED ELECTRICAL PLANS
39-E401 ENLARGED ELECTRICAL PLANS
39-E402 ENLARGED ELECTRICAL PLANS
39-E600 PANEL SCHEDULES
39-E700 ELECTRICAL RISER DIAGRAM
TOTAL SHEETS: 57
SHEET
NO. SHEET NAME
GENERAL
39-G001 COVER SHEET
39-G101 LIFE SAFETY PLANS
39-G111 PARTIAL SECOND FLOOR ASBESTOS REMOVAL PLAN
39-G121 INFECTION CONTROL RISK ASSESSMENT & PHASING PLANS
39-G131 DEDUCTIVE ALTERNATES
LANDSCAPE
39-L101 LANDSCAPE PLAN
39-L102 LANDSCAPE DETAILS
ARCHITECTURAL
39-A001 ARCHITECTURAL LEGENDS, SYMBOLS, AND ABBREVIATIONS
39-A002 PARTITION TYPES
39-AD101 PARTIAL FIRST FLOOR DEMOLITION PLAN
39-AD102 PARTIAL SECOND FLOOR DEMOLITION PLAN
39-A101 PARTIAL FIRST FLOOR PLAN
39-A102 PARTIAL SECOND FLOOR PLAN
39-A111 PARTIAL FIRST FLOOR REFLECTED CEILING PLAN
39-A112 PARTIAL SECOND FLOOR REFLECTED CEILING PLAN
39-A122 PARTIAL SECOND FLOOR EQUIPMENT PLAN
39-A130 ENLARGED PLANS - NURSE STATIONS
39-A131 ENLARGED PLANS - NURSE STATIONS
39-A132 ENLARGED PLANS
39-A133 ENLARGED PLANS
39-A311 WALL SECTIONS
39-A501 ARCHITECTURAL DETAILS
39-A502 NURSE STATION DETAILS
39-A503 DETAILS
39-A601 SCHEDULES & DIAGRAMS
INTERIORS
39-I102 PARTIAL FINISH PLAN - SECOND LEVEL
39-I121 SIGNAGE DETAILS
39-I122 SIGNAGE PLAN - SECOND LEVEL
39-I201 INTERIOR ELEVATIONS - NURSE STATIONS
39-I202 INTERIOR ELEVATIONS - NURSE STATIONS
39-I203 INTERIOR ELEVATIONS - SECOND LEVEL
39-I601 SCHEDULES & DIAGRAMS
Revisions: Date:
SCHEMATIC DESIGN - 35% 11/25/2019
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
95% CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 05/20/2021
ST
ATE OF MICHIGAN
L
IC
E N
SED PROFESSIONAL E
NG
IN
E E
RENGINEER
No.
5040000000000
SCOTT E.
TOWNSEND
05/20/2021
ST
ATE OF MICHIGAN
L
IC
EN
SED PROFESSIONAL E
NG
IN
E E
RENGINEER
No.
51101
NATHANIEL
STALKER
SS
NNNNNNN
SSESS D
S
PPP
N
SSSSS
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
S
NNN
S
NN
S
NN
S
NNN
S
NN
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSEEEEEEEEEEEEEEEEEDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
PPPPPP
DDDDDDDDDDDDDDDD
PPPP
DDDDDDDDDDDD
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
NNNNNNNNNNNNNN
DDD
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
SESSSSSSSSSSSSSSSSSSSSSS
NNNNNNNNNNNNNNN
SSSSSSSSSSSS
DDDD
SSSSSSSSSSSS
NENENNNN
L
EENN
L
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE
LLLLLLL
EEEEEEEEEEEEEE
LLLLLLLLLLLLLL
EEEE
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
EE
05/20/20215/20/2021 kristy.baisch Typewritten Text
DN DN
UP DN DN UP DN DN
UPUP UP UP
2'
-0
'-0
84'-0" 93'-0"
11'-8"
X X
F.E.
F.E.
F.E.
X
Z O
N E
2"
Z O
N E
1"
72 6
FIRE CODE RATINGS
SMOKE BARRIER - 1-HR
FIRE RESISTANCE RATED
FIRE BARRIER - 2-HR FIRE
RESISTANCE RATED
EXISTING SMOKE BARRIER - 1-HR
FIRE RESISTANCE RATED
EXISTING FIRE BARRIER - 2-HR
FIRE RESISTANCE RATED
NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET DESIGNATED
REQUIREMENTS & ADD OPENING & PENETRATION PROTECTIVES AS REQ'D
SMOKE COMPARTMENT AREA
NO SIGNIFICANT CHANGES TO GROSS SQUARE FOOTAGE OF
SMOKE COMPARTMENTS
FIRE BARRIER - 1-HR FIRE
RESISTANCE RATED
SMOKE PARTITION - 1/2-HR
FIRE RESISTANCE RATED
EXISTING FIRE BARRIER - 1-HR
FIRE RESISTANCE RATED
EXISTING SMOKE PARTITION -
1/2-HR FIRE RESISTANCE RATED
APPLICABLE CODES AND STANDARDS
BUILDING CODES: EDITION:
NFPA 101 LIFE SAFETY CODE 2018
INTERNATIONAL BUILDING CODE 2018
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) 2014
VA SUPPLEMENT: BARRIER FREE DESIGN 01/01/2017 REVISED 11/01/2018
PLUMBING CODE: EDITION:
INTERNATIONAL PLUMBING CODE 2018
HVAC CODE: EDITION:
ASME BOILER AND PRESSURE VESSEL CODE 2019
ASME CODE FOR PRESSURE PIPING VARIES
ASHREA STANDARD 62.1 - VENTILATION FOR
ACCEPTABLE INDOOR AIR QUALITY 2004
ASHREA STANDARD 15 - SAFETY STANDARD FOR
REFRIGERATION SYSTEMS 2007
ELECTRICAL CODE: EDITION:
NFPA 70 NATIONAL ELECTRICAL CODE 2020
FIRE CODES: EDITION:
NFPA NATIONAL FIRE CODES (EXCEPT NFPA 500 & NFPA 900) VARIES
CODE SUMMARY
FIRE EXTINGUISHER CABINET
SYMBOL LEGEND
DIST. TO
EXIT
PERSONS
TO EXIT EGRESS PATH COMPUTATION
HE HORIZONTAL EXIT
EXIT
F.E.
CODE SUMMARY IS BASED ON THE FOLLOWING CRITERIA:
• EXISTING BUILDING IS SPRINKLED THROUGHOUT AND MEETS THE REQUIREMENTS OF 2018 NFPA 101, CHAPTER 18 -
EXISTING HEALTH CARE OCCUPANCIES.
OCCUPANCY CLASSIFICATION:
NS BUILDING WEST BUILDING
• SECOND FLOOR: EX HEALTH CARE OCCUPANCY (UNCHANGED) EX HEALTH CARE OCCUPANCY (UNCHANGED)
• FIRST FLOOR: EX HEALTH CARE OCCUPANCY (UNCHANGED) EX HEALTH CARE OCCUPANCY (UNCHANGED)
• BASEMENT: EX BUSINESS (UNCHANGED) EX BUSINESS (UNCHANGED)
BUILDING AREA:
NS BUILDING WEST BUILDING
• SECOND FLOOR: 17,386 SF 12,846 SF
• FIRST FLOOR: 17,386 SF 12,846 SF
• BASEMENT: 17,386 SF 12,636 SF
• TOTAL 52,158 SF 38,328 SF
TYPES OF CONSTRUCTION:
• NS BUILDING TYPE: II (222) (UNCHANGED) (NFPA - 19.1.6.1)
• WEST BUILDING TYPE: II (111) (UNCHANGED) (NFPA - 19.1.6.1)
AUTOMATIC SPRINKLER SYSTEM:
• YES, EXISTING BUILDING FULLY SPRINKLED, RENOVATION TO REWORK EXISTING SYSTEM FOR PLAN CHANGES.
