This file is a vendor question log containing answers to inquiries submitted by potential respondents to the Small Uncrewed Aerial System (sUAS) Capabilities Request for Information (RFI) issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base under solicitation number sUAS_RPRD_2026.

The document serves as a questions and answers appendix providing clarification on the RFI requirements and supporting documentation. As a pre-solicitation RFI, this opportunity seeks information on five lines of effort: Hardware, Software, Communications, Sensors, and Kinetics, each designed to support distinct missions including Long Range One Way Attack, Air Interdiction, Medium Range One Way Attack, Air Launched Effects, and Medium Range Intelligence, Surveillance, and Reconnaissance. The vendor question log format indicates this is a compilation of technical and administrative inquiries from interested parties and the government's corresponding responses, intended to clarify the scope, objectives, and expectations outlined in the associated draft Statements of Objectives for each line of effort. This document does not establish contract award dates, pricing terms, or set-asides, but rather functions as a reference tool to facilitate informed responses to the RFI.

View the file

Other files

File Type Posted
Group Weight Table.pdf PDF
RFI - Market Research - 2026.pdf PDF
Att 4 - SOO - RPRD Software.pdf PDF
RFI - Market Research - 2026.pdf PDF
Att 5 - SOO - RPRD Communications.pdf PDF
Att 3 - SOO - RPRD Hardware.pdf PDF
Att 1 - Vendor Question Log.xlsx XLSX spreadsheet
Att 4 - SOO - RPRD Software.pdf PDF
Att 7 - SOO - RPRD Kinetics.pdf PDF
Att 2 - Market Research Focus Questions - 2026.xlsx XLSX spreadsheet
Att 6 - SOO - RPRD Sensors.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question_Log

Vendor Question Log
Question #LOE/SOOPageParagraph Ref.Question/CommentAnswer
1All23.aRegarding video submissions (max 3 minutes showing actual system performance), are there specific scenarios, metrics, or environments preferred for demonstration of software autonomy, swarm coordination, or integration capabilities?Any demonstrations relevant to any of the 5 LOEs.
2All23.c / 5For organizations with classified capabilities relevant to one or more LOEs, what is the process and timeline for receiving instructions on classified submissions, and how does this interact with the unclassified response deadline?Deadline is the same. SIPR for classified (secret) can be sent to wendell.r.toney.ctr@mail.smil.mil; and aaron.r.sorrell.civ@mail.smil.mil
3All12.cThe RFI notes that responses may be used by AFLCMC and other DoD entities. Can the Government clarify the anticipated follow-on acquisition approach, potential contract vehicles, or timeline for moving from market research to solicitation for any of the LOEs?To be determined. At this point we are only attempting to better understand the rapidly evolving market. At this time, the USG is committing to nothing beyond market research unless the USG determines there is a capability worth pursuing. The DAF may share this market research with other agencies.
4All23.bWhat criteria will the Government use to select vendors for the optional oral presentations (7-16 December 2026)? Will presentations be LOE-specific or allow demonstration of integrated capabilities across LOEs?No specific criteria. USG will determine based on information submitted in capabilities statements. LOE specific presentation and integrated capabilites are both acceptable.
5All LOEs1RFI 2.b (1), (3)RFI paragraph 2.b lists Long Range One Way Attack (OWA) and Medium Range OWA among the missions the LOEs are being considered to fulfill. What range from the launch point (in nautical miles, min-max) is expected for each mission?Specific range needs will be decided on receipt of firm requirements. Submissions satisfying any and all ranges will be accepted for the purposes of market research.
6All LOEs1RFI 2.b (4)RFI paragraph 2.b lists Air Launched Effects among the missions the LOEs are being considered to fulfill. Would counter-UAS solutions be considered under the Air Launched Effects mission?Counter-air is primarily short range one way attack. Please include submissions under the Hardware LOE.
7Att 2 - Cover tab2.b.1 to 2.b.3For production rate questions, should vendors report air vehicle units only, or complete systems including ground control stations and ancillary equipment?Complete systems.
