ES7034.pdf

PDF 36 KB Posted

Attached to
F-16 Canopy Actuated Release Bolt
Solicitation number
FA821326R3021
Issued by

About this file

This document is a federal contract clause (ES7034) establishing requirements for the rework and repair of nonconforming material, effective January 2012.

The clause defines rework as the reprocessing of nonconforming material to achieve complete conformance with drawings, specifications, and contract requirements, while repair is defined as reprocessing that reduces but does not completely eliminate nonconformance, bringing material into a usable condition. Contractors must document rework procedures along with associated inspection procedures and submit them to the Government Quality Assurance Representative (QAR) for review prior to implementation, with rework procedures subject to the QAR's disapproval. Repair procedures must be documented and submitted on DD Form 1694 (Request for Deviation/Waiver) to the Contracting Officer for written approval before implementation. All submissions for repair or rework procedures must include a description of the cause of nonconformances and preventive actions taken or to be taken. Both rework and repair procedures must include reinspection provisions that take precedence over Technical Data Package requirements and provide government assurance that reworked or repaired items meet reprocessing standards. This requirement applies throughout the supply chain and is mandatory for contractors and their suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
CDRLs.pdf PDF
Item Description.pdf PDF
SPI.pdf PDF
FA821326R3021.pdf PDF
CADPAD Item Marking Instruction - Ver 1.6.pdf PDF
EDLs.pdf PDF
Evaluation Criteria.docx DOCX document
Subcontractor_List.xlsx XLSX spreadsheet
Air_Specs.docx DOCX document
ADC SOW.docx DOCX document
JFQR.pdf PDF
REPSHIP.doc DOC document
SOW Packaging.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)