Photo 3-Photo 3 Pier A and B conc sidewalk asphalt.pdf
PDF 1 MB Posted
- Solicitation number
- B27000606
- Issued by
- Hawaii
About this file
This is a photograph documentation file for the Port Allen Small Boat Harbor Hurricane Lowell Demolition and Debris Removal project in Eleele, Kauai, Hawaii (Job No. KA26-02). The photo, labeled Photo #3, depicts Piers A and B and specifies the demolition and removal requirements for the affected structures and materials. The project involves removing and disposing of floating docks including attached piping, conduit, dock boxes, power pedestals, rope, and Seaflex cables, with helical anchors to remain in place. Additionally, the scope includes removal and disposal of concrete sidewalks and delaminated asphalt, as well as existing railings and gangway components. Metal components are to be cut flush to the concrete surface and painted with corrosion-resistant paint prior to completion.
This photograph serves as a supporting exhibit for the broader demolition and debris removal contract, which requires contractors to furnish all materials, tools, equipment, and labor necessary to address in-water and shoreline-adjacent debris, damaged piers, vessels, and miscellaneous debris at the harbor caused by Hurricane Lowell. The visual documentation provides bidders with specific site conditions and demolition priorities to inform their proposals and cost estimates.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Finn McCall Text Box
JOB NO. KA26-02
PORT ALLEN SMALL BOAT HARBOR DEMOLITION & DEBRIS REMOVAL
ELEELE, KAUAI, HAWAII
PHOTO #3: PIERS A & B, CONC. SIDEWALK, ASPHALT
Finn McCall Callout REMOVE & DISPOSE FLOATING DOCKS INCL. ATTACHED PIPE, CONDUIT, DOCK BOXES, POWER PEDESTALS, ROPE, AND SEAFLEX CABLES; HELICAL ANCHORS SHALL REMAIN IN PLACE
Finn McCall Line
Finn McCall Callout
REMOVE & DISPOSE CONC. SIDEWALK AND DELAMINATED ASPHALT
Finn McCall Line
Finn McCall Callout REMOVE & DISPOSE EX. RAILINGS AND GANGWAY. CUT METALS FLUSH TO CONC. AND PAINT WITH CORROSION RESISTANT PAINT.