8CommunicationsComms WkshtQuestion 1.4LOS Range: the LOS range depends on a number of link parameters in the communications system. If we are offering an incomplete comms system (e.g. radio transceiver, only), are there a set of assumptions we should make for the sake of generating range information (e.g. antenna gain, data rate, symbol rate, channel path loss)? or should we include other figures of merit that are relevant for calculating link range (e.g. receive sensitivity, Noise Figure, ERP...)?Should understand the capabilites of the comms systems being offered, WRT the bandwidth and connectivity limitations, antenna requirements, and all merits of the comms system.
9CommunicationsComm Tabare the comms solutions required to be DO-160 certified for a UAS?Potentially depending on future requirements.
10Focus Questions (Att 2), Cover tabItem 3.4; Para 1.0 of each SOOPlease clarify how the DIU Blue List item (Item 3.4) and FY2020 NDAA section 848 compliance apply to software-only solutions, including ground control software hosted on commercially available computing hardware.Blue list and NDAA do not apply outside of cyber security.
11General1-2Statements of Objectives, specified performance valuesThe Statements of Objectives refer to specified range, payload, endurance, and weather values, but the RFI attaches no numeric thresholds or performance specification. Please confirm those references are placeholders that the Government will define using respondent-submitted performance, and that a respondent will not be scored against an undisclosed threshold.Group weight table attached to RFI. MIL standard 810 will be used to address weather and environmental factors. Specific range needs will be decided on receipt of firm requirements. Submissions satisfying any and all ranges will be accepted for the purposes of market research.
12General12RFI 3 Market Research; SOO 2.0 Desired OutcomesIs the Government willing to observe respondent flight tests or development demonstrations during this market research period and provide informal feedback on observed capabilities? If so, what is the appropriate POC and calendar window to coordinate such an observation?Yes, if chosen for oral presentations.
13General12RFI 1 Objective; SOO 2.0 Desired Outcomes facility/personnel clearanceContinued internal RD investment would be more optimized for the Government via cleared facility and additional cleared personnel sponsorship. Is the Government open to sponsoring that access over the next 6 months? If so, what is the appropriate path to pursue?No. Not without a validated requirement.
14General12Hardware SOO 2.2 PNT / GPS-denied; RFI 3 Market ResearchIs test range access with denied PNT available for testing of integrated systems and communications payloads? If so, what is the appropriate POC and window?Yes, will be available with the development of a validated requirement.
15General (RFI)12.aMay a single response address several lines of effort with one integrated system, or should each line of effort be answered separately?Each line of effort should be addressed separately.
16General (RFI)23.aAre US-incorporated companies with foreign-national founders, or whose CAGE code is still pending, eligible to respond and to be considered for oral presentations?Yes, eligible to respond.
17General (RFI)12.bWhat range in nautical miles is "medium range" for the Medium Range OWA and Medium Range ISR missions?Specific range needs will be decided on receipt of firm requirements. Submissions satisfying any and all ranges will be accepted for the purposes of market research.
18General (RFI)24Is a follow-on contract (OTA, CSO or solicitation) expected after this market research? If so, what type and when?To be determined. At this point we are only attempting to better understand the rapidly evolving market. At this time, the USG is committing to nothing beyond market research unless the USG determines there is a capability worth pursuing.
19General (RFI)23.aParagraph 3.a calls the Focus Questions attachment one (1), but the attachment list shows it as Attachment 2. Can you confirm the Focus Questions file is Attachment 2?Focus questions are attachment 2. RFI document updated.
20General (RFI)23.aThe RFI says responses are due 1700 Eastern Time on 30 November 2026. SAM.gov shows 6:00 PM EST. Which time is correct?6:00 pm is deadline. 1800 EST.
21General (RFI)12.bAre there target numbers for range, speed, flight time and payload weight for the Medium Range OWA mission?Group weight table attached to RFI. Specific range needs will be decided on receipt of firm requirements. Submissions satisfying any and all ranges will be accepted for the purposes of market research.
