This Invitation to Bid (ITB) document is issued by the Connecticut Department of Energy and Environmental Protection (DEEP) Division of Forestry for a forest road resurfacing project in Nipmuck State Forest, Union, Connecticut. The project encompasses 8,010 linear feet of Stickney Road resurfacing, beginning at the intersection with Stickney Hill Road and terminating at the Ben Arnold Field maintained by the DEEP Division of Wildlife. The scope of work includes placing and grading crushed stone in various depths and widths, replacing 15 existing culverts with larger HDPE H20 corrugated pipes, establishing proper drainage features, and improving turnout areas for parking. A pre-bid site walk is scheduled for Wednesday, April 22, 2026, at 10:00 AM at the intersection of Stickney Hill Road and Stickney Road in Union, Connecticut, with RSVP required. Bids are due by Thursday, May 7, 2026, at 3:00 PM via CT Source to the State's Monitoring Forester, James Halleran. The bid submission should include a lump sum base project price and five unit price line items covering supplied and installed materials at specified quantities: 1-1/4 inch Process Aggregate (price per 25 tons), 3-inch minus Bank Run Gravel (price per 25 tons), Modified Riprap (price per 25 tons), 4-6 inch stone (price per 25 tons), and TerraTex GS-250 geotextile fabric (price per 50 linear feet by 16 feet wide). All materials must meet Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction Form 819 2024.

The bid is not restricted by set-asides or incumbent contractor designations. Contractors must comply with all work requirements including seasonal timing restrictions for construction activities, implementation of Best Management Practices from the Natural Diversity Database determination letter regarding spotted turtle protection, and roadside vegetation management preferences for dormant season work (November 1 through March 15) or qualified herpetologist supervision during active season (March 16 through October 31). Bid submissions must include a breakdown of materials, equipment, and labor with a list of intended equipment and planned construction methodology on company letterhead with company name, address, contact information, and reference to DAS CT Source Bid Board Solicitation Number DEEP041326CM. A bid bond is not required. Contractors must make required disclosures regarding exceptions to bid requirements, status on debarment lists, occupational safety and health law violations, and arbitration or litigation matters within the preceding five years. The State reserves the right to amend, cancel, award in part, or reject any or all proposals based on misrepresentation or modification of terms and conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

209 Hebron Road • Marlborough, CT 06447 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer

Eastern District Headquarters

INVITATION TO BID

CT DEEP – STICKNEY ROAD RESURFACING PROJECT

NIPMUCK STATE FOREST – STICKNEY HILL BLOCK – UNION, CT

Introduction

The Connecticut Department of Energy and Environmental Protection (DEEP) is charged with conserving, improving and protecting the natural resources and the environment of the state of

Connecticut as well as making cheaper, cleaner and more reliable energy available for the people and businesses of the state. The agency is also committed to playing a positive role in rebuilding

Connecticut’s economy and creating jobs – and to fostering a sustainable and prosperous economic future for the state.

The Division of Forestry seeks to develop a vigorous, resilient, forest environment capable of sustaining the wide range of demands that the public places on these lands. These demands include a variety of recreational experiences, natural diversity (including threatened and endangered species), the preservation of unique sites (both geologic and archaeological), the provision of raw materials as forest products, and the maintenance of wildlife and fisheries habitats

Project Description and Scope of Work

The Connecticut DEEP Division of Forestry is soliciting quotes for a forest road resurfacing project encompassing 8,010 linear feet of Stickney Road. The resurfacing project begins at the intersection with Stickney Hill Road and terminates at the DEEP Division of Wildlife maintained

Ben Arnold Field.

The goal of this project is to resurface and reinforce the current forest road by adding gravel base, drainage features and proper width throughout. These improvements will help control erosion and keep the road viable for its intended use in the long term. Crushed stone will be placed and graded in various depths and widths. There are 15 current culvert locations along the road that will need to be dug up and replaced to improve drainage. A geo-referenced map showing the location of the project, estimated depth of new material, drainage features, and turnout locations is attached to this ITB.

