This Statement of Work (SOW) details a ceiling grid and panel refurbishment project for the Communications Monitoring Office and Adjacent Storage Room at the Houston Air Route Traffic Control Center (ARTCC). The project involves removing and replacing existing ceiling infrastructure in two rooms measuring 56' x 22' and 14' x 14', respectively. Specific work includes removing 32 fluorescent fixtures, 9 A/C grills, 1 speaker, 2 Wi-Fi routers, and 1 fire alarm, while preserving 12 fire sprinkler heads. The contractor will install a new suspension grid system using perimeter wall molding, main beams, cross tees, and hangers, with 2' x 2' ARMSTRONG Ceiling Tiles (1912A) or approved equivalent. Additional requirements include notching 12 ceiling panels to accommodate conduit runs, providing protective tarps, and disposing of all waste. Work is to be completed during normal business hours (Monday-Friday, 7:00 am to 5:00 pm).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 697DCK-25-R-00291 Amendment 0004.pdf | ||
| Sign in sheet 2.pdf | ||
| 697DCK-25-R-00291 Amendment 0003.pdf | ||
| Comm Room.a.zip | ZIP file | |
| 697DCK-25-R-00291 Amendment 0002.pdf | ||
| Sign in sheet.pdf | ||
| RFO 697DCK-25-R-00291.pdf | ||
| Comm Office Photos.a.zip | ZIP file | |
| Department of Labor Wage Rate TX20250253 dated 3-14-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
JCN 24012206
Refurbish Ceiling Grids and Panels in Communications Monitoring Office, B-08 & Adjacent Storage Room, B-16
Houston ARTCC, 16600 JFK Blvd Houston, Texas 77032
The existing ceiling grids and ceiling panels in the Communications Monitoring Office, B-08 and Adjacent Storage Room, B-16 need to be refurbished due aging infrastructure. The dimensions of the communications monitoring office, B-08, is 56’ x 22’. The dimensions of the adjacent storage room, B-16, is 14’ x 14’.
Between both rooms, there are 32 4’ fluorescent fixtures, 9 A/C grills, 1 speaker, 2 Wi-Fi routers and 1 fire alarm that need to be removed. These will need to be reinstalled once the new suspension grid system is in place. 12 Fire Sprinkler Heads are fixed in place and will need to remain in place while the work is being accomplished. New perimeter wall molding, main beams, cross tees, and hangers need to be installed utilizing commonly used wires which are used to support the suspension system main beams. Sections of the main beams will need to be spliced together and connected by cross tees. The ends of the main beams and cross tees are to rest on the wall molding which runs around the perimeter of each room. The ceiling panels are to be 2’ x 2’ ARMSTRONG Ceiling Tile: 1912A, 24 in x 24 in, Beveled Tegular, 9/ 16 in Grid Size, 0.8 NRC or approved equal.
Twelve ceiling panels and perimeter molding will need to be notched to accommodate conduit runs running down the walls.
Work Consists of:
1) Removal of drop ceiling grids and ceiling panels in communications monitoring room, B-08, and adjacent storage room, B-16.
2) Removal of 32 4’ fluorescent light fixtures, 9 AC Grills, 1 Speaker, 2 Wi-Fi Routers and 1 Fire Alarm. These are to be secured to be reinstalled once new suspension grid system has been installed. 12 Fire Sprinkler Heads are fixed in place and will need to remain in place while the work is accomplished.
3) Install new perimeter wall molding, main beams, cross tees, and hangers utilizing commonly used wires which are used to support the suspension system main beams.
Sections of the main beams are spliced together and are connected by cross tees. The ends of the main beams and cross tees rest on the wall molding which runs around the perimeter of each room.
4) The ceiling panels are to be 2’ x 2’ ARMSTRONG Ceiling Tile: 1912A, 24 in x 24 in, Beveled Tegular, 9/ 16 in Grid Size, 0.8 NRC or approved equal.
5) Reinstallation of all devices removed: fluorescent lighting, A/C grills, sprinkler heads, speaker, Wi-Fi routers and fire alarm.
6) Notch 12 ceiling panels along with perimeter molding to accommodate conduit running down below the drop ceiling.
7) Normal working hours will be Monday through Friday from 7:00 am to 5:00 pm.
8) If other manufactures ceiling tiles will be used other than the Armstrong Ceiling Tiles called out on #4 product data sheets will be required to be submitted for approval.
9) Tarps are to be provided to cover all the equipment in the Comm Monitoring office B-08
& adjacent Storage room B-16.
10) Disposal of all waste.