22General / Hardware1Notice sections 2.b and 3.a. Hardware section 1.0.RFI 3.a says a response may address one, some, or all LOEs. Please confirm a respondent may also address the missions and weight group in 2.b that its system supports, and will be judged for what it covers vs. the total RFI scope.Confirmed.
23Hardware1, 31.0, 3.0Does the 6-month production-ready constraint apply to the baseline system configuration offered, or to every configuration or variant described in the response? Should vendors describe near-term variants that fall outside the 6-month window separately?Baseline configurations should be addressed with regards to production readiness. Future capabilities outside the 6 month window should not be addressed at this time.
24Hardware1.4Question 1.4 asks whether there is a "stable common control interface" and its version. Does this refer to a specific Government common control architecture or standard (for example, a Government common controller or UVC baseline), or to the vendor's own control interface and software version?Looking for common control interfaces like MavLink and others. Vendor's own control interface should be easily incorporated into a government common control architecture.
25Hardware1.19Please define "digital twin" for purposes of question 1.19. Does the Government intend a behavioral or simulation model of the air vehicle, a digital manufacturing and configuration baseline, or both?Digital Twin refers to modeling capability to either do behavioral or simulation with air vechile for compliance analysis.
26Hardware1-22.0, 2.1For the Exportability KPP, is the Government seeking a current export classification and license status, or a vendor's plan and design approach for future exportability?Being ITAR compliant is a positive attribute as systems may be saught for export.
27Hardware22.2 (Launch)Is hand launch acceptable for Group 1 systems, in addition to gravity drop, common launch tube and ground launch?Yes, hand launch acceptable.
28Hardware1RFI para 3.a; Att 2 Tab 0, item 1.1; Hardware SOO 1.0Attachment 2 lists Hardware as "Group 1/2/3 vehicles and propulsion," and the Hardware SOO seeks sUAS "including propulsion systems." May a manufacturer respond to LOE 1 with propulsion systems (engines or powerplants) only, without a complete air vehicle? If so, should the response name an air vehicle integration partner, and should the Hardware focus questions be answered for the propulsion unit?Yes, respondents can suibmit prooulsion systems only.
29Hardware11.0 ObjectiveThe SOO states that all drones and critical drone components must comply with Section 848 of the FY2020 NDAA. Does the Government consider engines and engine subcomponents (for example cylinders, crankcases, ignition and fuel systems) to be critical drone components? Is a country-of-origin listing of components expected in the response, and are components from allied NATO member countries acceptable?Yes, all items must comply with the Section 848 of the FY2020 NDAA.
30Hardware22.2 Key System AttributesThe SOO refers to "specified" nautical mile range, payload weight capacity and battery power storage requirements. Are target ranges, payload weights and loiter times available for each of the five missions, so that propulsion suppliers can size their offerings?Submit any capabilities that may meet any of the requirements in the LOE's.
31Hardware22.2; Att 2 Hardware item 1.13Is a fuel type preferred or required for any of the five missions (for example gasoline, JP-5 or JP-8 heavy fuel, diesel, or electric or hybrid power)?Liquid fuels constrained to Defense Logistics Agency (DLA) available fuels. Alternative power sources welcome.
32Hardware1 and 31.0 Objective; 3.0 ConstraintsFor a propulsion component, does "production-ready within 6 months of contract award" mean engines available for integration by the air vehicle supplier, or qualified engines delivered within a complete system? Is a qualification standard (for example endurance hours or environmental testing) expected?Yes, ready for integration in the 6 month production window.
33Hardware11.0 Objective; 3.0 Constraints; Att 2 Hardware item 1.13May a response include a developmental propulsion concept that is not yet production-ready (for example, a single-stroke engine concept with counter-rotating cranks for vertical takeoff and landing aircraft, as described in a company engine family brochure) as a clearly labeled option alongside production-ready engines? If so, how should it be described, and will it be assessed separately from the 6-month production-ready criterion?No. only looking for production ready or integration ready assets.
