This is Addendum No. 4 to the contract documents for the Town of Watertown's Steele Brook Greenway project (State Project No. 0153-0125, Federal Aid Project PEDS 255), dated December 19, 2025. The addendum addresses a specification update and incorporates answers to bidder questions regarding the contract drawings and specifications. Specifically, the addendum restores Item No. 0401441 for 1/2" preformed expansion joint filler (2.00 square feet), which was unintentionally omitted from the previous addendum. The addendum confirms that bidders must include pricing for this line item along with other materials and services including HMA S0.5 and S0.375 asphalt, joint and crack sealing of bituminous concrete pavement, tack coat material, an asphalt adjustment cost (estimated at $5,500.00), straight endwall concrete, an 8-foot diameter drywell, a Type C-L catch basin, and footing concrete.
The addendum requires bidders to provide unit prices for materials and labor as specified in the bid form, with the exception of the asphalt adjustment cost, which is listed with a fixed estimated cost of $5,500.00. This addendum is incorporated into the overall contract documents and supersedes conflicting information in prior addenda. The document does not specify response deadlines, award dates, or contract term information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33552_Jan_27_26_solicitation_doc.pdf | ||
| Steel Brook Bid 153-125 Addendum 3.pdf | ||
| Steel Brook 153-125_Front-End updated 11-18-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 4 December 19, 2025
Addendum 4
TOWN OF WATERTOWN
Steele Brook Greenway
State Project No. 0153-0125
Federal Aid Project PEDS (255)
ADDENDUM NO. 4
The following information is hereby made part of the contract drawings and specifications for the State Project Number 153-125 Steele Brook Greenway, Federal Aid Project No. PEDS (255) dated July 2025.
SPECIFICATIONS:
Page 3 of Bid Form has been updated.
Item No. 0401441 - ½” preformed expansion joint filler added back onto sheet.
BIDDER QUESTION ANSWERS:
The answers to following bidder questions are hereby incorporated into the contract documents:
Question 6: In review the new item sheet [Addendum 3] has omitted the ½” preformed expansion joint filler?
Answer 6: The item was omitted unintentionally and has been added back with Addendum 4.
EST. QTY. UNIT DESCRIPTION AND WRITTEN UNIT PRICE UNIT PRICE AMOUNTITEM NO.
0401441 2.00 S.F.
1/2" PREFORMED EXPANSION JOINT FILLER at
_________________________________ dollars and ________________cents per square foot
0406171 510.00 TON
HMA S0.5 at
_________________________________ dollars and ________________cents per ton
0406172 490.00 TON
HMA S0.375 at
_________________________________ dollars and ________________cents per ton
0406194 229.00 L.F.
JOINT AND CRACK SEALING OF BITUMINOUS
CONCRETE PAVEMENT at
_________________________________ dollars and ________________cents per linear foot
0406238 560.00 GAL
MATERIAL FOR TACK COAT at
__________________________________dollars and _________________cents per gallon
0406999 A 1.00 EST.
ASPHALT ADJUSTMENT COST
at an estimated cost of
_________________________________ dollars and ________________________________cents
$5,500.00 $5,500.00
0505001 14.00 C.Y.
STRAIGHT ENDWALL at
_________________________________ dollars and ________________cents per cubic yard
0586515 A 1.00 EA.
8' DIAMETER DRYWELL - 0'-10' DEEP at
_________________________________ dollars and ________________cents per each
0586040.1 1.00 EA.
TYPE 'C-L' CATCH BASIN - 0'-10' DEEP at
_________________________________ dollars and ________________cents per each
0601062 40.00 C.Y.
FOOTING CONCRETE at
_________________________________ dollars and ________________cents per cubic yard
ADDENDUM 4