This submittal register outlines the required submittals for the Repair Brig 3107 HVAC C2 Mech Room project at Joint Base Charleston - Weapons Station in South Carolina. The contractor must provide personnel, equipment, tools, materials and supervision to complete the project within 465 calendar days. Submittals are required for plans, procedures, product data, test reports, certificates and closeout documents covering project management, safety, quality control, environmental protection, demolition, firestopping, HVAC, controls, electrical and fire alarm work. Testing is specified for pressure, welding and system performance. Training and demonstrations are also required. The register lists over 100 submittal items across more than 40 specification sections.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Brig 3107 HVAC C2 Mech Room at

Joint Base Charleston – Weapons Station North Charleston, South Carolina

Charleston County

Submittal Register

June 30, 2020 100% Submittal

Project Manager: Greg Jones, P.E.

gregj@adcengineering.com JBC Project No. DKFX 19-1073225 ADC Project No. 19243

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 18 PAGES

Repair Brig 3107 HVAC C2 Mech Rm - Weapons Station

01 11 00 SD-01 Preconstruction Submittals

1.6.2 GOutage Requests

1.6.2 GRoad Closure Requests

1.6 GWork Clearance

GContractor's Proposed Laydown

Area Plan

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 GList of Contact Personnel

1.3.1.3 GPersonnel List

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures

1.6.2 GResume for the proposed

Superintendent

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3 G CENMProject Schedule

1.4.1 G CENMInitial Contract Progress Report

(AF IMT 3065)

1.4.2 G CENMInitial Contract Progress

Schedule (AF IMT 3064)

SD-07 Certificates

1.3.3 G CENMProject Schedule Updates

1.4.1 GMonthly Contract Progress

Reports (AF IMT 3065)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 18 PAGES

01 32 16.00 20 1.4.2 GMonthly Contract Progress

Schedules (AF IMT 3064)

01 33 00 SD-01 Preconstruction Submittals

1.6 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

1.6.1.1 GCritical Lift Plan

1.5.1.3 GCrane Operators

SD-06 Test Reports

1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates

1.8.1Confined Space Entry Permit

1.8.1Hot Work Permit

01 45 00 SD-01 Preconstruction Submittals

1.7 GQC Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 18 PAGES

01 45 35 3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Certificate of Compliance

1.5.10 GSpecial Inspector of Record

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.1 GInterim Report

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SD-03 Product Data

1.4Backflow Preventers

SD-06 Test Reports

2.2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 54 00.00 31 SD-03 Product Data

1.5.2.1 GAffirmative Procurement

Reporting Form

01 57 19.00 31 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 18 PAGES

01 57 19.00 31 1.8.3 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

1.6 GDirt and Dust Control Plan

SD-06 Test Reports

3.9.2Disposal Requirements

1.8.4Erosion and Sediment Control

Inspection Reports

3.4Erosion and Sediment Control

Inspection Reports

3.4Storm Water Inspection Reports for General Permit

1.8.5 GSolid Waste Disposal Report

SD-07 Certificates

1.8.2 GContractor 40 CFR employee

training records

SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook

1.8Waste Determination

Documentation

3.7.2Waste Determination

Documentation

1.8.1Disposal Documentation for

Hazardous and Regulated Waste

1.8.2Contractor 40 CFR Employee

Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 18 PAGES

01 57 19.00 31 1.7.2Solid Waste Disposal Permit

1.8.5Solid Waste Disposal Report

3.7.2Hazardous Waste/Debris

Management

1.8.3Regulatory Notifications

01 57 20.00 31 SD-01 Preconstruction Submittals

Material Safety Data Sheets

(MSDS)

SD-06 Test Reports

1.8Green Procurement

1.8Green Procurement

1.3Recycling Report

1.3Recycling Report

01 74 19.00 31 SD-01 Preconstruction Submittals

1.3.3 GConstruction Waste Management

Plan

SD-11 Closeout Submittals

1.8 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.5.1Warranty Management Plan

1.5.4Warranty Tags

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

3.9Preventative Maintenance

3.9Condition Monitoring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 18 PAGES

01 78 00 3.9Inspection

1.5.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

3.10 GInterim DD FORM 1354

3.10 GChecklist for DD FORM 1354

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.2.2Receipts

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 18 PAGES

07 84 00 2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

23 00 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SD-03 Product Data

2.9.1.1Duct Connectors

2.9.2 GDuct Access Doors

2.9.3 GManual Balancing Dampers

2.9.6.1Diffusers

2.11 GAir Handling Units

1.4.4Test Procedures

1.2.1.2 GDiagrams

SD-06 Test Reports

3.11 GPerformance Tests

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.13.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 18 PAGES

23 00 00 3.13.1 GOperation and Maintenance

Manuals

2.9.3 GManual Balancing Dampers

2.11 GAir Handling Units

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.4.2 GTAB Design Review Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 18 PAGES

23 05 93 SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.1.3 GTAB Related HVAC Submittals

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.5.4.3 GPrerequisite HVAC Work

Checkout List

1.5.4.3 GPrerequisite HVAC Work

Checkout List

3.7 GProportional Balancing

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.4.2 GDALT and TAB Submittal and

Work Schedule

1.5.4.3 GTAB Pre-Field Engineering

Report

1.5.6 GInstrument Calibration

Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 18 PAGES

23 05 93 3.7 GDALT and TAB Procedures

Summary

3.7 GCompleted Pre-Final DALT Work

Checklist

3.3.2 GAdvance Notice of Pre-Final

DALT Field Work

3.7 GProportional Balancing

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.3 GDDC Contractor Design Drawings