34Hardware11.0 Objective; RFI 2.cRFI paragraph 2.c says responses may be used to "ascertain potential market capacity." Will AFLCMC accept Hardware LOE responses from U.S. manufacturers of sUAS airframe and structural components (printed polymer frames, arms, canopies, mounts) that supply system makers, rather than complete systems? If so, may the Capacity questions (2.b) in the Focus Questions be answered per component rather than per system?Yes. Please submit focus questions per component.
35HardwareRFI 1–2; SOO 1RFI 2.c, 3.a; Hardware SOO 1.0, 2.0For a Hardware LOE offering that combines production-ready aircraft sourced from multiple manufacturers with deployable assembly, configuration, manufacturing, repair and sustainment infrastructure, component replenishment, and matched operator/maintainer and flight training, how should vendors organize the capability paper and applicable Focus Questions responses? Should the common lifecycle architecture be described once, with separate aircraft-specific performance and readiness information for each proposed configuration, and how should integrator and aircraft-manufacturer responsibilities be identified?The Government is looking for production-ready and integration read solutions and will work directly with the prime contractors. We would expect a supplier management plan for subcontractors from primes.
36HardwareSOO 1–32.0 Sustainable and Maintainable Systems / Interoperable and Adaptable Systems; 2.1 Sustainment; 2.2 Common Control Software / Open Architecture InterfaceFor an integrated offering supporting multiple aircraft manufacturers, what information should demonstrate that the common manufacturing, sustainment and training foundation can accommodate a new aircraft, payload, radio or software baseline without replacing the entire infrastructure? Please identify the expected treatment of interfaces, authorized technical-data access, configuration control, aircraft-specific tooling and parts, and corresponding updates to operator/maintainer instruction and flight-training assessments.Interface standards will accompany future firm requirements. Feel free to propose interface standards.
37HardwareSOO 1–31.0; 2.0 Rapid Fielding / Sustainable and Maintainable Systems; 2.1 Sustainment; 3.0For an integrated aircraft-and-lifecycle package, does the six-month delivery objective apply to the aircraft alone or also to the associated support infrastructure and initial operator/maintainer training? What evidence should demonstrate package readiness and sustainment performance, distinguishing existing operational production/repair results from the selected aircraft’s performance, platform-specific integration work, and remaining Government/OEM approvals?Yes, six month delivery should include Support equipment and training material. Demonstrated performance in a relevant environment e.g. operational assessment or test data.
38Hardware1-32.1 and 2.2For Mission #5, Medium Range ISR, will the Government provide threshold and objective values for operating radius (nautical miles), time on station, payload weight capacity, battery energy storage, and weather operational limits? Does "nautical mile range" refer to operating radius, total flight distance, or communications range?Group weight table attached to RFI. Specific range needs will be decided on receipt of firm requirements. Submissions satisfying any and all ranges will be accepted for the purposes of market research.
39Hardware22.1Does the "Autonomy for Swarming" KPP apply to Mission #5, Medium Range ISR? If so, what minimum autonomous coordination is expected, and would one operator controlling multiple aircraft from a single ground control station satisfy this KPP?Yes, applies to mission 5. Full autonomy expected.
40Hardware1-2Hardware section 1.0 and section 2.1, Battery Power StorageHardware 1.0 invites aircraft and propulsion systems, but 2.1 lists battery storage as a must-meet item for endurance/range. Please confirm the battery item applies to battery-electric aircraft only, and that a liquid-fuel or hybrid engine is in scope for long-range endurance, reported as fuel type/use/endurance instead of battery capacity.Yes battery applies to electric aircraft only.
41Hardware2Hardware section 2.2, LaunchHardware 2.2 lists gravity drop, common launch tube, ground launch, and VTOL. Please confirm this is a survey of methods not a requirement that one aircraft support all of them.All launch methods acceptable. A system does not have to support all launch methods.
42Hardware / Communications / Sensors13Under "Rapid Deployment" it states productoin ready systems avaiable within 6 months of contract award.
1. When is contract award estimated?No projected contract award at this time. The USG is assessing production readiness in the event of an immediate need.
