B3107 Questions and Answers.xlsx
XLSX spreadsheet 120 KB Posted
- Attached to
- Repair Brig 3107 HVAC, C2 Mech Room
- Solicitation number
- FA4418-22-R-0011
About this file
This document contains questions and answers related to a federal solicitation for repair work at Joint Base Charleston - Weapons Station in South Carolina. The solicitation seeks a firm-fixed price contract to complete project DKGV 1073225/Repair Brig 3107 HVAC, C2 Mech Room, with an anticipated performance period of 465 calendar days. The pre-bid site visit was scheduled for April 28, 2022, with attendees required to bring a valid driver's license. Questions from prospective bidders cover clarification of equipment numbers and locations, control requirements, responsibility for existing insulation repairs, storage and use of government facilities and equipment by the contractor, and security procedures.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 JB Charleston Bidder Inquiry Form EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984) Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders. (Reference FAR 52.214-6)
| Solicitation Number | FA4418-22-R-0011 |
| Project Name: | Repair Brig HVAC DKGV-1073225 |
| # | Specification Reference (Section & Paragraph Reference, i.e. 23 00 00, para 1.3) | Drawing Reference (Sheet and Detail or Note Reference, i.e. M-101, Detail 2) | Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e. Section M, Paragraph 2.3) | Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.) | |
| 1 | Question | ||||
| G200,M300 | The base bid option requests a motorized damper replacement for ERV-B-1 on G200 but M300 shows that unit as ERV-B-4. Can you please clarify which ERV is getting the motorized damper replacement? | ||||
| Answer | |||||
| ERV-B-1 was the original number on As-builts plans for Bldg B-4 project. The correct number is ERV-B-4. The contractor will correct on the post construction As-builts. | |||||
| 2 | Question | ||||
| M003 Detail 1/2, M006 | On M003, detail 1 shows AFMS on the OA and RA, as well as a drain pan and a condensate overflow switch. Some of the control schematics on M006 do not match this detail. For the final controls points counts, can the controls schematics on M006 be used and detail 1 on M003 ignored? Otherwise, please clarify which AHUs detail 1 on M003 applies to. Same thing for detail 2 on M003, but only for the float switch. | ||||
| Answer | |||||
| M003, Detail 1 Notes indicate which AHU's this applies to on M006. M003, Detail 2 applies only to suspended horizontal units indicated in M006 (AHU- 10 thru 13). M003, detail 5 applies to the MAU's. For M-003, these are the unit install details and all control points are not shown. Float switches shall be incorporated into control dagram/schematics/Sequence of Ops (M006). The AFMS are as indicated on M003 and M006. Drain pans are as indicated. | |||||
| 3 | Question | ||||
| M005, detail 3 | On M005, detail 3 shows a total of 27 control valves. Is it the intention for all of these to be new and replaced, or are the valves for the units that are not in the scope being left alone? | ||||
| Answer | |||||
| Control Valves are only to be replaced with the AHU's that are replaced. These are indicated by bolded motor operated valves on detail 3/M005. The valves that are non-bolded are existing and will be left in place. | |||||
| 4 | Question | ||||
| M005, detail 3 | On M005, detail 3 shows a total of 5 flow meters. The 2 meters adjacent to the chillers do not exist and we are planning on new meters. If the other 3 already exist, do you want those replaced, or are they to remain? Same situation and device count applies to the differential pressure transducers. | ||||
| Answer | |||||
| Only Flow Meters (2) at the two new chillers are to be replaced. Differential Pressure transducers (3) are to be replaced at the chillers and at the cross connect from removal of CHWP-5 as shown in bold. | |||||
| 5 | Question | ||||
| M006 | On M006, all 4 unit schematic diagrams (picture below) show pressure and temperature sensors on the inlet and outlet sides of coils, hot and cold. The sequence does not use these points, and they are not listed as a point to generate an alarm condition. On other projects, we have |
removed these points with gov’t approval to generate cost savings. Are these necessary to keep? If so, please advise what you would like to see done with the data or if they are just for viewing purposes on the graphic for the maintenance team.
