Subcontractor_List.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- F-16 Canopy Actuated Release Bolt
- Solicitation number
- FA821326R3021
About this file
This is a Subcontractor List template for documenting contractors and subcontractors working with Arms, Ammunition & Explosives (AA&E) on federal contracts. The template requires comprehensive documentation of each contractor entity involved in AA&E handling, including their role as either lead contractor or subcontractor, the specific AA&E items being handled, and associated technical classifications.
The template mandates submission of detailed information for each contractor, including the National Stock Number (NSN) for AA&E items, Security Risk Classification (SRC) per DODM 5100.76, hazard classification (HC) per TB 700-2, and Government Furnish Property (GFP) designation. Additionally, contractors must provide their complete physical address where AA&E will be handled, the corresponding CAGE code (verified against official records), and full contact information for a Point of Contact at that location. The example provided shows Propellants "R" Us, Inc. as the lead contractor handling 10 lbs. of Experimental M14 Propellant Grains with an SRC of IV and HC of 1.3, classified as non-government furnished property at Picatinny Arsenal in New Jersey, with Ryan Ordemann identified as the POC. This submission requirement applies to the F-16 Canopy Actuated Release Bolt (CARB) solicitation (FA821326R3021) administered by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRLs.pdf | ||
| Item Description.pdf | ||
| SPI.pdf | ||
| ADC SOW.docx | DOCX document | |
| FA821326R3021.pdf | ||
| CADPAD Item Marking Instruction - Ver 1.6.pdf | ||
| EDLs.pdf | ||
| Evaluation Criteria.docx | DOCX document | |
| Air_Specs.docx | DOCX document | |
| ES7034.pdf | ||
| JFQR.pdf | ||
| REPSHIP.doc | DOC document | |
| SOW Packaging.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA&E Spreadsheet
| Provide the contractor's name who will be working with the AA&E. | Identify if this contractor is the lead contractor or a subcontractor. | Identify the Arms, Ammunition & Explosives (AA&E) the contractor is going to be working with. | Provide the National Stock Number (NSN) for the AA&E if one exists. If a NSN does not exist for the AA&E then list N/A. | Serial #/ Part # for subcontractor | Identify the Security Risk Classification (SRC) of the AA&E. Instructions for determining the SRC are found in Enclosure 7 (p. 40 - p.46) of DODM 5100.76. The SRC can be either I, II, III, IV or U. | Identify the hazard classification (HC) of the AA&E. Instructions for determining the HC are found in Chapter 2 (p.2) of TB 700-2. | Identify whether or not the AA&E will be furnished by the Government as GFP (YES/NO). GFP Template required if YES. | Provide the complete physical address of the contractor's location where the AA&E will be handled. | Provide the cage code for the physical address of the contractor's location where the AA&E will be handled. | Check to make sure the address and cage code match on <www.sam.gov>. | Provide the full name, phone number and email address for a POC at this location. |
| Contractor Name | Lead/Sub | AA&E | NSN | Serial #/ Part # | SRC | HC | GFP | Address | Cage Code | Address & Cage Code Match | POC Info |
Example
| Provide the contractor's name who will be working with the AA&E. | Identify if this contractor is the lead contractor or a subcontractor. | Identify the Arms, Ammunition & Explosives (AA&E) the contractor is going to be working with. | Provide the National Stock Number (NSN) for the AA&E if one exists. If a NSN does not exist for the AA&E then list N/A. | Identify the Security Risk Classification (SRC) of the AA&E. Instructions for determining the SRC are found in Enclosure 7 (p. 40 - p.46) of DODM 5100.76. The SRC can be either I, II, III, IV or U. | Identify the hazard classification (HC) of the AA&E. Instructions for determining the HC are found in Chapter 2 (p.2) of TB 700-2. | Identify whether or not the AA&E will be furnished by the Government as GFP (YES/NO). GFP Template required if YES. | Provide the complete physical address of the contractor's location where the AA&E will be handled. | Provide the cage code for the physical address of the contractor's location where the AA&E will be handled. | Check to make sure the address and cage code match on <www.sam.gov>. | Provide the full name, phone number and email address for a POC at this location. | ||
| Contractor Name | Lead/Sub | AA&E | NSN | SRC | HC | GFP | Address | Cage Code | Address & Cage Code Match | POC Info | ||
| Propellants "R" Us, Inc. | Lead | 10 lbs. of Experimental M14 Propellant Grains | N/A | IV | 1.3 | NO | Bldg. 1301 | |||||
| Picatinny Arsenal, NJ 07806 | XXXXX | Ryan Ordemann |
(973) 724-8742 ryan.t.ordemann.civ@mail.mil
File details come from the government source that posted it. Updated .