FIRE ALARM SYSTEM AND SMOKE DETECTION:
• YES, RENOVATION TO TIE INTO EXISTING FIRE ALARM SYSTEM
EGRESS REQUIREMENTS:
• NO CHANGES OR RESTRICTIONS TO EXISTING EXIT ACCESS COMPONENTS
• NO CHANGES TO EXISTING TRAVEL DISTANCES
OCCUPANCY LOAD: (NFPA 7.3.1.2)
• ASSEMBLY - LESS CONCENTRATED 15 SQ FT / PERSON NET
• HEALTH CARE - SLEEPING DEPARTMENTS 120 SQ FT / PERSON GROSS
• STORAGE 500 SQ FT / PERSON GROSS
• BUSINESS AREAS 150 SQ FT / PERSON GROSS
• BUSINESS AREAS - CONCENTRATED 50 SQ FT / PERSON GROSS
OCCUPANCY LOAD SUMMARY:
WEST BUILDING NS BUILDING
• BASEMENT
• STORAGE:........................................24 OCCUPANTS UNCHANGED
• 1ST FLOOR
• ASSEMBLY:......................................72 OCCUPANTS UNCHANGED
• BUSINESS:.......................................13 OCCUPANTS UNCHANGED
• BUSINESS
CONCENTRATED:............................6 OCCUPANTS UNCHANGED
• HEALTHCARE
SLEEPING DEPARTMENTS:..........70 OCCUPANTS UNCHANGED
• STORAGE:.........................................1 OCCUPANTS UNCHANGED
• 2ND FLOOR
• ASSEMBLY:.....................................62 OCCUPANTS UNCHANGED
• BUSINESS:......................................14 OCCUPANTS UNCHANGED
• BUSINESS
CONCENTRATED:............................5 OCCUPANTS UNCHANGED
• HEALTHCARE
SLEEPING DEPARTMENTS:..........70 OCCUPANTS UNCHANGED
• STORAGE:..........................................1 OCCUPANTS UNCHANGED
• TOTAL..................................................338 OCCUPANTS UNCHANGED
HAZARDOUS AREA PROTECTION (NFPA 18.2.3.1)
• SOILED LINEN > 64 GAL: 1HR
• STORAGE ROOMS > 50 SQFT AND < 100 SQFT: SMOKE PARTITION AND DOOR- CLOSING DEVICES REQUIRED
SUBDIVISION OF BUILDING SPACES (NFPA 18)
• NUMBER OF SMOKE COMPARTMENTS 2 REQUIRED
• MAX. SIZE OF SMOKE COMPARTMENTS 22.500 SQFT
• TRAVEL DISTANCE TO SMOKE BARRIER 200 FT
• MEANS OF EGRESS (DOORS) = 0.2"/OCCUPANCY NFPA 7.3.3.1
• DEAD END CORRIDOR = 30' MAX NFPA 18.2.5.2
• TRAVEL DISTANCE BETWEEN EXISTING = 200' MAX NFPA 18.2.5.7.2
ASSEMBLY - LESS CONCENTRATED
BUSINESS AREA
BUSINESS AREA - CONCENTRATED
HEALTH CARE - SLEEPING DEPARTMENTS
STORAGE
OCCUPANCY COUNT
(TOTAL IS OCCUPANCY TYPE FOR ENTIRE FLOOR)
X
3'
-6
'-5
81'-3" 95'-0"
X X
F.E.
F.E. F.E.
X
Z O
N E
2"
Z O
N E
1"
X
47'-6"
'-6
95'-7"
'-4
X
F.E.
F.E.
X
ZONE "1"
ZONE "2"
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C :\R ev it\
\1
4_
A _m ic he lle .b ur ri.
rv t
5/
/2
:2 0:
A
M
39-G101
LIFE SAFETY PLANS RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
1/16" = 1'-0"
LIFE SAFETY - FIRST FLOOR PLAN
1/16" = 1'-0"
LIFE SAFETY - SECOND FLOOR PLAN
1/16" = 1'-0"
LIFE SAFETY - BASEMENT FLOOR PLAN
Revisions: Date:
SCHEMATIC DESIGN - 35% 11/25/2019
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
95% CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 05/20/2021
DN
DN
3.7
KA B C D E G H IA.5 A.9 E.3 E.7 J.1 J.5
2.1
1.7
1.8
0 .8
F
DAY ROOM
B218
MEDS
B241
ELEVATOR
TREATMENT
B206
OFFICE
B208
OFFICE
B212
GROUP ROOM
B214
OFFICE
B207
OFFICE
B209
CORRIDOR
BC-23
PRIVATE
B230
PRIVATE
B228
SEMI
B223
SEMI
B225
SEMI
B227
S. TOILET
B221
QUIET
B222
MEDICAL
BEDROOM
B226
ANTE ROOM
B224
PRIVATE
B243
PRIVATE
B245
PRIVATE
B249
PRIVATE
B247
SEMI
B242
SEMI
B244
SEMI
B246
HSK
B240STORAGE
B251
STAIR
STAIR
SOILED UTILITY
B253
SOILED LINEN
B202 STAFF LOCKER
RM / LOUNGE
B201
CLEAN LINEN
B205
HSK EQUIP.
B204
BATHROOM
B246A
BATHROOM
B244A
BATHROOM
B242A
BATHROOM
B247A
BATHROOM
B243A
BATHROOM
B245A
BATHROOM
B223A
BATHROOM
B224A
BATHROOM
B225A
BATHROOM
B227A
BATHROOM
B230A
CORRIDOR
BC-22
ELECTRICAL
B255
ELECTRICAL
B236
CORRIDOR
BC-23
CORRIDOR
C-24
CORRIDOR
C-30
CORRIDOR
BC-21
STORAGE
B213A
STORAGE
B218A
CORRIDOR
BC-27.2
CORRIDOR
BC-24
CORRIDOR
BC-25.2
DAY ROOM
NOURISHMENT
232E
MED ROOM
207A
STAFF ROOM
NURSE
STATION
C23A
CLEAN UTILITY
206B
LAUNDRY
206A
SOILED UTILITY
PHYSICIAN
PHYSICIAN
ASST.
OFFICE
NURSING 2
BED
NURSING 2
BED
NURSING 2
BED
PHYSICIAN
ASSISTANT
NURSING 1
BED
NURSING 1
BED
NURSING 1
BED
NURSING 1
BED
LAUNDRY
SOILED UTILITY
247A
STAFF ROOM
243NURSE
STATION
C28A
MED ROOM
243A
NOURISHMENT
245E
DAY ROOM
CORRIDOR
BC-27.1
CORRIDOR
BC-25.1
39-A130
2 SIM
39-A130
STAFF TOILET
245D
SECLUSION
STAFF TOILET
208D
SECLUSION
E X
IS
T
IN
G R
A M
P
E X
IS
T
IN
G R
A M
P
E X
IS
T
IN
G R
A M
P
CORRIDOR
BC-22.2
148 SF
NOURISH
B220
CORRIDOR
C22
CORRIDOR
C23
CORRIDOR
C21
CORRIDOR
C28
STORAGE
B234
LAUNDRY
B232
SIM
NURSE
STATION
B213
NURSE OFFICE
B211
OFFICE
B210
CORRIDOR
BC-26
E X
IS
T
IN
G R
A M
P
E X
IS
T
IN
G R
A M
P
GENERAL ABATEMENT NOTES:
1. ALL ENVIRONMENTAL ABATEMENT SHALL BE CONDUCTED IN ACCORDANCE
WITH REQUIRED VA TECHNICAL SPECIFICATIONS AND ALL APPLICABLE
FEDERAL, STATE, AND LOCAL REGULATIONS IN EFFECT AT THE TIME THE
WORK IS DONE.
