Stockpile Access Route and Limited Areas-Port Allen SBH Temp Debris Stockple Access Route Limited Access Areas.pdf

PDF 5 MB Posted

Attached to
Port Allen Small Boat Hrbr. Hurricane Lowell Demo Debris Removal
Solicitation number
B27000606
Issued by
Hawaii

About this file

This is a project site map for the Port Allen Small Boat Harbor demolition and debris removal project in Eleele, Kauai, Hawaii, prepared in response to Hurricane Lowell damage. The document provides a visual representation of the temporary debris stockpile area, access routes, and limited access zones required for the debris removal operation. The map designates specific areas for debris handling, including a temporary debris stockpile location with harbor access, defined haul routes for debris transportation, and limited access zones where the boat ramp takes priority over debris hauling activities. The project requires removal of damaged concrete sidewalks and revetment caps, as well as railings, gates, gangways, and other miscellaneous structures damaged by the hurricane.

The document establishes best management practices (BMPs) for environmental protection and operational safety during the debris removal phase. Specifically, all landside debris stockpiles must be fully surrounded by sediment filter socks and covered with plastic sheeting during non-work hours to prevent sediment migration and environmental contamination. The map identifies in-water and shoreline-adjacent debris removal areas requiring specialized handling and removal procedures. The contractor must furnish all materials, tools, equipment, and labor necessary to complete the demolition and removal work as specified in the scope of work, with coordination requirements for boat ramp permittees who maintain priority usage rights during the operation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Port Allen SBH Demolition & Debris Removal Temporary Debris Stockpile Area, Access Route, and Limited Access Areas

Legend

300 ft

N ➤➤N Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

Finn McCall Callout

TEMP. DEBRIS STOCKPILE AREA AND HARBOR ACCESS

Finn McCall Polygon

Finn McCall Callout

ACCESS AND DEBRIS HAUL ROUTE

Finn McCall Polygonal Line

Finn McCall Callout LIMITED ACCESS AREA. USE OF BOAT RAMP AND TRAVERSING TO HAUL DEBRIS ONLY; NO STOCKPILING OR STAGING IN THIS AREA

Finn McCall Polygon

Finn McCall Callout

BOAT RAMP PERMITTEES HAVE PRIORITY USE OVER DEBRIS HAULING

Finn McCall Callout

IN-WATER & SHORELINE-ADJACENT DEBRIS REMOVAL AREA

Finn McCall Line

Finn McCall Polygonal Line

Finn McCall Line

Finn McCall Callout

REMOVE DAMAGED CONC. SIDEWALKS/REVETMENT CAP

Finn McCall Polygonal Line

Finn McCall Callout

REMOVE RAILINGS, GATES, GANGWAYS, ETC.

Finn McCall Line

Finn McCall Callout

REMOVE RAILINGS, GATES, GANGWAYS, ETC.

Finn McCall Text Box

BMP NOTES:

1. LANDSIDE DEBRIS STOCKPILES SHALL BE FULLY SURROUNDED BY SEDIMENT FILTER SOCKS AND COVERED WITH PLASTIC SHEETHING DURING NON-WORK HOURS.