CT DEEP is seeking quotes from qualified contractors to resurface the road and replace necessary drainage structures along Stickney Road. A detailed description of products to be used, equipment, methods, and estimated duration of work should be included by the contractor as part of their quote. All material used must meet State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction Form 819 2024. Coarse process aggregate required on this project shall meet specifications as per DOT Form 819

Section M.05.01. Scope of work should include all materials, labor and equipment necessary for the successful completion of the work requirements listed below.

Interested Parties

• May evaluate the treatment site at their own convenience

• Are invited to attend a pre-bid site walk/showing with the State’s monitoring forester and project supervisor. See below for pre-bid site walk details. RSVP is required.

Work Requirements

• A standard driving surface width of 16’ will be required starting at the intersection with

Stickney Hill Road and continuing to the parking area halfway up Stickney Road. The subbase for this initial length will be regraded to 18’ wide. For the remainder of the road, segments with more narrow widths will be allowed at the discretion of the State’s monitoring forester and/or project supervisor. Necessary depth has been determined by the depth needed to establish a functional crown or super-elevation on a given road segment.

• Depth of material will be determined by the depth necessary to establish a functional crown on that road segment. Depths of material will be variable along the road, ranging from 8” to 20”.

• Coarse process aggregate required on this project shall meet specifications as per DOT

Form 819 Section M.05.01 -Processed Aggregate Base and Pavement.

• For large depressions that exist, the contactor shall use material that meets the specifications as per DOT Form 819 Section M.02.02 to bring these areas to appropriate grade.

• Any standing water/mud shall be removed from any of the “existing depressions” at time of construction. This material can be left on site at the field direction of the Project

Supervisor.

• Suggested order of operations:

o Remove all organic material (leaves, debris, brush, trees) from the drainage ditches.

▪ If necessary, re-shape and grade drainage ditches for appropriate drainage to the applicable culvert. All drainages should be cleared, and water should flow away from culvert ouflows o Remove existing culverts, dispose of old culvert material, and replace all culverts with HDPE H20 corrugated pipe with smooth interior.

▪ Replacement culverts should be sized larger than the existing culverts by one size rating (i.e. 12” culvert replaced with a 15”, 15” culvert replaced with an 18”, 18” culverts replaced with 24” etc.).

▪ Side-by-side, or double culverts will not be used. If replacing a side-by-side culvert with a single pipe, sum the diameters of the two side-by-side culverts and replace to increase by one size rating.

▪ Culvert Requirements:

• Culverts shall be bedded in a minimum of 6” base of 1-1/4” process aggregate, if rock is encountered it shall be excavated to not less than 12 inches below the bottom of the pipe, and this depth shall be refilled and compacted with 1-1/4” process. The trench width shall be double the diameter of the pipe. The pipe shall be backfilled and compacted every 6” lift, a minimum of 12” cover to accomplish load rating.

▪ Culverts will consist of one 20-foot section, an appropriately sized coupler, and an additional 10-foot section to ensure enough span to cross the road, with some overhang on the outflow side. Some culverts could reach 3 lengths of 20’ sections (60’). Changing the angle of pipe could allow better flow.

▪ Culvert outflows will be cleaned of organic material, graded for drainage away from the road and lined with 4”-6” angular stone.

▪ For culverts which carry streams, the vendor is responsible for coordinating permitting with the DEEP Engineering & Field Support

Services Engineering Unit. Contractor is responsible for any dewatering for culvert installation.

o Rough grade the entire road including removing boulders / ledge where necessary.

▪ Rough graded roads should be appropriately crowned or superelevated, so water effectively drains to the roadside drainage ditches.

▪ All rough graded road work should be compacted at the end of each day.

Especially before rain.

▪ Where the road is appropriately wide, boulders unearthed during excavation should be re-purposed and strategically placed to prohibit vehicles from accessing the roadside drainage ditches.

o Install 1 ¼” processed aggregate to the desired depth identified on the RFP and

Reference Map, or until the appropriate crown height is attained as directed by the

Project Supervisor.