2. COORDINATE ALL ASBESTOS ABATEMENT WORK WITH THE COR.
3. ASBESTOS- CONTAINING MATERIALS (ACM) MAY BE PRESENT IN PREVIOUSLY
INACCESSIBLE SPACES. ANY DISTURBANCE, REMOVAL, OR DEMOLITION OF
ACM SHALL BE CONDUCTED IN ACCORDANCE WITH APPLICABLE VA
SPECIFICATIONS, AND ALL LOCAL, STATE, AND FEDERAL REGULATIONS. ANY
DISTURBANCE OF ACM SHALL BE PERFORMED BY TRAINED, MEDICALLY
QUALIFIED, AND LICENSED PERSONNEL WHO WILL FOLLOW THE APPROVED
WRITTEN SITE SPECIFIC HEALTH AND SAFETY PLAN AS COORDINATED WITH
THE VA COR.
4. IN THE EVENT THAT ADDITIONAL QUANTITIES OF SUSPECT ASBESTOS -
CONTAINING MATERIALS (ACM) OR OTHER SUSPECT HAZARDOUS MATERIALS
NOT PREVIOUSLY IDENTIFIED ARE DISCOVERED THE CONTRACTOR SHALL
STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
5. ALL PAINT IS ASSUMED TO BE LEAD BASE PAINT (LBP). ALL LOOSE AND
FLAKING PAINT MUST BE REMOVED PRIOR TO REMOVAL AND DISPOSAL/
RECYCLING. HOT WORK ON SURFACES COVERED WITH LBP IS PROHIBITED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING ENVIRONMENTAL
SAFETY AND HEALTH PRECAUTIONS DURING THE DEMOLITION ACTIVITIES
FOR SURFACES COVERED WITH LBP INCLUDING WELDING, CUTTING, AND
DEMOLITION. THE REQUIREMENTS FOR THE HANDLING, USE, REMOVAL, AND
DISPOSAL OF LBP SHALL BE CONDUCTED IN ACCORDANCE WITH APPLICABLE
VA SPECIFICATION AND ALL LOCAL STATE AND FEDERAL REGULATIONS.
6. REMOVE ALL OZONE DEPLETING REFRIGERANTS IN ACCORDANCE WITH
APPLICABLE TECHNICAL SPECIFICATIONS.
7. REFER TO LIFE SAFETY PLANS FOR FIRE CODE RATINGS.
ASBESTOS LEGEND
AREA OF POSSIBLE DISTURBANCE
ASBESTOS CEILING TILE MASTIC
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C :\R ev it\
\1
4_
A _m ic he lle .b ur ri.
rv t
5/
/2
:2 0:
A
M
39-G111
PARTIAL SECOND FLOOR
ASBESTOS REMOVAL PLAN
RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
1/8" = 1'-0"
PARTIAL SECOND FLOOR ASBESTOS REMOVAL PLAN
NOT TO SCALE
KEY PLAN SECOND FLOOR
Revisions: Date:
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
UP DN DN UP
DAY ROOM
MEDS
ELEVATOR
TREATMENT
OFFICE
OFFICE
GROUP
ROOM
OFFICE
OFFICE
CORRIDOR
PRIVATEPRIVATE
SEMI SEMI SEMI
S. TOILET
QUIET
MEDICAL
BEDROOM
ANTE ROOM
NOURISH
PRIVATEPRIVATEPRIVATE PRIVATE
SEMISEMISEMI
HSK
STORAGE
STAIRSTAIR
SOILED
UTILITY
SOILED
LINEN
STAFF
LOCKER RM
/ LOUNGE
CLEAN
LINEN
HSK EQUIP.
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
CORRIDOR
ELECTRICAL ELECTRICAL
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
DAY ROOM
NOURISHMENT
MED ROOM
STAFF
ROOM
NURSE
STATION
CLEAN
UTILITY
LAUNDRY SOILED
UTILITY
PHYSICIAN
PHYSICIAN
ASST.
OFFICE
NURSING 2
BED
NURSING 2
BED
NURSING 2
BED
PHYSICIAN
ASSISTANT
NURSING 1
BED
NURSING 1
BED
NURSING 1
BED
NURSING 1
BED
LAUNDRY
SOILED
UTILITY
STAFF
ROOM
NURSE
STATION
MED ROOM
NOURISHMENT
DAY ROOM
CORRIDOR CORRIDOR
STAFF
TOILET
SECLUSION
STAFF
TOILET SECLUSION
CORRIDOR
PHASE 1 - SEAL EXISTING DOOR TO
PROVIDE TEMPORARY INFECTION
CONTROL MEASURES. COMPLY
WITH SPECIFICATIONS REGARDING
INFECTION CONTROL
MAJORITY OF THE WORK TO BE
COMPLETED IN PHASE 1, WORK
RELATED TO THE EAST WALL AND
FINISHES TO BE COMPLETED IN
PHASE 2
PHASE 2 - SEAL NEWLY INSTALLED
DOOR TO PROVIDE TEMPORARY
INFECTION CONTROL MEASURES.
COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL
PHASE 2 - PROVIDE 1HR RATED TEMPORARY
CONSTRUCTION WALL FOR INFECTION
CONTROL, COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL, SEE
PARTITION TYPES
PHASE 3 - PROVIDE 1HR RATED TEMPORARY
CONSTRUCTION WALL FOR INFECTION
CONTROL, COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL, SEE
PARTITION TYPES
PHASE 1 - SEAL EXISTING DOOR
TO PROVIDE TEMPORARY
INFECTION CONTROL MEASURES.
COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL
MAJORITY OF THE WORK TO BE
COMPLETED IN PHASE 1, WORK
RELATED TO THE EAST WALL AND
FINISHES TO BE COMPLETED IN
PHASE 2
PHASE 2 - SEAL NEWLY INSTALLED
DOOR TO PROVIDE TEMPORARY
INFECTION CONTROL MEASURES.
COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL
NURSE
STATION
NURSE
OFFICE
OFFICE
STORAGE
STORAGE
LAUNDRY
PROVIDE WALKOFF MATS
DURING CONSTRUCTION
PROVIDE WALKOFF MATS
DURING CONSTRUCTION
DAY ROOM
MEDS
STORAGE
ELEVATOR
TREATMENT
OFFICE
OFFICE
OFFICE
GROUP
ROOM
OFFICE
OFFICE
STAFF
OFFICE
NURSE
STATION
PRIVATEPRIVATE
SEMI SEMI
S. TOILET
RESTRAINT ISOL.
ANTE ROOM
NOURISHPRIVATEPRIVATEPRIVATE PRIVATE
SEMISEMISEMI
HSK
LAUNDRY
STORAGE
STAIR
LAUNDRY
SOILED
LINEN
STAFF
LOCKER RM
/ LOUNGE
CLEAN
LINEN
HSK EQUIP.