3.3 GDraft As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 18 PAGES

23 09 00 3.3 GFinal As-Built Drawings

SD-03 Product Data

1.8.3 GProgramming Software

1.8.4 GController Application Programs

1.8.1 GConfiguration Software

1.8.2 GController Configuration Settings

2.2 GManufacturer's Product Data

SD-05 Design Data

1.9Boiler Or Chiller Plant Gateway

Request

SD-06 Test Reports

3.1.1Existing Conditions Report

3.5.2 GStart-Up Testing Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

1.10.1 GPre-Construction Quality Control

(QC) Checklist

1.10.2 GPost-Construction Quality Control

(QC) Checklist

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

(O&M) Instructions

3.8.1 GTraining Documentation

SD-11 Closeout Submittals

2.5 GEnclosure Keys

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 18 PAGES

23 09 00 3.2.6.1 GPassword Summary Report

1.10.3 GCloseout Quality Control (QC)

Checklist

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.3.1Qualifications

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SD-10 Operation and Maintenance

Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 64 10 SD-03 Product Data

2.4 GWater Chiller

1.5.1Verification of Dimensions

3.5System Performance Tests

3.6Demonstrations

2.5.1Refrigerant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 18 PAGES

23 64 10 3.4.1Water Chiller - Field Acceptance

Test Plan

SD-06 Test Reports

3.4Field Acceptance Testing

3.4.2Water Chiller - Field Acceptance

Test Report

3.5System Performance Tests

SD-07 Certificates

3.1.8 GRefrigeration System

SD-08 Manufacturer’s Instructions

3.1 GWater Chiller - Installation

Instructions

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

Manuals

23 64 26 SD-03 Product Data

2.4.8 GCalibrated Balancing Valves

2.4.9Pump Discharge Valve

2.6 GPumps

2.5.2Combination Strainer and Pump

Suction Diffuser

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

3.4.2 GPressure Tests Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 18 PAGES

23 64 26 3.1.1.1Employer's Record Documents

(For Welding)

3.1.1.2Welding Procedures and

Qualifications

SD-08 Manufacturer’s Instructions

3.5 GLesson plan for the Instruction

Course

SD-10 Operation and Maintenance

Data

2.4.8 GCalibrated Balancing Valves

2.4.9 GPump Discharge Valve

2.6 GPumps

2.5.2 GCombination Strainer and Pump

Suction Diffuser

23 81 00 SD-03 Product Data

3.7.1Spare Parts

3.4Posted Instructions

2.4.1Coil Corrosion Protection

3.6System Performance Tests

3.4 GTraining

1.5Inventory

2.1Supplied Products

2.2Manufacturer's Standard Catalog

Data

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 18 PAGES

23 81 00 3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates

3.7.2Service Organizations

SD-10 Operation and Maintenance

Data

3.4 GOperation and Maintenance

Manuals

26 05 00.00 40 SD-03 Product Data

2.1.1 GConduits and Raceways

2.2.1 GWire and Cable

3.2.5 GSplices and Connectors

2.1.2 GOutlet Boxes, Pull Boxes and

Junction Boxes

2.1.3.1 GCircuit Breakers

2.1.3 GPanelboards

2.2.2 GDevice Plates

SD-06 Test Reports

3.5 GContinuity Test

3.5 GInsulation Resistance Test

3.5 G600-Volt Wiring Test

SD-08 Manufacturer’s Instructions

3.1Manufacturer's Instructions

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 18 PAGES

26 05 48.00 10 1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

26 24 16.00 40 SD-03 Product Data

2.2.1 GCircuit Breakers

26 24 19.00 40 SD-03 Product Data

2.2.2Enclosures

3.2.1Final Test Reports

3.2.1Acceptance Tests

SD-11 Closeout Submittals

3.3Warranty

26 41 00 SD-02 Shop Drawings

1.4.1.1 GRevised lightning protection

system

1.4.1.2 GEach major component

SD-06 Test Reports

1.4.3 GLightning Protection and

Grounding System Test Plan

3.3.1 GLightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3 GLightning Protection System

Installers Documentation

1.4.2 GComponent UL Listed and

Labeled

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 18 PAGES

26 41 00 1.4.4 GLightning protection system inspection certificate

26 51 00 SD-02 Shop Drawings

1.4.1 GLuminaire Drawings

SD-03 Product Data

2.1 GLuminaires

2.3 GLight Sources

2.2 GDrivers, Ballasts and Generators

1.5.1 GLED Luminaire Warranty

1.4.2 GLuminaire Design Data

1.4.4.3 GEnergy Efficiency

28 31 76 SD-02 Shop Drawings

3.1.1 GWiring Diagrams

1.2.1 G AOSystem Layout

2.3 G AOSystem Operation

SD-03 Product Data

2.4 GSmoke Sensors

SD-06 Test Reports

3.4Field Quality Control

3.4.1 G AOTesting Procedures

SD-07 Certificates

1.6.1.4Installer

3.4.2.2Formal Inspection and Tests

3.4.2.3Final Testing

SD-09 Manufacturer’s Field

Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 18 PAGES

28 31 76 2.3 G AOSystem Operation

1.6.2.2Fire Alarm System

SD-11 Closeout Submittals

3.4.2.4As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .