Photo 2-Photo 2 Pier B and Armor Stones.pdf

PDF 1 MB Posted

Attached to
Port Allen Small Boat Hrbr. Hurricane Lowell Demo Debris Removal
Solicitation number
B27000606
Issued by
Hawaii

About this file

This is a photograph supporting documentation for a demolition and debris removal project at Port Allen Small Boat Harbor in Eleele, Kauai, Hawaii, managed by the State of Hawaii. The image, labeled Photo #2, depicts Pier B's floating dock system and displaced armor stones resulting from Hurricane Lowell damage. The project scope requires complete removal and disposal of the floating docks, including all attached components such as pipe, conduit, dock boxes, power pedestals, rope, and Seaflex cables, with helical anchors to remain in place. Additionally, displaced armor stones located at depths of 10 feet or less must be relocated to the toe of the breakwater structure. The work encompasses furnishing all materials, tools, equipment, and labor necessary to demolish and remove all in-water and shoreline-adjacent debris, damaged piers, vessels, and miscellaneous debris as specified in the proposal documents, scope of work, specifications, and related addenda.

No specific pricing terms, set-asides, response dates, or award information is provided in this photograph. The documentation serves as visual reference material for bidders to understand the physical conditions and demolition requirements at the harbor facility affected by Hurricane Lowell.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finn McCall Text Box

JOB NO. KA26-02

PORT ALLEN SMALL BOAT HARBOR DEMOLITION & DEBRIS REMOVAL

ELEELE, KAUAI, HAWAII

PHOTO #2: PIER B FLOATING DOCK & DISPLACED ARMOR STONES

Finn McCall Callout REMOVE & DISPOSE FLOATING DOCKS INCL. ATTACHED PIPE, CONDUIT, DOCK BOXES, POWER PEDESTALS, ROPE, AND SEAFLEX CABLES; HELICAL ANCHORS SHALL REMAIN IN PLACE

Finn McCall Callout RELOCATE DISPLACED ARMOR STONES AT DEPTH OF 10' OR LESS TO TOE OF BREAKWATER STRUCTURE

Finn McCall Line

Finn McCall Line

Finn McCall Line

Finn McCall Line