BATHROOM
BATHROOM
BATHROOM BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM BATHROOM
BATHROOM
CORRIDOR
STAIR
ELECTRICAL
ELECTRICAL
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
GROUP
ROOM
SEMI
STORAGE
STORAGE
CORRIDOR
CORRIDORCORRIDOR
DAY ROOM
NOURISHMENT
MED ROOM
STAFF
NURSE
STATION
CLEAN
UTILITY
LAUNDRY
NURSING 2
BED
NURSING 2
BED
NURSING 2
BED
FEMALE
TREATMENT
NURSING 2
BED
EXIT
VESTIBULE
UNIT
CORR./CHARGE
NURSE
AMM/SPD
STORAGE
NURSING 2
BED
NURSING 1
BED
NURSING 3
BED
CLEAN
UTILITY
LAUNDRY
STAFF
ROOM
NURSE
STATION
DAY ROOM
MED ROOM
NOURISHMENT
CORRIDOR
SECLUSION
TOILET
TOILET SECLUSION CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PHASE 4 - PROVIDE 1HR RATED TEMPORARY
CONSTRUCTION WALL FOR INFECTION
CONTROL, COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL, SEE
PARTITION TYPES
PHASE 3 - PROVIDE 1HR RATED TEMPORARY
CONSTRUCTION WALL FOR INFECTION
CONTROL, COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL, SEE
PARTITION TYPES
PHASE 1 - PROVIDE 1HR RATED TEMPORARY
CONSTRUCTION WALL FOR INFECTION
CONTROL, COMPLY WITH SPECIFICATIONS
REGARDING INFECTION CONTROL, SEE
PARTITION TYPES
PROVIDE WALKOFF MATS
DURING CONSTRUCTION
PROVIDE WALKOFF MATS
DURING CONSTRUCTION
PROVIDE WALKOFF MATS
DURING CONSTRUCTION
SEAL EXISTING DOOR TO
PROVIDE TEMPORARY
INFECTION CONTROL
MEASURES. COMPLY WITH
SPECIFICATIONS REGARDING
INFECTION CONTROL.
SEAL EXISTING DOOR TO
PROVIDE TEMPORARY
INFECTION CONTROL
MEASURES. COMPLY WITH
SPECIFICATIONS REGARDING
INFECTION CONTROL.
AREA OF
WORK
PHASE 1
PHASING LEGEND
PHASE 2
PHASE 3
PHASE 4
1. VA PREFERS THE USE OF HARD WALL
PARTITIONS OVER THE USE OF PLASTIC
SHEETING FOR SEPARATION BETWEEN
CONSTRUCTION AND EXISTING SPACES TO
REMAIN FUNCTIONING. CONTRACTOR TO
SUBMIT PROPOSED PLAN FOR TEMPORARY
CONSTRUCTION PARTITION LOCATIONS FOR
COR APPROVAL. TEMPORARY PARTITION
LOCATIONS SHOWN HERE ARE RECOMMENDED
LOCATIONS BASED ON WORK NEEDING TO BE
COMPLETED, BUT DOES NOT CONSTITUTE FINAL
LOCATIONS OR QUANITITIES.
2. REFER TO LIFE SAFETY PLANS FOR FIRE CODE
RATINGS.
GENERAL NOTES
PHASE 1&2
INFECTION CONTROL RISK MITIGATION REQUIREMENTS MATRIX
TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE
Inspection and Non-Invasive Activities Includes, but is not limited to:
- Removal of ceiling tiles for visual inspection limited to 20 Ln Ft tile per 160 sq. ft. space.
- Painting (but not sanding).
- Wallcovering, electrical trim work, minor plumbing, and activities which no not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
- Patching walls - not exceeding 8 sq. ft.
TYPE
A
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
- Installation of telephone and computer cabling.
- Access to chase spaces.
- Cutting of walls or ceiling where dust migration can be controlled.
- Patching walls - exceeding 8 sq. ft.
TYPE
B
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components and assemblies or new construction Includes, but is not limited to:
- Sanding of walls for painting or wall covering exceeding 32 sq. ft., or vacant areas.
- Removal of floor coverings, ceiling tiles and casework.
- New wall construction.
- Uncontained duct, HVAC or electrical work above ceilings.
- Major cabling activities.
- Any other project where high levels or dust are generated.
TYPE
C
Major demolition and construction projects Includes, but is not limited to:
- Activities that require consecutive work shifts.
- Requires heavy demolition or removal of a complete cabling system.
- New Construction.
TYPE
D
PATIENT RISK GROUP TABLE
- ADMINISTRATIVE OFFICES
- PUBLIC CORRIDORS
- ELEVATORS
- DAY ROOMS
- CANTEEN RETAIL STORE
- VACANT WARDS OR VACANT
ICU'S ECT.
GROUP 1
LOW RISK
- OUTPATIENT, URGENT CARE &
PRIMARY CARE CLINICS
- LABORATORY
- CARDIOLOGY
- ECHOCARDIOGRAPHY
- ENDOSCOPY
- FOOD SERVICES
- INTERIM CARE & MEDICAL
UNITS
- NUCLEAR MEDICINE
- PHARMACY
- PHYSICAL THERAPY
- RADIOLOGY & NUCLEAR
MEDICINE
- RESPIRATORY THERAPY
GROUP 2
MEDIUM RISK
- CCU
- EMERGENCY ROOM
- LABORATORY
- OUTPATIENT SURGERY
- PHARMACY
- POST ANESTHESIA CARE UNIT
- SURGICAL UNITS
GROUP 3
HIGH RISK
- ANY AREA CARING FOR
IMMUNICOMPROMISED
PATIENTS
- SPD STORAGE / STERILIZATION
- INTENSIVE CARE UNITS
- TB NEGATIVE PRESSURE
ISOLATION ROOMS
- OPERATING ROOM
GROUP 4
HIGHEST RISK
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA CLASS DESIGNATION
DURING CONSTRUCTION PROJECT
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTIONS.
C L A
S S
I
UPON COMPLETION OF PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
C L
A S
S
II
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WIPE WORK SURFACES WITH DISINFECTANT, WET MOP AND / OR VACUUM WITH HEPA VACUUM BEFORE LEAVING
WORK AREA.
4. REMOVE ISOLATION OF HVAC.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
C L
A S
S I
II
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE ENVIRONMENTAL HEALTH AND SAFETY AND INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL
SANITATION SECTION.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
5. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED
EACH TIME THEY LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
C L A
S S
I V
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY
ENVIRONMENTAL MANAGEMENT.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
3. WET MOP AREA WITH DISINFECTANT.
4. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
6. COVER TRANSPORT RECEPTACLES OR CARTS, TAPE COVERING.
7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP
TYPE OF CONSTRUCTION / PROJECT
TYPE A
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
TYPE B TYPE C TYPE D
I II II III / IV
I II II IV
I II III / IV IV
II III / IV III / IV IV
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY
AND RISK LEVEL INDICATE THAT CLASS III OR IV CONTROL PROCEDURES ARE NECESSARY
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C :\R ev it\
\1
4_
A _m ic he lle .b ur ri.
rv t
5/
/2
:2 0:
A
M
39-G121
INFECTION CONTROL RISK
ASSESSMENT & PHASING PLANS
RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
1/16" = 1'-0"
SECOND FLOOR NEW CONSTRUCTION
NOT TO SCALE
KEY PLAN SECOND FLOOR
1/16" = 1'-0"
FIRST FLOOR NEW CONSTRUCTION
NOT TO SCALE
KEY PLAN FIRST FLOOR
Revisions: Date:
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
UP DN DN UP
DEDUCTIVE ALTERNATE 1DEDUCTIVE ALTERNATE 1
DAY ROOM
MEDS
ELEVATOR
TREATMENT
OFFICE
OFFICE
GROUP
ROOM
OFFICE
OFFICE
CORRIDOR
PRIVATEPRIVATE
SEMI SEMI SEMI
S. TOILET
QUIET
MEDICAL
BEDROOM
ANTE ROOM
NOURISHPRIVATEPRIVATEPRIVATE PRIVATE
SEMISEMISEMI
HSK
STORAGE
STAIRSTAIR
SOILED
UTILITY
SOILED
LINEN
STAFF
LOCKER RM
/ LOUNGE
CLEAN
LINEN
HSK EQUIP.
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
CORRIDOR
ELECTRICAL ELECTRICAL
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
DAY ROOM
NOURISHMENT
MED ROOM
STAFF
ROOM
NURSE
STATION
CLEAN
UTILITY
LAUNDRY SOILED
UTILITY
PHYSICIAN
PHYSICIAN
ASST.