43Kinetics23.2 Key System AttributesDoes the Government expect vendors to supply warheads and energetics, or will lethal payloads be Government-furnished and integrated through an interface such as CLIK?The use of USG existing or contractor developed explosive payloads is entirely dependent upon the desired effects and ability for the vendor to adapt their systems to existing capabilities. Regardless of whether the payload is vendor developed or USG provided depends upon ultimate fulfillment of the requirement and what is economically and logistically feasible.
44Kinetics23.2 (Safe and Arm)Which USAF safe and arm standard applies to the Kinetics LOE?DESR 6055.09_DAFMAN91-201, EXPLOSIVES SAFETY STANDARDS, is the definitive guide to explosive safety for the DAF. When discussing the introduction of new munitions and munition types, several other publications help to govern the design and ultimately, the approval of use for these items through the Non-Nuclear Munitions Safety Board (NNMSB). DAFI 91-2025, NON-NUCLEAR MUNITIONS SAFETY BOARD, provides guidance for approval of UON assets (Chp 6). The following guidance is also referenced and would be of good use; MIL-STD-1901A, MIL-STD-1316F, MIL-STD-882E, and MIL-STD-331D.
45Market Research11The Market Research in general does not list desired TRLs for the solutions in the 5 areas. Can you provide the TRLs or MRLs that AFLCMC is looking for?Greater than 6 TRL and greater than 6 MRL.
46Market Research Excel SpreadsheetAll TabsIf a company has several offerings for each LOE (tab) do we fill out a separate spreadsheet for each offering? How do you want us to provide an answer for the market research tabs for mutliple capability offerings?Separate spreadsheet for each offering or capability.
47Market Research Focus QuestionsFor vendors submitting multiple solutions within an LOE, should new tabs be created in the Market Research Focus Questions spreadsheet to provide AFLCMC with required information?Submit separate market research focus questions for each solution.
48Market Research Focus Questions Excel SpreadsheetComm TabQuestion 1.1"Is your system production ready, or planned to inititiate production prior to 1 January 2027?" question conflicts with HW, Comms, Sensor SOOs stating under "Rapid Deployment" it states productoin ready systems avaiable within 6 months of contract award. Does the product or service need to be production ready on 1 January 2027 or 6 months after contract award?6 months after contract award.
49RFI23.aParagraph 3.a directs vendors to complete "attachment one (1), Focus Questions." The attachment list identifies Attachment 1 as the Vendor Question Log and Attachment 2 as the Market Research Focus Questions. Please confirm vendors should complete Attachment 2 as the Focus Questions submission.RFI attachment updated. Focus questions are Attachment 2.
50RFI23.aMay a vendor responding to more than one LOE submit a single 3 to 5 page capability paper covering all addressed LOEs, or does the Government expect a separate 3 to 5 page paper per LOE?1 capabilities statement per LOE.
51RFI23.aDoes the 3 to 5 page limit include the cover page, table of contents, and any graphics or tables, or are any of these excluded from the page count?Cover page and table contents are not included in the page count. However, graphics and tables will be included in the page count.
52RFI23.aPlease confirm the maximum file size the Government can receive by email for video submissions, and whether a link to a hosted video is acceptable in lieu of an attached file.3 minute max video length. If size cannot be sent via email, a DoD SAFE drop-off link can be requested.
53RFI12.bPlease provide the Government's working definition or reference threshold for "Medium Range" and "Long Range" as used in the five missions (for example, a nautical mile range band for each).Specific range needs will be decided on receipt of firm requirements. Submissions satisfying any and all ranges will be accepted for the purposes of market research.
54RFI12.bPlease describe the intended platform role and sUAS Group for the Air Interdiction mission and the Air Launched Effects mission, including whether Air Launched Effects assumes tube or gravity launch from a host aircraft.Air interdiction equates to short range one way attack. Air launch effects could be either gravity, tube launch, or ground launch etc. there are no constraints on method of launch.
55RFIDoes the Air Interdiction Mission refer to air-to-air interceptor or "Air Interdiction" as defined in AF Doctrine Publication 3-03?Short range one way attack. Target list is group 1-3 UAS, rotary-winged aircraft, and low slow-flying fixed wing aircraft.