▪ Prior to utilization of processed aggregate, the contractor will submit the name/location of the gravel pit where their material will be coming from for prior approval by Project Supervisor. DEEP may request a sample (5-gallon bucket) to ensure the aggregate meets DOT specs.

▪ If large depressions exist in the road, the contractor shall use 3-inch minus

Bank Run Gravel or approved equal to establish a base prior to resurfacing with 1 ¼” over the base. Depressions should be compacted in 6” lifts.

▪ If the roadbed is underlain by seasonally wet soils, geotextile fabric should be installed according to manufacturer’s recommendations, prior to installing the 1-1/4” process aggregate, as field directed by Project

Supervisor.

o Grade the road to achieve a functional crown which results in the centerline of the road being 6-8” higher than the edges and will adequately shed water to the roadside drainage ditches. DEEP can occasionally approve water bars and/or broad-based dips to allow water to shed across the road.

o Shallow water bars will be installed as followed (please refer to included diagram):

o Compact the road by rolling with a 10-ton vibratory roller.

o Install culvert marker posts (4”x4” diameter PT posts) (4 per culvert) and reflectors (2 reflectors per post). If boulders are not onsite 6”-8” highway posts with reflectors will be installed.

• Several turnout areas have been identified along the road. These areas will be improved and have acceptable hard base and space for parking vehicles.

• The road will be closed to the public during construction. DEEP will be responsible for public notice. The contractor will be responsible for any road barriers and signage.

• Contractor will implement and follow any Best Management Practices suggested in the

Natural Diversity Database (NDDB) determination letter for this project. An addendum was added to the final determination letter to specifically describe work requirements related to spotted turtle. More information on Best Management Practices included below:

o Roadside vegetation management

▪ Dormant season work preferred (November 1 – March 15).

▪ If work must be conducted in the active season, a qualified herpetologist must sweep the project area for spotted turtle (March 16 – October 31).

▪ Sweeping not required for dormant season roadside vegetation management o Culvert replacement

▪ Culverts in suitable overwintering habitat – replacement should be done during the active season with exclusionary fencing and sweeping to ensure turtle do not enter the work area (March 16 – October 31).

▪ Culverts outside of suitable overwintering habitat – replacement should be done during the dormant season (November 1 – March 15).

o Low traffic road surfaces should use Cape Cod-style curbing or no curb alternatives to allow animals to cross road unimpeded.

o Do not use road surfaces and side slopes that will mimic sandy nesting areas for females.

o Exclusionary fencing be at least 20 inches tall and must be secured to and remain in contact with the ground and be regularly maintained (at least bi-weekly and after major weather events) to secure any gaps or openings at ground level that may let animal pass through.

o Prior to construction, all turtles occurring within fencing work area will be relocated to suitable habitat outside disturbance area. This should be performed by a qualified professional familiar with habitat requirements and behavior of the species.

o The Contractor must search the work area each morning prior to any work being done.

o All construction personnel working within the turtle habitat must be apprised of the species description and the possible presence of a listed species.

o Any turtles encountered within the immediate work area shall be carefully moved to an adjacent area outside of the excluded area and fencing should be inspected to identify and remove access point. These animals are protected by law and no turtles should be relocated from the site.

o In areas where silt fence is used for exclusion, it shall be removed as soon as the area is stable to allow for reptile and amphibian passage to resume.

o Special precautions must be taken to avoid degradation of wetland habitats including any wet meadows and seasonal vernal pools.

Pre-Bid Site Meeting:

Wednesday, April 22nd 2026, at 10am

Meeting Location:

Intersection of Stickney Hill Road and Stickney Road in Union, CT. (41°58'56.8"N

72°11'27.1"W)

Bids Due:

Bids are due to CT Source / DEEP monitoring forester by Thursday, May 7th 2026, at 3pm. A bid bond is not requested.

Questions may be directed to the State’s Monitoring Forester

Bids must be submitted via CT Source

DEEP monitoring forester contact:

James Halleran – Forester 1 – 166 Chestnut Hill Road, Stafford Springs, CT 06076 –

475-213-0975 - James.halleran@ct.gov

Bids should include the following:

Present Bid/Quote on Company Letterhead including Company Name, address, contact name, phone number and email.