OFFICE
NURSING 2
BED
NURSING 2
BED
NURSING 2
BED
PHYSICIAN
ASSISTANT
NURSING 1
BED
NURSING 1
BED
NURSING 1
BED
NURSING 1
BED
LAUNDRY
SOILED
UTILITY
STAFF
ROOM
NURSE
STATION
MED ROOM
NOURISHMENT
DAY ROOM
CORRIDOR CORRIDOR
STAFF
TOILET
SECLUSION
STAFF
TOILET SECLUSION
CORRIDOR
OFFICE
NURSE
OFFICE
NURSE
STATION
STORAGE
STORAGE
LAUNDRY
CORRIDOR
DEDUCTIVE ALTERNATE 2DEDUCTIVE ALTERNATE 2
DEDUCTIVE ALTERNATE 3
DAY ROOM
MEDS
STORAGE
ELEVATOR
TREATMENT
OFFICE
OFFICE
OFFICE
GROUP
ROOM
OFFICE
OFFICE
STAFF
OFFICE
NURSE
STATION
PRIVATEPRIVATE
SEMI SEMI
S. TOILET
RESTRAINT ISOL.
ANTE ROOM
NOURISHPRIVATEPRIVATEPRIVATE PRIVATE
SEMISEMISEMI
HSK
LAUNDRY
STORAGE
STAIR
LAUNDRY
SOILED
LINEN
STAFF
LOCKER RM
/ LOUNGE
CLEAN
LINEN
HSK EQUIP.
BATHROOM
BATHROOM
BATHROOM BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM BATHROOM
BATHROOM
CORRIDOR
STAIR
ELECTRICAL
ELECTRICAL
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
GROUP
ROOM
SEMI
STORAGE
STORAGE
CORRIDOR
CORRIDORCORRIDOR
DAY ROOM
NOURISHMENT
MED ROOM
STAFF
NURSE
STATION
CLEAN
UTILITY
LAUNDRY
NURSING 2
BED
NURSING 2
BED
NURSING 2
BED
FEMALE
TREATMENT
NURSING 2
BED
EXIT
VESTIBULE
UNIT
CORR./CHARGE
NURSE
AMM/SPD
STORAGE
NURSING 2
BED
NURSING 1
BED
NURSING 3
BED
CLEAN
UTILITY
LAUNDRY
STAFF
ROOM
NURSE
STATION
DAY ROOM
MED ROOM
NOURISHMENT
CORRIDOR
SECLUSION TOILETTOILET SECLUSION
CORRIDOR
CORRIDOR
• DEDUCTIVE ALTERNATE 1 - NURSE STATION BUILDING 39-2 NORTH AND BUILDING 39-2 SOUTH
• DEDUCTIVE ALTERNATE 2 - EVERYTHING IN DEDUCTIVE ALTERNATE 1 PLUS NURSE STATION
BUILDING 39-1 NORTH AND BUILDING 39-1 SOUTH
• DEDUCTIVE ALTERNATE 3 - EVERYTHING IN DEDUCTIVE ALTERNATE 1 & 2 PLUS NURSE
STATION BUILDING 39-1 WEST
DEDUCTIVE ALTERNATE LEGEND:
AREA OF
WORK
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C :\R ev it\
\1
4_
A _m ic he lle .b ur ri.
rv t
5/
/2
:2 0:
A
M
39-G131
DEDUCTIVE ALTERNATES RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
1/16" = 1'-0"
DEDUCTIVE ALTERNATES SECOND FLOOR PLAN
1/16" = 1'-0"
DEDUCTIVE ALTERNATES FIRST FLOOR PLAN
NOT TO SCALE
KEY PLAN SECOND FLOOR
NOT TO SCALE
KEY PLAN FIRST FLOOR
Revisions: Date:
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
39-L101
LANDSCAPE PLAN
A
FULLY SPRINKLED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH JMM
Revisions: Date:
100% BID DOCUMENTS
NO
T
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222 architecture · engineering
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
LANDSCAPE NOTES
LANDSCAPE LEGEND
LANDSCAPE KEY
SCHEMATIC DESIGN - 35% 11/25/2019
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
PAVING PATTERN AND PLANTER LAYOUT
PLANTING PLAN
PLANTER PLANT SCHEDULE
Feet 0 5 10
Feet 0 2 4
ARCANA CUT EDGE PAVER BY UNILOCK
(TYP, CUT TO FIT)
24"X24" ARCARNA PAVER BY UNILOCK (TYP)
CONTRACTOR TO FIELD VERIFY
PROPOSED POC. VERIFY CAPACITY
FOR ADDITIONAL ZONES IN EXISTING
CONTROLLER AND ADEQUATE
PRESSURE IN EXISTING IRRIGATION
SYSTEM. CONNECTION SHALL BE
MADE TO MINIMIZE VISIBILITY AND
DISRUPTION OF EXISTING
STRUCTURES AND LANDSCAPING.
95% CONSTRUCTION DOCUMENTS 04/12/2021
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
39-L102
LANDSCAPE DETAILS
A
FULLY SPRINKLED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
KJH EEC
Revisions: Date: NO
T
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222 architecture · engineering
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
SCHEMATIC DESIGN - 35% 11/25/2019
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
PRUNE OUT ANY DEAD OR BROKEN
BRANCHES. CUT ANY GIRDLING ROOTS
OFF CLOSE TO THE CROWN. PRY LONG
ROOTS OUT TO DIRECT INTO NEW SOIL
PLACE SHRUB OR PERENNIAL SO CROWN IS
AT SOIL LEVEL
FILL PLANTER WITH AMENDED SOIL MIX
ACCORDING TO NOTE 4 SHEET L01. CONSTRUCT
RING AROUND PLANTS TO FORM SAUCER
NOTES:
1. REFER TO NOTE 4 SHEET L01 FOR PLANTER MIX.
2. CONTRACTOR TO WATER THOROUGHLY AFTER PLANTING
3. INSTALLATION TO BE IN ACCORDANCE WITH PLANTING SPECIFICATIONS
2 NURSERY CONTAINER (TYP)
SECTION
PLANTER
NOTES:
1. CONTRACTOR TO INSTALL PAVER SYSTEM IN ACCORDANCE WITH
MANUFACTURE'S SPECIFICATIONS
2. CONTRACTOR TO COORDINATE WITH INSTALLATION OF IRRIGATION
SYSTEM TO FOR ACCESS TO LANDSCAPE PLANTERS TO BE PLACED
FOLLOWING PAVER INSTALLATION.
NOTES:
1. CONTRACTOR TO INSTALL PLANTERS IN ACCORDANCE WITH
MANUFACTURE'S SPECIFICATIONS.
2. CONTRACTOR TO COORDINATE WITH INSTALLATION OF PEDESTAL
PAVER SYSTEM FOR PLACEMENT FOLLOWING PAVER INSTALLATION.
3. CONTRACTOR TO COORDINATE PLANTER PLACEMENT WITH DRIP
IRRIGATION SYSTEM.
UNILOCK ARCANA PAVERS AND PEDESTAL PAVER SYSTEM
05/20/2021
100% BID DOCUMENTS
95% CONSTRUCTION DOCUMENTS 04/12/2021
MOUNTING HEIGHT
COORDINATION
ARCHITECTURAL,
MECHANICAL &
ELECTRICAL TRADES
SHALL COORDINATE
LOCATIONS OF WALL
MOUNTED ITEMS TO ALIGN
EITHER VERTICALLY OR
HORIZONTALLY.