56RFI2Para 3.aDoes the three (3) to five (5) page capability paper limit apply to the entire submission or to each LOE addressed? Please confirm that the cover page, point of contact information, and the completed Focus Questions workbook do not count toward the page limit.1 capabilities statement per LOE should be submitted.
57RFI2Para 3.aParagraph 3.a directs respondents to complete "attachment one (1), Focus Questions." The attachment list identifies the Vendor Question Log as Attachment 1 and the Market Research Focus Questions as Attachment 2. Please confirm that respondents should complete Attachment 2, including the Cover tab and each applicable LOE tab.Focus questions are attachment 2. RFI document updated.
58RFI1Para 2.a and 2.bWhich of the five LOEs apply to each of the five missions? Does the Government anticipate separate awards for each LOE, or awards for integrated systems that combine multiple LOEs (for example, a platform, its common control software, and its communications) for a given mission?Both. It will be based-on future needs. We may have requirements for integration of sub-systems in addition to complete systems.
59RFI2-3Para 3 and Para 4Paragraph 4 states that no solicitation is planned, while the SAM.gov notice is posted as a Presolicitation. Please share the anticipated acquisition approach for any follow-on effort (for example, FAR-based contract, Other Transaction Authority, or Commercial Solutions Opening), any anticipated set-aside, and the applicable NAICS code, which the SAM.gov notice does not list.To be determined. At this point we are only attempting to better understand the rapidly evolving market. At this time, the USG is committing to nothing beyond market research unless the USG determines there is a capability worth pursuing. The DAF may share this market research with other agencies.
60RFI2Para 3.aWill the Government accept a single response from a team (a prime with partners) addressing one or more LOEs? If so, should the team submit one Focus Questions workbook or one per team member?1 capabilities statement per LOE should be submitted.
61RFI2Para 3.a and 3.bDoes the three (3) minute video limit apply per submission or per LOE? For software capabilities, may respondents selected for oral presentations conduct a live software demonstration over MS Teams in addition to the submitted video?Yes, per LOE. No live demonstrations unless selected for oral presentation.
62RFI1-21 and 4Recognizing that no solicitation is currently planned, can the Government share whether a follow-on acquisition for Mission #5, Medium Range ISR, is anticipated? If so, what acquisition approach is under consideration (e.g., a Commercial Solutions Opening, an Other Transaction agreement, or a FAR-based competitive contract), and is a small-business set-aside being considered?To be determined. At this point we are only attempting to better understand the rapidly evolving market. At this time, the USG is committing to nothing beyond market research unless the USG determines there is a capability worth pursuing.
63RFI Market Research - 20262aCould AFLCMC please confirm whether vendors that interested in responding to multiple LOEs should submit only one (1) submission? Similarly, if vendors have different products across UAS groups, should all products be included in the response or should separate responses be submitted for each product?1 capabilities statement per LOE should be submitted. 1 capabilities statement per product.
64SensorsGeneral questionLink16: Is Link 16 a waveform of interest?Yes, among others.
65SensorsGeneral questionOur team is bringing a subset of the overall requirements. Will the Air Force share our content, along with content from other participants, to help evaluate potential teaming opportunities?
If so, will you provide a distro D statement?Submissions will not be shared with other respondents.
66SensorsGeneral questionDo you have an interoperability requirement with any fielded radios? If so, what are those radios, and are any of them requiring type 1 or high assurance links?Potentially, with TACP systems. No requirement for Type 1 or HA links, but cyber and anti-tamper hardening is a positive attribute.
67SensorsGeneral questionIs there a timeline or road map for Airforce implementation of the 5 missions?No timeline at this moment. Timeline will be addressed as future needs are devoloped.
68SensorsGeneral questionIs there an NSA certification requirement for any of the missions?No requirement. Cyber and anti-tamper hardening is a positive attributes.
69Sensors / Communications2 of Att 53 of Att 5BLOS: Beyond Line of Sight (BLOS) is called out in the sUAS COMMUNICATIONS SOO as well as in the Att: 2 Communications Questionnaire (Question 1.5), and Att 5: Sensor Statement of Objectives. Are you specifically referring to SATCOM capability or to another BLOS communications method such as airborne relay, for example?Either SATCOM or airborne relay with high fidelity and broadband capabilities.
