Storefront_Installation_Price_Proposal_revised.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Storefront Installations: Re-Post
- Solicitation number
- 24-CR-011-A
- Issued by
- Pinellas County, Florida
About this file
The file is a price proposal spreadsheet for Storefront Installations by the Pinellas County School District in Florida, detailing five distinct storefront renovation scenarios across different school locations: Seminole Middle Media Center, Dunedin High School Media Center, Seminole Middle STEM Tech Lab, Pinellas Technical College, and Anona Elementary. The project involves installing aluminum storefront frames, various glass types (9/16" laminate impact glass or clear tempered glass), and wide-style aluminum doors with specific hardware configurations, including panic devices, door closers, and rim cylinders. The solicitation is electronically submitted through the District's e-Procurement Portal, with bids due by 3:00 pm on Monday, November 4, 2024.
The proposal includes detailed pricing breakdowns for labor rates (Glass Technician, Helper, Supervision) and material costs, with quantities varying by scenario: door quantities range from 1-5 units, glass square footage from 160-800 sq. ft., and horizontal/vertical mullion frames from 2-7 units. Labor hours are consistently structured with 4 hours for Supervision, 16-20 hours for Glass Technicians, and 4 hours for Helpers across scenarios. The pricing structure allows for a comprehensive evaluation of installation costs, with a total cost calculation for all five scenarios. Bidders are encouraged to register on the OpenGov Procurement portal to receive automatic notifications and ensure they have the most current bid documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| Labor Rates Monday -Friday 7:00-4:00 | |||||
| Line Item | Description | Rates | Unit Cost | Total | |
| 1 | Glass Technician | hour | |||
| 2 | Helper | hour | |||
| 3 | Supervision | hour | |||
| Scenario #1 Seminole Middle Media Center | Layout and erect aluminum Storefront frames to create a wall with 9/16” laminate glass and install aluminum Wide Stile Storefront Doors with Panic hardware. Typical Hardware: Panic Device (99EO)/Rim Cylinder/Handle (990NL)/ Removable Mullion (KR4954)/Door Closer (LCN4111)/Handle (990DT)/ Cylinder for the keyed removable mullion. | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | 3070 Wide Stile Aluminum Storefront Door | 5 | Each | ||
| 2 | 9/16" Impact Laminate Glass | 800 | Sq. Ft. | ||
| 3 | Horizontal -Mullion Storefron Frame | 5 | Per 24 LF. | ||
| 4 | Vertical Mullion Storefront Frame | 7 | Per 24 LF. | ||
| 5 | Hardware Cost | 1 | Bulk | ||
| 6 | Labor for Supervisor | 4 | Hours | ||
| 7 | Labor for Glass Tech | 18 | Hours | ||
| 8 | Labor for Helper | 4 | Hours | ||
| Total Scenario#1 | |||||
| Scenario #2 Dunedin High School Media Center | Lay-out and erect Clear Anodized Aluminum Storefront frames to create a wall with 7/16” clear laminate tempered glass and install Wide Stile Clear Anodized Aluminum Doors with double acting hardware. Typical Hardware: Double Acting Concealed Closer(s) (Left and Right swing for entering and exiting) | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | 3070 Wide Stile Aluminum Storefront Door | 4 | Each | ||
| 2 | 9/16" Impact Laminate Glass | 600 | Sq. Ft. | ||
| 3 | Horizontal -Mullion Storefron Frame | 4 | Per 24 LF. | ||
| 4 | Vertical Mullion Storefront Frame | 4 | Per 24 LF. | ||
| 5 | Hardware Cost | 1 | Bulk | ||
| 6 | Labor for Supervisor | 4 | Hours | ||
| 7 | Labor for Glass Tech | 20 | Hours | ||
| 8 | Labor for Helper | 4 | Hours | ||
| Total Scenario#2 |
| Scenario #3 Seminole Middle STEM Tech Lab | Lay-out and erect a Clear Anodized Aluminum Storefront frames to create a wall with 9/16” laminate impact glass and install a Wide Stile 3070 Clear Anodized Aluminum Storefront Door with panic hardware. Typical Hardware: Panic Device (99EO)/Rim Cylinder/Handle (990NL)/Door Closer (LCN4111) | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | 3070 Wide Stile Aluminum Storefront Door | 1 | Each | ||
| 2 | 9/16" Impact Laminate Glass | 160 | Sq. Ft. | ||
| 3 | Horizontal -Mullion Storefron Frame | 2 | Per 24 LF. | ||
| 4 | Vertical Mullion Storefront Frame | 3 | Per 24 LF. | ||
| 5 | Hardware Cost | 1 | Bulk | ||
| 6 | Labor for Supervisor | 4 | Hours | ||
| 7 | Labor for Glass Tech | 16 | Hours | ||
| 8 | Labor for Helper | 4 | Hours | ||
| Total Scenario#2 |
| Scenario #4 Pinellas Technical College St. Pete | Lay-out and erect an Aluminum Storefront wall and ¼” clear tempered Glass with White-out glass panels below the mid rail (wainscot) and a 3070 Wide Stile Aluminum Storefront door and hardware. Typical Hardware: Panic Device (99EO)/Door Closer (LCN4111)/Rim Cylinder | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | 3070 Wide Stile Aluminum Storefront Door | 1 | Each | ||
| 2 | 9/16" Impact Laminate Glass | 300 | Sq. Ft. | ||
| 3 | Horizontal -Mullion Storefron Frame | 2 | Per 24 LF. | ||
| 4 | Vertical Mullion Storefront Frame | 2 | Per 24 LF. | ||
| 5 | Hardware Cost | 1 | Bulk | ||
| 6 | Labor for Supervisor | 4 | Hours | ||
| 7 | Labor for Glass Tech | 17 | Hours | ||
| 8 | Labor for Helper | 4 | Hours | ||
| Total Scenario#2 | |||||
| Scenario #5 Anona Elementary Storefront Replacement | Remove existing Storefront and replace with a New Storefront frame and 9/16” laminate impact glass and install a pair of 3070 Wide Stile Aluminum Doors w/ a Keyed Removable Mullion. Typical Hardware: Panic Device (99EO)/Rim Cylinder/Removable Mullion (KR4954)/Cylinder for the removable mullion/Door Closer(s) (LCN4111)/Door Handles (990NL & 990DT) | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | 3070 Wide Stile Aluminum Storefront Door | 4 | Each | ||
| 2 | 9/16" Impact Laminate Glass | 200 | Sq. Ft. | ||
| 3 | Horizontal -Mullion Storefron Frame | 3 | Per 24 LF. | ||
| 4 | Vertical Mullion Storefront Frame | 2 | Per 24 LF. | ||
| 5 | Hardware Cost | 1 | Bulk | ||
| 6 | Labor for Supervisor | 4 | Hours | ||
| 7 | Labor for Glass Tech | 16 | Hours | ||
| 8 | Labor for Helper | 4 | Hours | ||
| Total Scenario#2 | |||||
| Total Cost for all Scenarios | Line items 1-8 | Total Cost | |||
| Scenario#1 | Items 1-8 | ||||
| Scenario#2 | Items 1-8 | ||||
| Scenario #3 | Items 1-8 | ||||
| Scenario #4 | Items 1-8 | ||||
| Scenario #5 | Items 1-8 | ||||
| Total Scenarios |
File details come from the government source that posted it. Updated .