FINISH FLOOR LINE
DRAWING REFERENCE SYMBOLS RECOMMENDED MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED)
MAX
REACH
DEPTH
MAX
REACH
HEIGHT
0.5"
48"
2"
46"
5"
42"
6"
40"
9"
36"
11"
34"
GENERAL MAXIMUM REACH DEPTH AND HEIGHT
FOR HAND DRYERS / TOWEL DISPENSERS
MAX REACH DEPTH
F O
R R
E A
C H
D E
P T
H M
A X
H E
IG
H
T
M
IR
R O
R O
R
M
IR
R O
R
S H
E
LF
(M
A X
T O
W E
L D
IS
P
E N
S E
M U
LT
I- P
U R
P O
S
U
N
IT
T O
W E
L D
IS
P
E N
S
E C
E P
T A
C
LE
W A
S T
C
E P
T A
C
LE
C O
A T H
O O
K S
S A
N
IT
A R
Y N
A P
K
IN
V
N
D O
R
S O
A P
D
IS
P
E N
S E
R
M
A X
M O
P S
T R
IP
H E
LF
12"
A D
A
N D
A
E
LF
C
A T R
O D
M A
X
24"
BOTTOM OF
OUTLET
BOTTOM OF
LIGHT FIXTURE
M
A X
24" MIN
36" MAX
M
IN
M
IN
24" MIN
42" MAX
M
A X
36" MAX
M
IN
24" MIN
42" MAX
/2
M
IN
P R
O T R
U D
G
IL
E
T P
A P
P
E N
S
LO
A T
IO
N
R E
C E
S S
IL
E
T P
A P
P
E N
S
A T
IO
N
P R
O T R
U D
IL
E
T P
A P
P
E N
S
A T
IO
N
M
IN
7"-9"
M
A X
S A
N
IT
A
Y
P K
P O
S A
L
22"
/2
M
IN
P R
O T R
U D
IL
E
T P
A P
P
E N
S
A T
IO
N
E
LE
V A
T O
R W
LL
B
T
T O
N S
(M
IN
" S E
E E
L E
C T
E
LE
C T R
IC
N E
L C
A B
IN
E
T
P O
W E
R P
A N
E L
E
LE
C T R
IC
T E
LE
P
H O
N E
O R
T
LE
T
S W
IT
C
H
P U
S H
B U
T T O
N
F
IR
E A
LA
R
M B
O X
T H
E R
M O
S T A
T
C A
R D
R E
A D
E R
M E
C H
A N
IC
A
L P
A N
E
LS
I
F
IS
H
E D
S P
A C
E S
S E
LE
C
T O
R S
W
IT
C H
R
S
S W
IT
C
H O
R W
LL
T
LE
T
A B
O
B
IN
E T
SS
SEE PLAN
12" 12"
H A
N D
R A
IL
R A
M P
T O
C A
B
IN
E T
H A
N D
L E
F
IR
E E
X T
IN
G
U
IS
H E
R
F
IR
E E
X T
IN
G U
IS
H
B
IN
E
T F
IR
E H
O S
E
O R
C O
M B
IN
A
T
IO
B
IN
E T
54" MIN
GRAB BAR
GRAB BAR
'-8
M
A X
6" MAX 36"
(MIN)
18"
GRAB BAR
40"
13" MAX
42" 42"
W A
T E
R C
LO
S
E T
W A
T E
R C
LO
S
E T
(M A
X
(M
A X
B A
R R
IE
E E
U R
IN
A
L
S T A
N D
A R
IN
A L
GRAB BAR
18"
T R
A N
S F E
R
T Y
P E
S H
O W
E R
FOLDING
SHOWER SEAT
R O
LL
-I N
-T Y
O
W E
R
M
IN
T R
A N
S F E
R
T Y
P E
S H
O W
E R
(M
IN
(M A
X
T O
P S
P O
U T
M A
X S
IN
K
D E
P T
H
11"
(MIN)
17"
3" (MAX)
WALL
SPACE
AVAILABLE
NOTE:
WATER SUPPLY & DRAIN
PIPES BELOW LAVATORIES
AND SINKS MUST BE
INSULATED OR OTHERWISE
CONFIGURED TO PROTECT
AGAINST CONTACT.
E W
C
IN
K
U N
T A
IN
W A
LL
H
U N
G L
A V
B A
R R
IE
E E
L A
U
N T E
R
M
IN
MAX
4"
6" MAX
ALIGN WITH EDGE OF SEAT
6'
0"
ENLARGED PLAN OR DETAIL
WALL SECTION
X-###
X
X
X-###
BUILDING SECTION
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
DEMO KEYNOTE##
REVISION CLOUD AND TAG
VIEW TITLE & REFERENCE
EXISTING COLUMN LINE
NEW COLUMN LINE
DETAIL
LEVEL OR ELEVATION
XX
DEMARCATION LINE
X-###
X-###
X-###
X-###
X-###
X-###
X## EQUIPMENT TAG
WALL TAG
###.# DOOR TAG
ROOM NAME
ROOM TAG
WINDOW TAG
X#
## ARCHITECTURAL KEYNOTE
#' - #" CEILING SPOT ELEVATION
XX# FURNITURE TAG
FINISH TAG
SPECIALITY EQUIPMENT TAG
XX-#
XX- #
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C :\R ev it\
\1
4_
A _m ic he lle .b ur ri.
rv t
5/
/2
:2 5:
A
M
39-A001
ARCHITECTURAL LEGENDS,
SYMBOLS, AND ABBREVIATIONS
RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
ABBREVIATIONS
ABBREV. FULL TEXT
SUSP SUSPENDED
SYM SUSPENSION SYMMETRICAL
T
T TREAD
T&G TONGUE AND GROOVE
T.O.C. OR T/C TOP OF CONCRETE
T.O.F. OR T/F TOP OF FOOTING
T.O.M. OR T/M TOP OF MASONRY
T.O.P. OR T/P TOP OF PAVEMENT
T.O.S. OR T/S TOP OF STEEL
T.O.W. OR T/W TOP OF WALL
T/ TOP OF
TB TRUSS BEARING
TG TEMPERED GLASS
THK THICK
THRESH THRESHOLD
TLT TOILET
TP TOILET PARTITION
TR TRACK
TYP TYPICAL
TYP TYPICAL
U
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
V
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCO WALL CLEAN OUT
WD WOOD
WP WATERPROOFING
WP WORKPOINT
WP WALL PROTECTION
WS WINDOW SHADE
WT WEIGHT
ABBREVIATIONS
ABBREV. FULL TEXT
S
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKETS
SACS SEAMLESS ACOUSTICAL CEILING
SYSTEM
SC SOLID CORE
SCH SCHEDULE
SCONC SEALED CONCRETE
SCWD SOLID CORE WOOD
SECT SECTION
SER.RECPT SERVICE RECEPTOR
SH SHELF
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SLR CONCRETE SEALER
SLV SHORT LEG VERTICAL
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
SSM SOLID SURFACING MATERIAL
SSM SOLID SURFACE
STD STANDARD
STDW STANDARD WEIGHT (STEEL PIPE)
STL STEEL
STOR STORAGE
STRL STRUCTURAL
SUPP SUPPORT
ABBREVIATIONS
ABBREV. FULL TEXT
P
P PAINT
PART PARTITION
PB PARTICLE BOARD
PC PRECAST
PCS PIECES
PERM PERMANENT
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLY PLYWOOD
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
Q
QT QUARRY TILE
QTB QUARTZ TILE BASE
QTZ QUARTZ
R
R RISER
RA RETURN AIR
RB RUBBER BASE
RC ROOF CONDUCTOR
RD ROOF DRAIN
RD ROUND
RECVG RECEIVING
REF REFRIGERATOR
REINF REINFORCED
REQ'D REQUIRED
RF RESILIENT FLOORING
RH RIGHT HAND
RL ROOF LADDER
RM ROOM
RO ROUGH OPENING
RS ROOF SUMP
ABBREVIATIONS
ABBREV. FULL TEXT
M
MA MEDICAL AIR
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MBH THOUSAND BTU/HR
MC MEDICINE CABINET
MCA MINIMUM CIRCUIT AMPACITY
MCC MULTI-COLOR COATING
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMBWP MEMBRANE WATERPROOFING