Reference DAS CT Source Bid Board Solicitation # DEEP041326CM

Project Information:

Invitation to Bid

CT DEEP – Stickney Road Resurfacing Project

Nipmuck State Forest – Stickney Hill Block – Union, CT

Base Project - Lump Sum

Breakdown of material, equipment and labor, include list of intended equipment and planned construction methodology.

Unit Price #1 - Price per 25 Ton of approved 1-1/4 inch Process Aggregate supplied and installed.

Unit Price #2 - Price per 25 Ton of approved 3” minus Bank Run Gravel supplied and installed.

Unit Price #3 - Price per 25 Ton of approved Modified Riprap supplied and installed.

Unit Price #4 – Price per 25 Ton of approved 4”-6” stone supplied and installed.

Unit Price #5 – Price for TerraTex GS-250, supply and install 50 linear feet x 16’ wide road.

Vendor selection criteria:

The vendor will be selected through a competitive bid process.

Terms and Conditions:

By submitting an application in response to this Invitation to Bid, an applicant implicitly agrees to comply with the following terms and conditions:

a) Equal Opportunity and Affirmative Action. The State is an Equal Opportunity and Affirmative

Action employer and does not discriminate in its hiring, employment, or business practices. The

State is committed to complying with the Americans with Disabilities Act of 1990 (ADA) and does not discriminate on the basis of disability in admission to, access to, or operation of its programs, services, or activities.

mailto:James.halleran@ct.gov

b) Preparation Expenses. Neither the State nor the Agency shall assume any liability for expenses incurred by a proposer in preparing, submitting, or clarifying any proposal submitted in response to this Invitation to Bid.

c) Exclusion of Taxes. The Agency is exempt from the payment of excise and sales taxes imposed by the federal government and the State. Proposers are liable for any other applicable taxes.

d) Freedom of Information Act. All information submitted in a proposal or in response to a request for additional information is subject to disclosure under the Connecticut Freedom of

Information Act as amended and judicially interpreted. A proposer's responses may contain financial, trade secret or other data that it claims should not be public (the "Confidential

Information"). A proposer must identify specifically the pages and portions of its proposal or additional information that contain the claimed Confidential Information by visibly marking all such pages and portions. Provided that the proposer cooperates with DEEP as described in this section, the DEEP shall, to the extent permitted by law, protect from unauthorized disclosure such Confidential Information. If the DEEP receives a request for a proposer's Confidential

Information, it will promptly notify the proposer in writing of such request and provide the proposer with a copy of any written disclosure request. The proposer may provide written consent to the disclosure or may object to the disclosure by notifying DEEP in writing to withhold disclosure of the information, identifying in the notice the basis for its objection, including the statutory exemption(s) from disclosure. The proposer shall be responsible for defending any complaint brought in connection with the nondisclosure, including but not only appearing before the Freedom of Information Commission, and providing witnesses and documents as appropriate.

An Invitation to Bid is not an offer. Neither this Invitation to Bid nor any subsequent discussions shall give rise to any commitment on the part of the State or the Agency or confer any rights on any proposer unless and until an agreement is reached by the necessary parties.

Required Disclosures:

In its Proposal Form each proposer must disclose, if applicable:

• Its inability or unwillingness to meet any requirement of this Bid, including but not limited to any of the Terms and Conditions noted herein;

• If it is listed on the State of Connecticut’s or United States Government (including any agency thereof) Debarment List;

• If it is ineligible, pursuant to Conn. Gen. Stat. § 31-57b, to be awarded the bid because of occupational safety and health law violations;

• All resolved and pending arbitration and litigation matters in which the proposer or any of its principals (regardless of place of employment) has been involved within the last five (5) years;

A proposer’s acceptability based on these disclosures lies solely in DEEP’s discretion. A failure to disclose or an inaccurate response shall, in DEEP’s sole discretion, be grounds for disqualification.