70Software25.0The Software SOO lists an Interface Control Document and/or Government Reference Model as GFI. Will any of this GFI be made available during the market research phase, or only under a future solicitation?Only under future solicitations.
71Software11.0 ObjectiveThe Software SOO lists Group 2 and Group 3 platforms. Are software and AI autonomy solutions for Group 1 sUAS also in scope?Yes, in-scope.
72Software12.a / 2.bCan the Government clarify the mapping between the five LOEs and the five missions? Are vendors expected to address specific LOE-mission pairings, or may responses address cross-cutting capabilities (e.g., software autonomy applicable to multiple missions)?Responses may address cross-cutting capabilites.
73Software12.a (2)For the Software SOO, what are the key objectives regarding collaborative autonomy, multi-agent coordination, swarming, and multi-vendor interoperability? Are there specific performance metrics, standards (e.g., MOSA, UCI), or open architecture requirements outlined?Describe the swarming and interoperability capabilities along with software standards compliance in response.
74Software23.aThe RFI requires a 3-5 page unclassified capability paper plus responses to Attachment 1 Focus Questions. If addressing multiple LOEs, how should the capability paper be structured, and is there a preferred format or page allocation per LOE?1 capabilities statement per LOE should be submitted.
75Software12.aAre there expectations for Modular Open Systems Approach (MOSA) compliance, standardized interfaces/APIs for integrating with third-party hardware, sensors, or other LOE solutions in the Software SOO?Describe the (MOSA) compliance, standardized interfaces/APIs in the capabilities statement.
76SoftwareAtt. 2Focus QuestionsAttachment 2 (Market Research Focus Questions) is referenced but not detailed in the main RFI. Are there specific focus areas related to software scalability, multi-domain operations, or AI/ML maturity levels that vendors should prioritize in responses?Please reference RFI attachment. One set of focus questions should be submitted for each product that meets the 6 month production rediness requirement or that can be integrated into a system in the 6 month requirement window.
77Software1Para 1.0The Software SOO addresses Group 2 and Group 3 platforms, while the Hardware, Communications, Sensors, and Kinetics SOOs also include Group 1. Is the Government interested in software that supports Group 1 platforms, or software that scales across Groups 1, 2, and 3?Yes, group 1 can be included.
78Software1-2Para 1.0 and Para 4.0Paragraph 1.0 requires software to be deployable within 6 months of award; Paragraph 4.0 requires it to be production-ready within 6 months. Please define the readiness criteria the Government will apply to software (for example, technology readiness level, flight test history on a representative platform, or an existing Authority to Operate). Will the Government consider software that meets these criteria through integration and test activities completed within the 6-month period?Describe the software’s 6-month readiness level in the capabilities statement
79Software1Para 1.0Will the Government consider responses from software integrators that deliver integration, development, test, and sustainment of Government-owned or third-party autonomy and command and control software across multiple sUAS platforms, or only responses from vendors that own a proprietary software product?Yes, software integrators can submit.
80Software2Para 3.2, Common Control SoftwareThe revised Attachment 4 posted 02 November 2026 added "to include mission planning software" to the Common Control Software KSA. Please confirm that mission planning software is within the scope of the Software LOE, and identify any existing Air Force mission planning or ground control station baseline the common control software is expected to integrate with or replace.Yes, and describe the common control software integration in the capabilities statement.
81Software2Para 3.2 and Para 5.0Focus Questions items Hardware 1.4 and Software 1.2 and 1.4 ask whether the system has a stable common control interface and its version. Please identify the specific common control standard, interface specification, or Government reference architecture (and version) the Government intends. Will the Interface Control Document and/or Government Reference Model listed as GFI in Paragraph 5.0 be available to respondents before 30 November 2026 (for example, under a nondisclosure agreement or CUI handling procedures)?Describe the specific common control standard, interface specification, or Government reference architecture in the capabilities statement. The ICD and GRA would only be available under future solicitations.