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MFS MAXIMUM FUSE SIZE
MG MEDICAL GAS
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN. MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MM MISCELLANEOUS METALS
MO MASONRY OPENING
MOCP MAXIMUM OVERCRRENT PROTECTION
MPC MICHIGAN PLUMBING CODE
MR MANUFACTURER'S RECOMMENDATIONS
MT MARBLE TILE
MTD MOUNTED
MUL. MULLION
N
N NORTH
N.S. NEAR SIDE
NF NO FINISH
NIC NOT IN CONTRACT
NO NUMBER
NPSH NET POSITIVE SUCTION HEAD
NSNS NON SHRINK NON STAIN GROUT
NTS NOT TO SCALE
NTS NOT TO SCALE
O
O.C. OR OC ON CENTER
OBSGL OBSCURE GLASS
OD OUTSIDE DIAMETER
OHDR SECTIONAL OVERHEAD DOOR
OPNG OPENING
OPP OPPOSITE
ABBREVIATIONS
ABBREV. FULL TEXT
G
G.B. GRAB BAR, GRADE BEAM
G.O. GRILL OPENING
GA GAUGE
GALV GALVANIZED
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS
GND. GROUND
GR. GRADE
GRTG. GRATING
GSCFT GLAZED STRUCTURAL CLAY FACING TILE
GT GROUT
GYP. BD. GYPSUM BOARD
H
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD
HDPB HIGH DENSITY PARTICLEBOARD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HWD HARDWARE
I
I.D. OR ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IG INSULATING GLASS
IN INCHES
INCL INCLUDING, INCLUSIVE
INSUL INSULATION
INT INTERIOR
IPS INTERIOR PAINT SYSTEM
J
JAN JANITOR
JT JOINT
K kW KILOWATTS kWh KILOWATT HOURS
L
LAD LADDER
LAM LAMINATED
LAV LAVATORY
LF LINEAR FEET
LGTH LENGTH
LH LEFT HAND
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LO LOUVER OPENING
LP LIGHTING PANEL
LPG LIQUID PETROLEUM GAS
LPS LOW PRESSURE STEAM
LT LIGHT
LWT LEAVING WATER TEMPERATURE
ABBREVIATIONS
ABBREV. FULL TEXT
D
DEXS DOUBLE EXTRA STRONG (STEEL PIPE)
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DN DOWN
DO DOOR OPENING
DR DOOR
DS DOWN SPOUT
DT DRAIN TILE
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EIFS EXTERIOR INSULATION AND FINISH
SYSTEMS
EJ EXPANSION JOINT
EL ELEVATION
ELECT ELECTRICAL
ELEV ELEVATOR OR ELEVATION
ENCL ENCLOSURE
EP EPOXY PAINT
EPS EXTERIOR PAINT SYSTEM
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED STRUCTURE
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EX EXISTING
EXGR EXISTING GRADE
EXP EXPANSION
EXS EXTRA STRONG (STEEL PIPE)
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRIC/UPHOLSTERY
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR
FLL FLOOR LINE
FLUOR FLUORESCENT
FOC FACE OF COLUMN
FOCONC FACE OF CONCRETE
FRC FIBER REINFORCED CONCRETE
FRP FIELD REINFORCED PANEL
FRPFG FIREPROOFING
FS FULL SIZE
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FV FIELD VERIFY
ABBREVIATIONS
ABBREV. FULL TEXT
A
AB ANCHOR BOLT
ABI ADDITIVE BID ITEM
AC ACOUSTICAL
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
AP ACCESS DOORS
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AWP ACOUSTICAL WALL PANEL
B
B/ BOTTOM OF
BD BOARD
BF BARRIER FREE
BIT BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLKHD BULKHEAD
BOTT BOTTOM
BP BASE PLATE
BS BOTH SIDES
BUR BUILT UP ROOFING
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CG CORNER GUARD
CH CHANNEL
CHKDPL CHECKERED PLATE
CJ CONTROL JOINT
CL CENTERLINE
CL TO CL CENTERLINE TO CENTERLINE
CLG CEILING
CLK CAULKING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CASED OPENING OR CLEAN OUT
COL COLUMN
COMP COMPRESSIBLE
COMPO COMPOSITION
CONC CONCRETE
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET TILE
CTR COUNTER
CTSK COUNTERSINK
Revisions: Date:
SCHEMATIC DESIGN - 35% 11/25/2019
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
CEILING - SEE ROOM
FINISH SCHEDULE
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION
BATT INSULATION
IMPACT RESISTANT
GYPSUM BOARD
PARTITION TYPE 'S1R'
(1-HR RATED / 4" METAL STUDS / DESIGN UL-U419)
PARTITION TYPE 'S2R'
(2-HR RATED / 4" METAL STUDS / INSULATED / DESIGN UL-U419)
METAL STUD FIRESTOPPING
@ CEILING
FILL VOIDS W/ SAFING
INSULATION
UNDERSIDE OF METAL
DECK ABOVE
FIRESTOPPING & SEALANT
SYSTEM
GYP. BD. CLOSURE CUT
TO DECK PROFILE
2 1/2" DEEP SLOTTED
METAL DEFLECTION &
FIRESTOP TRACK
FASTENED TO DECK @
2'-0" O.C.
WALL BASE
(2) LAYERS 5/8" TYPE 'X'
GYP. BD. AS REQ'D FOR
2 HR. RATING
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
CEILING - SEE ROOM
FINISH SCHEDULE
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION
BATT INSULATION
IMPACT RESISTANT
GYPSUM BOARD
NOTE: EXTEND GYPSUM
BOARD AND FINISHES TO
UNDERSIDE OF DECK (DO
NOT SECURE GYP. BD TO
TRACK)
UNDERSIDE OF DECK ABOVE
PARTITION TYPE 'S1S'
(NON-RATED / 4" METAL STUDS / INSULATED - SMOKE PARTITION)
WALL BASE
METAL STUD @ CEILING
2 1/2" DEEP SLOTTED METAL
DEFLECTION TRACK FASTENED
TO DECK @ 2'-0" O.C.
CEILING - SEE ROOM
FINISH SCHEDULE
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION
BATT INSULATION
IMPACT RESISTANT
GYPSUM BOARD
UNDERSIDE OF
DECK ABOVE
PARTITION TYPE 'S1'
(NON-RATED / 4" METAL STUDS / INSULATED)
PARTITION TYPE 'S2'
(NON-RATED / 4" METAL STUDS / NON-INSULATED / GYP. BD.