| Answer | |||||
| Provide points as indicated. The government will use it for system information when needed. | |||||
| 6 | Question | ||||
| General | Is the contractor required to repair deteriorated/damaged insulation on duct or piping that was not damaged by the contractor? | ||||
| Answer | |||||
| Sect 01 30 00, para 1.3, Sect 01 57 19.00 31, para 1.7.1, and Sect 02 41 00, para 1.9 | Contractor shall photograph and document all existing conditions prior to start of any work phase. This will be the contractors' proof that any damage prior to construction was existing. If adjacent work is damaged without these photos, it will be assumed that the damage was caused by the contractor and will be held responsible for repair. Photograph requirements are indicated in Section 01 30 00, paragraph 1.3, Sect 01 57 19.00 31, para 1.7.1, and Sect 02 41 00, para 1.9. | ||||
| 7 | Question | ||||
| Bid Option Unit Price | 2. Bid Option 3 Contractor shall provide with their proposal a per makeup air unit, unit price line item and a total cost for the demolition and replacement of MAU-1N and 2N shown on sheet M202 and E104. Section B of the solicitation Item 0004 MAU-1N and 2N: Demolition and replacement of MAU 1N and 2N shown on sheet M202 and E104 2 each. These units are different sizes therefore will be different prices will a revised section B be provided? | ||||
| Answer | |||||
| Contractor shall submit a price for each MAU and a total cost for both units for this line item. | |||||
| 8 | Question | ||||
| Bid Option Unit Price | Question about how pricing needs to be submitted. In the solicitation it mentions unit prices and also total amounts of each of the options. This pricing break out per unit will be easy for some of the bid options, since the units in the option are all identical. However for the base bid and bid option 4 have varying sizes of unit and the pricing will not be the same per unit. How would you like me to break out the pricing for those bid options? | ||||
| Answer | |||||
| Contractor shall submit a price for each MAU and a total cost for both units for this line item. | |||||
| 10 | Question | ||||
| It was mentioned several times throughout the site visit by Brig Leadership that the successful contractor would have access to Government owned equipment (forklifts/man lifts/other heavy equipment/tools) and that the contractor would be able to utilize said equipment at will whenever it is necessary throughout the duration of the project (465 days estimated). Will the untethered utilization of Government owned equipment be allowed by the contractor at any time during this contract? If yes, please specify what equipment/tools/heavy machinery is available to the contractor to utilize throughout the period of performance of this solicitation. | |||||
| Answer | |||||
| General | For liability concerns, Contractor will not be allowed to use Government Equipment or tools. All tools and equipment needed to perform the work shall be provided by the contractor and accounted for appropriately in each proposal. Any material, tools, or equipment brought into the fenced area will need to be inventoried as it is brought in or taken out. This includes anything stored in the conex box(es) inside the fenced area. Equipment will have to be locked and keys removed when contractor is not using it. | ||||
| 11 | Question | ||||
| It was mentioned several times throughout the site visit by Brig Leadership with CE/CONS present that the successful contractor would have access to a large storage facility at any time that is located within the Brig complex for storing equipment (man lifts/forklifts/etc) and materials. Will the Government be giving the successful contractor untethered access (to include keys/code to access in the event that Brig Leadership is not available) to a specific |
building for the purpose of storing materials/equipment/tools at any time during this contract? If yes, please specify what building is being designated and location of building.
| Answer | |||
| General | For liability concerns, Contractor will not be allowed to use Government Storage building for material or equipment storage. Any material, tools, or equipment brought into the fenced area will need to be inventoried as it is brought in or taken out. This includes anything stored in the conex box(s) inside the fenced area. Equipment will have to be locked and keys removed when contractor is not using it. | ||
| 12 | Question | ||
| Will photos that were taken by the Government be posted to Beta.Sam for proposal purposes? | |||
| Answer | |||
| General | Photographs of areas to be worked will be added to the solicitation site. These photos were aken as requested by contractors visiting the site as security measures prevented the use of personal electronic devices within the Brig Facility. These photos are provided for reference only, please reference plans and specifications posted for this solicitation for proposal purposes. | ||
| 13 | Question | ||
| Will all tools (hand tools/pneumatic tools/battery operated tools) necessary for the completion of work on this solicitation be inventoried daily by Brig Security Personnel? | |||
| Answer | |||
| General | Any material, tools, or equipment brought into the fenced area will need to be inventoried daily as it is brought in or taken out. This includes anything stored in the locked conex box(es) inside the fenced area. Equipment will have to be locked and keys removed when contractor is not using it or occupying that specific area. Tools entering or leaving the facility will be inventoried each and every time a contractor enters or leaves. If a tool is lost or misplaced, a Facility lockdown will occur and no one can leave or enter the facility until resolved. The government will not be liable for these delays. Contractor shall work out the details of the daily inventory requirements to discuss mutual means to provide efficient means and methods to this process. | ||
| 14 | Question | ||
| Sheet M102 Details 1/2 | In regards to security fencing (barbed/razor wire) in area C – 3 Inmate Gym on drawing sheet M102, during the site visit, the Government obligated resources to remove and re-install security fencing when the contractor needs access to and is finished with installation of (2) condensing units (CU – SS – M1/CU – SS – M2) in this area. Will the Government be responsible for removing and re-installing this security fencing daily (work in this area will take approximately 1 - 2 weeks) in order to keep area secure in correlation with any Government/Brig safety standards? | ||
| Answer | |||
| Sheet M102 Details 1/2 | General | The government will not remove the fencing for the contractor. Any access to the roof will be by contractor-provided lift over the existing fencing to remove and install HVAC units. | |