82Software2Para 4.0, ConstraintsParagraph 4.0 requires software to be compatible, upgradable, and integrated with existing Air Force sUAS platforms or readily adaptable. Please identify the existing Air Force sUAS platforms, ground control stations, and autopilot or flight controller baselines the Government considers in scope.Describe the existing standards, compatibilities and adaptability in the capabilities statement.
83Software2Para 3.1, Autonomy for SwarmingPlease clarify the scope of the Autonomy for Swarming KPP. Should respondents address swarms of a single vendor's platforms, heterogeneous swarms from multiple vendors under common control, or both? Please also identify any target swarm size or operator-to-vehicle ratio, and the expected autonomous behavior when communications are degraded or denied.Describe the swarm capabilities in the capabilities statement.
84Software2Para 3.2, Open Architecture InterfacePlease describe the Government's anticipated data rights and software licensing preferences (for example, Government Purpose Rights, delivery of source code, or commercial licenses). Should respondents describe their proposed data rights posture in the RFI response?Open to all data rights situation. Please describe your software's proposed data rights posture.
85Software1Para 3.1, CybersecurityPlease identify the anticipated cybersecurity authorization path for fielded sUAS software (for example, RMF Authority to Operate, continuous ATO, or a specific Air Force software factory or DevSecOps platform) and any required cybersecurity standards or CMMC level.IATT and ATO, depending on the systems with or without radio/SATCOM capabilities. MPCs must be taken into consideration WRT connectivity. Cybersecurity standards are being developed, but cyber hardening and anti-tampering are highly favored attributes.
86SoftwareItems 2.b.1 to 2.b.7, CapacityThe capacity questions request production rates by unit. How should Software LOE respondents answer these items (for example, N/A, number of platform integrations per period, or software deployment capacity)?Repond with software deployment capacity.
87Software / Communications12.aDoes the Software SOO or Communications SOO address requirements for edge-based processing, operation in communications-contested or denied environments, and resilience without cloud dependency for autonomy functions?Describe the ability to operate in denied space in the capabilities statement.
88Software / Hardware12.aDoes the Government encourage or allow teaming arrangements or partnerships between software providers and hardware/sensor manufacturers in responses to this RFI? If so, how should such teaming be reflected in the capability paper and Focus Questions?Describe the teaming arrangement or partnership as part of the capabilities statement for the relevant LOE.
89Software / HardwareSoftware p. 2; Hardware p. 3Software Para 3.2; Hardware Para 2.2, Common Control SoftwareBoth the Software and Hardware SOOs include a Common Control Software KSA. Does the Government intend for a common control and autonomy software layer under the Software LOE to integrate across platforms acquired under the Hardware LOE? If so, will Hardware LOE vendors be expected to provide interface documentation and integration support to the software provider?Yes, integration and ICD would be expected to be provided.
90Software / Kinetics / Sensors12.bFor missions involving Air Launched Effects, Air Interdiction, and Medium Range ISR, what level of autonomy (e.g., human-on-the-loop vs. human-in-the-loop) and sensor-to-shooter timeline compression is anticipated in the relevant SOOs?Describe the ability in the capability statement.
91Software / SensorsSoftware p. 2-3; Sensors p. 3Software Para 6.0; Sensors Para 4.0Software Paragraph 6.0 lists eight items, including a development schedule, risk management plan, cybersecurity plan, sustainment plan, exportability plan, and cost estimate. Sensors Paragraph 4.0 requests a production readiness plan and a preliminary cost estimate. Does the Government expect these items in summary form within the three (3) to five (5) page capability paper, or only in response to a future solicitation?Describe a summary in the response and would be expected only under future solicitations
92Software SOO26Software SOO Section 6 lists offeror-provided information for vendor responses, but this is omitted from all other SOOs. Could AFLCMC please confirm that prospective software vendors should prioritize their responses to address the Key Performance Parameters and Key System Attributes given the limited available space?Yes, please address KPPs and KSAs in addition to any other submission perameters.