This is Addendum No. 3 to the bid documents for the Town of Watertown's Steele Brook Greenway project, State Project No. 0153-0125, a Federal Aid Project (PEDS 255), issued on December 17, 2025. The addendum updates the bid form specifications and clarifies bidder questions regarding specific line items in the contract. The project encompasses multiple construction items including asphalt paving work with two grades of Hot Mix Asphalt (HMA S0.5 and HMA S0.375), joint and crack sealing of bituminous concrete pavement, and drainage infrastructure consisting of a drywell, catch basin, concrete footings, abutment and wall concrete, and concrete pads. The addendum specifically addresses Item No. 0406238 (Material for Tack Coat—560 gallons) and Item No. 040699A (Asphalt Adjustment Cost), both of which lacked clarity or pricing information in previous bid documents.
The addendum establishes an estimated cost of $5,500.00 for the Asphalt Adjustment Cost line item (Item 0406999A) and provides unit price fields for all previously incomplete items, requiring bidders to submit written unit prices for HMA materials, sealing work, tack coat material, drainage infrastructure, and concrete work. The document does not include explicit pricing terms, set-asides, funding sources, or contract renewal information within the addendum itself, as it functions solely as a clarification document incorporating bidder question responses into the contract specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33552_Jan_27_26_solicitation_doc.pdf | ||
| Steel Brook 153-125_Front-End updated 11-18-25.pdf | ||
| Steel Brook 153-125 Addendum 4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 3 December 17, 2025
Addendum 3
TOWN OF WATERTOWN
Steele Brook Greenway
State Project No. 0153-0125
Federal Aid Project PEDS (255)
ADDENDUM NO. 3
The following information is hereby made part of the contract drawings and specifications for the State Project Number 153-125 Steele Brook Greenway, Federal Aid Project No. PEDS (255) dated July 2025.
SPECIFICATIONS:
Page 3 of Bid Form has been updated.
Estimated price included for Asphalt Adjustment Cost.
Description and written unit price field provided for Item No. 0406238.
BIDDER QUESTION ANSWERS:
The answers to following bidder questions are hereby incorporated into the contract documents:
Question 6: Item 0406238 – 560 Gal Description says #N/A - please advise.
Answer 6: The item is Material for Tack Coat and has been corrected with Addendum 3.
Question 7: Item 040699A – 1 EST Asphalt Adjustment – no dollar amount on bid pages – please advise.
Answer 7: The estimated cost has been provided with Addendum 3.
EST. QTY. UNIT DESCRIPTION AND WRITTEN UNIT PRICE UNIT PRICE AMOUNTITEM NO.
0406171 510.00 TON
HMA S0.5 at
_________________________________ dollars and ________________cents per ton
0406172 490.00 TON
HMA S0.375 at
_________________________________ dollars and ________________cents per ton
0406194 229.00 L.F.
JOINT AND CRACK SEALING OF BITUMINOUS
CONCRETE PAVEMENT at
_________________________________ dollars and ________________cents per linear foot
0406238 560.00 GAL
MATERIAL FOR TACK COAT at
__________________________________dollars and _________________cents per gallon
0406999 A 1.00 EST.
ASPHALT ADJUSTMENT COST
at an estimated cost of
_________________________________ dollars and ________________________________cents
$5,500.00 $5,500.00
0505001 14.00 C.Y.
STRAIGHT ENDWALL at
_________________________________ dollars and ________________cents per cubic yard
0586515 A 1.00 EA.
8' DIAMETER DRYWELL - 0'-10' DEEP at
_________________________________ dollars and ________________cents per each
0586040.1 1.00 EA.
TYPE 'C-L' CATCH BASIN - 0'-10' DEEP at
_________________________________ dollars and ________________cents per each
0601062 40.00 C.Y.
FOOTING CONCRETE at
_________________________________ dollars and ________________cents per cubic yard
0601064 40.00 C.Y.
ABUTMENT AND WALL CONCRETE at
_________________________________ dollars and ________________cents per cubic yard
0601365 A 3.00 C.Y.
CONCRETE PAD at
_________________________________ dollars and ________________cents per cubic yard