Reservation of Rights:

The Agency reserves the right to amend or cancel this Invitation to Bid on any date and at any time, if the Agency deems it to be necessary, appropriate, or otherwise in the best interests of the

State.

a. No Acceptable Proposals. In the event that no acceptable proposals are submitted in response to this Invitation to Bid, the Agency may reopen the procurement process, if it is determined to be in the best interests of the State.

b. Award and Rejection of Proposals. The Agency reserves the right to award in part, to reject any and all proposals in whole or in part, for misrepresentation or if the proposal limits or modifies any of the terms, conditions, or specifications of this Invitation to Bid. The Agency may waive minor technical defects, irregularities, or omissions, if in its judgment the best interests of the State will be served. The Agency reserves the right to reject the proposal of any proposer who submits a proposal after the submission date and time.

ACKNOWLEDGEMENT

In submitting this Proposal Form, the undersigned proposer acknowledges that the price(s) include all labor, materials, transportation, hauling, overhead, fees and insurances, profit, security, permits and licenses, and all other costs to cover the completed work called for in the

ITB. Except as otherwise expressly stated in the ITB, no additional payment of any kind will be made for work accomplished under the price(s) as proposed.

Invitation to Bid

CT DEEP – Stickney Road Resurfacing Project

Nipmuck State Forest – Stickney Hill Block – Union, CT

REQUIRED DISCLOSURES

1. Exceptions to the Bid

☐This proposal does not take exception to any requirement of the Bid, including any of the Contract Terms set forth in the ITB.

or

☐ This proposal takes exception(s) to certain of the ITB requirements, including the following Contract Terms set forth in the ITB. Attached is a sheet fully describing each such exception.

2. State Debarment List. Is the proposer on the State of Connecticut’s or the Federal

Government’s Debarment List? If answer is yes, please explain and state if the matters are pending or resolved.

☐ Yes ☐ No

3. Occupational Safety and Health Law Violations. Has the proposer or any firm, corporation, partnership or association in which it has an interest (1) been cited for three

(3) or more willful or serious violations of any occupational safety and health act or of any standard, order or regulation promulgated pursuant to such act, during the three-year period preceding the proposal (provided such violations were cited in accordance with the provisions of any state occupational safety and health act or the Occupational Safety and

Health Act of 1970, and not abated within the time fixed by the citation and such citation has not been set aside following appeal to the appropriate agency or court having jurisdiction) or (2) received one or more criminal convictions related to the injury or death of any employee in the three-year period preceding the proposal?

☐ Yes ______ ☐ No

If “yes,” attach a sheet fully describing each such matter.

4. Arbitration/Litigation Has either the proposer or any of its principals (regardless of place of employment) been involved for the most recent five (5) years in any resolved or pending arbitration or litigation or received any civil or criminal penalties?

☐ Yes ______ ☐ No

If “yes,” attach a sheet fully describing each such matter.

NOTE: THIS DOCUMENT, IN ORDER TO BE CONSIDERED A VALID PROPOSAL,

MUSTBE SIGNED BY A PRINCIPAL OFFICER OR OWNER OF THE BUSINESS ENTITY

THAT IS SUBMITTING THE PROPOSAL. SUCH SIGNATURE CONSTITUTES THE

PROPOSER'S REPRESENTATIONS THAT IT HAS READ, UNDERSTOOD AND

FULLY ACCEPTED EACH AND EVERY PROVISION OF EACH DOCUMENT

COMPROMISING THE ITB, UNLESS AN EXCEPTION IS DESCRIBED ABOVE.

___________________________ TITLE _____________________________ (PRINT NAME)

_____________________________ DATE _____________________________ (SIGNATURE)

N

This proposal does not take exception to any requirement of the Bid including any of: Off
This proposal takes exceptions to certain of the ITB requirements including the: Off
are pending or resolved: Off
Yes_2:
If yes attach a sheet fully describing each such matter: Off
No_2: Off
Yes_3:
If yes attach a sheet fully describing each such matter_2: Off
No_3: Off
TITLE:
PRINT NAME:
DATE:
0:

File details come from the government source that posted it. Updated .