Structure_Selection_Report_QA_Checklist_2026.pdf

PDF 204 KB Posted

Attached to
35th Avenue Multimodal Improvements
Solicitation number
26-38
Issued by
Jefferson County, Colorado

About this file

This document is a Structure Selection Report Quality Assurance Checklist developed by the Colorado Department of Transportation (CDOT) Staff Bridge Unit for use in 2026. The checklist serves as a standardized quality assurance tool to ensure comprehensive evaluation and documentation of bridge structure selection processes prior to submittal of Final Investment Reports (FIR) to the Region. The checklist requires systematic inclusion of project information spanning cover sheet documentation, executive summary, site description, design features, existing structure analysis, and vicinity mapping. Required sections include right-of-way impact assessment, traffic detour planning, constructability and construction phasing analysis, utility coordination, geotechnical and hydraulics summaries, environmental concerns documentation, and roadway design features including cross-section, vertical alignment, and horizontal alignment specifications. The checklist mandates documentation of structural design criteria, loading specifications including collision and earthquake loads, aesthetic requirements, and potential future widening considerations.

The checklist requires detailed structure selection analysis including rehabilitation alternatives, inspection summaries, load testing requirements, and comparative evaluation of superstructure alternatives such as concrete and steel girder options, along with substructure alternatives including abutment, pier, and wall configurations. Accelerated Bridge Construction (ABC) design evaluation must be included with pre-scoping ABC rating results from CDOT spreadsheet tools. Construction cost analysis for all alternatives, maintenance and durability strategies, corrosive resistance summaries, and service life enhancement strategies must be documented with tier classification. The checklist includes sections for requested variances from CDOT Structural Standards with approval notation and requires sign-off by the CDOT Staff Bridge Unit Leader or designee, confirming approval of all findings, recommendations, and design deviations prior to submission. All figures, appendices, layout drawings, typical sections, quantity summaries, and cost estimate tables must accompany the completed checklist.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Structure Selection Report QA Checklist This checklist is to serve as quality assurance of the structure selection process. The sections in the report need not be in the same order as this checklist. This checklist must be signed by Staff Bridge Unit Leader or designee prior to submittal of FIR documents to the Region.

Structure Number(s): ____________________________________________________________________

Cover Sheet ☐Name of the Project and Site Address ☐Structure Number(s) ☐Property Owner Name and Contact Information ☐Report Preparer Name and Contact Information ☐Submittal and Revision Dates as Applicable

Executive Summary ☐Project Description ☐Structure Recommendations

Site Description and Design Features ☐Existing Structure(s) ☐N/A:_____________________________ ☐Vicinity Map ☐ROW Impact ☐N/A:_____________________________ ☐Traffic Detour ☐N/A:_____________________________

☐Constructability & Construction Phasing ☐N/A:_____________________________ ☐Utilities ☐N/A:_____________________________ ☐Geotechnical Summary ☐Hydraulics Summary ☐N/A:_____________________________ ☐Environmental Concerns ☐N/A:_____________________________ ☐Roadway Design Features ☐Cross Section

☐Vertical Alignment ☐Horizontal Alignment

Structural Design Criteria ☐Design Specifications ☐Loading ☐N/A:_____________________________

☐Collision Load ☐Earthquake Load

☐Aesthetic Requirements ☐N/A:_____________________________ ☐Possible Future Widenings ☐N/A:_____________________________

Structure Selection ☐Selection Criteria ☐Rehabilitation Alternatives ☐N/A:_____________________________ ☐Inspection Summary

☐Load Testing Requirements ☐N/A:_____________________________ Add figures/sketches to the following topics as needed to clarify discussion:

☐Structure Layout Alternatives

☐Vertical Clearances ☐Horizontal Clearances ☐Skew ☐Span Configurations

☐Superstructure Alternatives ☐N/A:_____________________________ ☐Concrete Girder Alternatives

☐Steel Girder Alternatives

☐Substructure Alternatives ☐N/A:_____________________________

☐Abutment Alternatives (GRS, Integral, Semi-integral, etc.)

☐Pier Alternatives

☐Wall Alternatives ☐N/A:_____________________________ ☐ABC Design (include pre-scoping ABC rating results from spreadsheet found on the CDOT website) ☐Maintenance and Durability ☐Corrosive Resistance ☐Summary of Structure Type Evaluation Table ☐Construction Costs (including costs of alternatives)

BTE Funded Projects ☐Strategies for Enhancing Bridge Service Life Tier ☐Strategies Selected

Other Figures and Appendices ☐General Layout of the Selected Structure Alternative Typical Sections (if not provided in the report) ☐Summary of Quantities and Cost Estimate Tables ☐ABC Rating spreadsheet

List of Variances Requested Variance:____________________________________________________________________ Approved?☐Yes ☐No

Requested Variance:____________________________________________________________________ Approved?☐Yes ☐No

Requested Variance:____________________________________________________________________ Approved?☐Yes ☐No If you need more space, use an additional sheet(s) of paper. Submit all project variances as early as possible.

CDOT Staff Bridge Quality Assurance Sign-off By signing this checklist Staff Bridge Unit Leader acknowledges approval of the Structure Selection Report findings, recommendations, and all design deviations from the CDOT Structural Standards and design criteria.

Print Name Signature Date

Cover Sheet
Executive Summary
Site Description and Design Features
Structural Design Criteria
Structure Selection
BTE Funded Projects
Other
Figures and Appendices
List of Variances
CDOT Staff Bridge Quality Assurance Sign-off