ONE SIDE ONLY )
WALL BASE
T Y
P
6"METAL STUD @ CEILING
PARTITION TYPE 'S3'
(NON-RATED / 6" METAL STUDS / INSULATED)
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
CEILING - SEE ROOM
FINISH SCHEDULE
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION
BATT INSULATION, ONE
SIDE ONLY
IMPACT RESISTANT
GYPSUM BOARD
NOTE: EXTEND GYPSUM
BOARD AND FINISHES TO
UNDERSIDE OF DECK (DO
NOT SECURE GYP. BD TO
TRACK)
UNDERSIDE OF DECK ABOVE
PARTITION TYPE 'D1S'
(NON-RATED / 4" METAL STUDS / INSULATED - SMOKE PARTITION)
WALL BASE
PARTITION TYPE 'D2S'
(NON-RATED / 2 1/2" METAL STUDS / INSULATED - SMOKE PARTITION)
METAL STUD @ CEILING
SEE PLAN
VARIES
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
CEILING - SEE ROOM
FINISH SCHEDULE
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION
BATT INSULATION, ONE
SIDE ONLY
IMPACT RESISTANT
GYPSUM BOARD
NOTE: EXTEND GYPSUM
BOARD AND FINISHES TO
UNDERSIDE OF DECK (DO
NOT SECURE GYP. BD TO
TRACK)
UNDERSIDE OF DECK ABOVE
PARTITION TYPE 'D1'
(NON-RATED / 4" METAL STUDS / INSULATED - SMOKE PARTITION)
WALL BASE
PARTITION TYPE 'D2'
(NON-RATED / 2 1/2" METAL STUDS / INSULATED - SMOKE PARTITION)
METAL STUD @ CEILING
T Y
P
6"
SEE PLAN
VARIES
PARTITION TYPE 'X1'
(EXISTING EXTERIOR WALL CONSTRUCTION / GYP. BD. / INSULATED)
CONTINUOUS ACOUSTIC
SEALANT
WALL BASE
IMPACT RESISTANT GYPSUM
BOARD
CEILING - SEE ROOM
FINISH SCHEDULE
EXISTING 8" METAL STUDS
TO REMAIN
EXISTING EXTERIOR WALL
CONSTRUCTION, EIFS OR
BRICK VENEER
EXISTING DEFLECTION TRACK
TO REMAIN
UNDERSIDE OF DECK
THERMAL INSULATION, MIN. R-13
TYPICAL TEMPORARY CONSTRUCTION
PARTITION
UNDERSIDE OF EXISTING
DECK
1 HR RATED TEMPORARY
PARTITION. HI-IMPACT 5/8" GYP.
BOARD ON 3 5/8" METAL STUDS.
FINISH OCCUPIED SIDE PER
ROOM FINISH SCHEDULE
PLASTER TAPE ALL GYP. BD.
JOINTS. SECURE ALL TAPE
WITH RAM-TACK HIGH TACK
SPRAY OR EQUAL.
OCCUPIED SIDERENOVATION SIDE
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
COMPRESSIBLE
INSULATION
SEAL PERIMETER
COMPRESSIBLE
INSULATION
SEAL PERIMETER
MECHANICALLY FASTEN
BOTTOM TRACK TO FLOOR
PARTITION TYPE GENERAL NOTES
1. PROVIDE 5/8" TYPE 'X' IMPACT RESISTANT GYPSUM BOARD UNLESS NOTED
OTHERWISE
2. PROVIDE HI-IMPACT CEMENT BACKERBOARD AT ALL SHOWER WALLS, TYP.
3. PROVIDE GLASS MAT WATER RESISTANT BACKER BOARD AT ALL WALLS WITH
TILE FINISH, EXCEPT SHOWER WALLS, TYP.
4. IF NOT SHOWN ON DRAWINGS, PROVIDE CONTROL JOINTS IN GYPSUM BOARD
ASSEMBLIES AS DESCRIBED IN ASTM C 840-08 OR GA-216-2013.
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C :\R ev it\
\1
4_
A _m ic he lle .b ur ri.
rv t
5/
/2
:2 5:
A
M
39-A002
PARTITION TYPES RENOVATE B39-2 WEST
FOR PATIENT PRIVACY
BATTLE CREEK, MI
515-20-102
05/20/2021 KJH MRB/MMN
100% BID DOCUMENTS190134
Revisions: Date:
65% DESIGN DEVELOPMENT 03/06/2020
RESUBMIT WITH OWNER CHANGES 10/02/2020
UP DN DN
UP
DEMO PLAN LEGEND:
EXISTING WALL OR
PARTITION TO REMAIN
EXISTING DOOR TO
REMAIN
EXISTING BUILDING
COMPONENT &
STRUCTURE TO REMAIN
EXISTING WALL/PARTITION
OR EXISTING ITEMS TO BE
REMOVED
EXISTING DOOR & FRAME TO
BE REMOVED
EXISTING ASSEMBLY TO BE
REMOVED
NOTE: ALL ITEMS SHOWN IN
RED AND DASHED ARE TO BE
DEMOLISHED - U.N.O.
GENERAL DEMOLITION NOTES:
1. ALL EXISTING ITEMS TO BE RETAINED BY THE OWNER WILL BE REMOVED PRIOR TO
DEMOLITION. ANY ITEMS LEFT IN THE DEMOLITION AREA BECOME THE PROPERTY OF THE
DEMOLITION SUBCONTRACTOR.
2. REFER TO ALL CONTRACT DOCUMENTS FOR ADDITIONAL DEMOLITION NOTES AND
INFORMATION.
3. SHORE AND BRACE ALL WORK REQUIRED TO REMAIN.
4. CONTRACTOR AND SUBCONTRACTORS SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO
BECOME FAMILIAR WITH EXISTING CONDITIONS
5. CONTRACTOR AND DEMOLITION SUBCONTRACTOR TO COORDINATE DEMOLITION WORK WITH
OWNER PRIOR TO START OF WORK.
6. PATCH/REPAIR/REPLACE ALL MATERIALS AFFECTED BY RENOVATION TO MATCH ORIGINAL
EXISTING MATERIAL, FINISH, COLOR, ETC., U.N.O.
7. PATCH, REPAIR, REPLACE EXISTING MATERIALS AS REQUIRED TO RECEIVE NEW FINISHES.
8. U.N.O. PATCH AND PREPARE FLOOR W/CONCRETE (OR FLORSTONE) FLUSH WITH ADJACENT
FLOOR SURFACE. FILL ANY SLOPING OR RECESSED AREAS LEVEL TO TYPICAL FINISH FLOOR
ELEVATION TO ACCOMMODATE NEW FLOOR COVERINGS.
3.7
KA B C D E G H IA.5 A.9 E.3 E.7 J.1 J.5
2.1
1.7
1.8
0 .8
F
DAY ROOM
B118
MEDS
B120
STORAGE
B132
ELEVATOR
TREATMENT
B106
OFFICE
B108
OFFICE
B110
OFFICE
B112
GROUP ROOM
B114
OFFICE
B107
OFFICE
B109
STAFF OFFICE
B111
NURSE
STATION
B113
PRIVATE
B130
PRIVATE
B128
SEMI
B125
SEMI
B127
S. TOILET
B121
RESTRAINT
B122
ISOL.
B126
ANTE ROOM
B124
NOURISH
B141
PRIVATE
B143
PRIVATE
B145
PRIVATE
B149
PRIVATE
B147
SEMI
B142SEMI
B144
SEMI
B146
HSK
B140
LAUNDRY
B134
STORAGE
B151
STAIR
LAUNDRY
B153
SOILED LINEN
B102
STAFF LOCKER
RM / LOUNGE
B101
CLEAN LINEN
B105
HSK EQUIP.
B104
BATHROOM
B146A
BATHROOM
B144A
BATHROOM
B142A
BATHROOM
B123A
BATHROOM
B125A
BATHROOM
B127A
BATHROOM
B128A
BATHROOM
B130A
BATHROOM
B124A
BATHROOM
B149A
BATHROOM
B147A
BATHROOM
B145A
BATHROOM
B143A
CORRIDOR
BC-12
STAIR
ELECTRICAL
B155
ELECTRICAL
B136
CORRIDOR
BC-11
CORRIDOR
C-20CORRIDOR
C-21
CORRIDOR
BC-13
GROUP ROOM
141A
GROUP ROOM
105A
SEMI
B123
STORAGE
B113A
STORAGE
B118A
CORRIDOR
BC-15.2
CORRIDOR
BC-14
CORRIDOR
BC-16
CORRIDOR
BC-17.2
DAY ROOM
NOURISHMENT
105E
MED ROOM
107A
STAFF
NURSE
STATION
C14A
CLEAN UTILITY
104B
LAUNDRY
104A
NURSING 2
BED
NURSING 2
BED
103A
NURSING 2
BED FEMALE
TREATMENT
NURSING 2
BED
EXIT
VESTIBULE
C11 UNIT
CORR./CHARGE
NURSE
AMM/SPD
ST…
This is the start of the file's text. The full file is on GovTribe.