This addendum modifies a solicitation for a firm-fixed price contract to repair HVAC systems at Joint Base Charleston in South Carolina. Key changes include removing a hot water system flushing requirement and revising specifications for replacing air handling units and associated hot water coils, piping, valves, and controls. Bidders must provide unit pricing and total costs for the air handling unit replacements according to the attached details. Additional piping, valve, insulation and control specifications are noted. The location and time of an optional pre-bid site visit are provided, with registration requirements. The Department of the Air Force Air Mobility Command is the contracting agency.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 01
SOLICITATION NUMBER FA441822-R-0011
PROJECT DKGV 1073225
REPAIR BRIG HVAC, Bldg 3107
JOINT BASE CHARLESTON, SC
05 May 2022
1. Solicitation, Section B, CLIN 0006: Delete this CLIN in its entirety. The Hot Water System shall not be flushed by the contractor and shall not be proposed as a bid option. The Bid Option in the plan sheet G200 is #5.
2. Solicitation, Section B, CLIN 0005: This is Bid Option #4 on sheet G200. The CLIN is revised to the following:
| Item |
| Supplies/Service |
| Qty |
| Unit |
| Unit Price |
| Amount |
| 0005 |
| AHU A1, A2, B1, B3: Replace housing units AHU A1, A2, B1, and B3 shown on sheet M201 and E104. For each AHU, replace associated hot water coils, piping, valves, and controls per Addendum 01, Item 5 and attached drawings and tables. There are seven (7) HW coils per AHU. |
| 4 |
| Each |
3. Plan Sheet G200, Bid Option #4, modify as follows:
Contractor shall provide with their proposal a per AHU unit price line item and a total cost to replace housing unit AHU (AHU-A1, AHU-A2, AHU-B1, AHU-B3) shown on sheet M201 and E104. For each AHU, replace associated hot water coils, piping, valves, and controls per Addendum 01, Item 5 and attached drawings and tables. There are seven (7) HW coils per AHU.
4. Plan Sheet M002 –Hydronic System Scope Notes: Delete Note 1 in its entirety.
5. Provide the following for the new HW Coils of AHU-A1, A2, B1, and B3
a. See attached 2 files for arrangement of the Hot Water Coil and the duct mounted HW coil schedule. All work shall include transitions to ductwork upstream and downstream of the coils.
b. The coil details are shown below and should include all new components between the coil and the existing isolation valves.
c. Provide 3-way DDC Control water valves. Controls and all HW coils (or indicate “Typ”) shall be added to the control schematic of sheet M006. The Contractor shall modify the record drawings by the contractor, including controls, upon completion of work. The Sequence of Operation (Sheet M006) covers new hot water coils.
d. Provide insulation for heating hot water piping per Section 23 07 00
e. Provide hangers and seismic restraints per Section 23 05 48.19
f. Provide piping, fittings, valves, etc. per Section 23 64 26
g. The HW coils shall be added to TAB of Section 23 05 93 and the DDC controls of Section 23 09 13 and 23 09 23.02.
h. Contractor to submit for approval all material, tests, O&M, data sheets, etc., per the individual Specifications sections and per Section 01 33 00, Submittal Procedures.
6 | Page
DUCT MOUNTED HOT WATER COILS
| SYMBOL |
| HWC-1 |
| HWC-2 |
| HWC-3 |
| HWC-4 |
| HWC-5 |
| HWC-6 |
| HWC-7 |
| HWC-8 |
AIR QUANTITY, CFM
CAPACITY, BTU/HR
68,590
46,040
123,792
46,510
75,402
125,201
32,886
64,792
| ENT. AIR DB, oF |
| 46.5 |
| 46.5 |
| 46.5 |
| 46.5 |
| 46.5 |
| 46.5 |
| 46.5 |
| 47.3 |
| LVG. AIR DB, oF |
| 90 |
| 90 |
| 90 |
| 90 |
| 90 |
| 90 |
| 90 |
| 90 |
| MAX. AIR PRESSURE DROP, IN. H20 |
| .25 |
| 0.25 |
| 0.28 |
| 0.26 |
| 0.26 |
| 0.29 |
| 0.25 |
| 0.24 |
| MAX. FACE VELOCITY, | FPM |
| 700 | |
| 700 | |
| 700 | |
| 700 | |
| 700 | |
| 700 | |
| 700 | |
| 700 |
| HOT WATER GPM |
| 2.8 |
| 1. 9 |
| 5.1 |
| 1.9 |
| 3.1 |
| 5.2 |
| 1.4 |
| 2.7 |
| ENTERING WATER TEMP., oF |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| LEAVING WATER TEMP. oF |
| 150 |
| 150 |
| 150 |
| 150 |
| 150 |
| 150 |
| 150 |
| 150 |
| MAX. WATER PRESSURE DROP, FT. H20 |
| 5 |
| 5 |
| 5 |
| 5 |
| 6 |
| 5 |
| 5 |
| 5 |
| LOCATION |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
DUCT MOUNTED HOT WATER COILS
| SYMBOL |
| HWC-9 |
| HWC-10 |
| HWC-11 |
| HWC-12 |
| HWC-13 |
| HWC-14 |
AIR QUANTITY, CFM
CAPACITY, BTU/HR
47,038
133,736
37,353
65,023
129,585
47,038
| ENT. AIR DB, oF |
| 47.3 |
| 47.3 |
| 47.3 |
| 47.3 |
| 47.3 |
| 47.3 |
| LVG. AIR DB, oF |
| 90 |
| 90 |
| 90 |
| 90 |
| 90 |
| 90 |
| MAX. AIR PRESSURE DROP, IN. H20 |
| 0.26 |
| 0.31 |
| 0.19 |
| 0.21 |
| 0.30 |
| 0.26 |
| MAX. FACE VELOCITY, | FPM |
| 700 | |
| 700 | |
| 700 | |
| 700 | |
| 700 | |
| 700 |
| HOT WATER GPM |
| 1.9 |
| 5.5 |
| 1. 5 |
| 2.7 |
| 5.3 |
| 1. 9 |
| ENTERING WATER TEMP., oF |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| LEAVING WATER TEMP. oF |
| 150 |
| 150 |
| 150 |
| 150 |
| 150 |
| 150 |
| MAX. WATER PRESSURE DROP, FT. H20 |
| 5 |
| 5 |
| 5 |
| 5 |
| 5 |
| 5 |
| LOCATION |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
| FAN RM A248 |
image1.png image2.png