This is a Statement of Work (SOW) for the replacement of an aging Uninterruptible Power Supply (UPS) system at U.S. Coast Guard Base Portsmouth's Electronic Support Division (ESD) in Portsmouth, Virginia. The contractor must procure, deliver, install, and commission an 18 kVA / 15.0 kW UPS system with the following specifications: single-phase 208/240 VAC input (92/80 A capacity at 0.95 power factor), AC output of 120/208/240 VAC (149/84/73 A capacity), 120V DC input at 151A, and 0.400kV TVSS rating. The scope includes five distinct stages: site survey and preparation, safe decommissioning of the existing Best Power Technology Model FE18KVA/10C UPS and Maintenance Bypass Switch (MBS), installation of new equipment with an equivalent MBS, full functional testing and personnel training, and environmentally compliant disposal of legacy equipment and batteries. The work must be completed within 60 calendar days of award during standard business hours (0700-1600 EST, Monday-Friday, excluding federal holidays). Travel costs for delivery and installation are included in the contractor's overall cost.
The related solicitation (31040RFQ260000940) is a 100 percent small business set-aside using NAICS code 811210 (Electronic and Precision Equipment Repair and Maintenance) with a small business size standard of $34 million. This is a Firm-Fixed Price procurement with quotes due by 5:00 PM Eastern Time on August 12, 2026, submitted via SF-18 form to the listed contracting officer and contract specialist. A mandatory site visit is scheduled for August 5, 2026, at 10:00 AM, and written questions must be submitted by 12:00 PM EST on August 7, 2026. The contractor must provide a minimum one-year warranty on all labor and materials, comply with OSHA and EPA regulations, and coordinate with Base personnel including the Safety Officer and Environmental Protection Specialist. A Post Award Conference must be held no later than 15 business days after award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Poster SCA Poster.pdf | ||
| Wage rate determination.pdf | ||
| FAR Clauses and Deviations Services.docx | DOCX document | |
| SF-18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) | v1.0 STATEMENT OF WORK (SOW) FOR Uninterruptible Power Supply (UPS) Replacement - USCG Base Portsmouth ESD
1.0 GENERAL
1.1 Background
The U.S. Coast Guard Base Portsmouth Electronic Support Division (ESD) maintains critical mission infrastructure that requires continuous, reliable power. The current Uninterruptible Power Supply (UPS), a Best Power Technology Model FE18KVA/10C, has aged and reached the end of its lifecycle. This project addresses the need to replace the old unit to ensure safe, uninterrupted operations for base personnel and equipment.
1.2 Scope
This Statement of Work (SOW) defines the requirements to procure, deliver, install, and commission a new 18 kVA / 15.0 kW Uninterruptible Power Supply (UPS) system and an associated Maintenance Bypass Switch (MBS). All work will be executed at U.S. Coast Guard (USCG) Base Portsmouth, Electronic Systems Detachment (ESD). The comprehensive scope encompasses site preparation, safe decommissioning of the existing UPS and MBS infrastructure, installation of the new hardware, full functional testing, and the environmentally compliant disposal of the legacy system and batteries.
1.3Objective This solicitation seeks a qualified contractor to perform a comprehensive replacement of the UPS at USCG Base Portsmouth ESD. The resulting system shall be fully integrated into the existing electrical topology, ensuring seamless power backup. All work shall be completed smoothly, safely, and in compliance with all electrical and environmental regulations.
2.0 APPLICABLE DOCUMENTS
The following documents provide specifications, standards, or guidelines that must be complied with:
Relevant USCG regulations/standards regarding electrical construction and environmental protection: Base Portsmouth Environmental Policy, Base INST 5100-5105.
National Electrical Code (NEC) / NFPA 70.
All Manufacturer instructions and safety data sheets of products and equipment used by the contractor.
3.0 SPECIFIC REQUIREMENTS/TASKS
3.1 Stage 1: Site Survey and Preparation
Verify existing electrical infrastructure, physical footprint, and room cooling capacities prior to installation.
3.2 Stage 2: Decommissioning
Safely disconnect and remove the existing Best Power Technology (Model: FE18KVA/10C) UPS and all associated internal/external battery cabinets. Disconnect and remove the Maintenance Bypass Switch (MBS).
3.3 Stage 3: Installation
Furnish and install and integrate the new UPS system. The new equipment must meet or exceed the following baseline specifications to ensure compatibility with existing infrastructure:
Capacity: 18 kVA / 15.0 kW, 60 Hz AC Input: Single Phase, 208/240 VAC (Capacity: 92/80 A, Power Factor: 0.95) AC Output: 120/208/240 VAC (Capacity: 149/84/73 A) DC Input: 120V, 151A TVSS Rating: 0.400kV (or modern equivalent) Equivalent Maintenance Bypass Switch (MBS) to support the system installation. Must match the primary input/output nominal voltage of the system.
3.4 Stage 4: Testing & Commissioning
Perform full functional testing, load testing, and startup procedures per manufacturer guidelines.
Provide familiarization training for USCG ESD personnel on standard operation, bypass procedures, and alarm acknowledgement.
3.5 Stage 5: Clean-up and Disposal
Dispose of the legacy UPS and all batteries in accordance with local, state, and federal regulations (e.g., EPA, DOT for hazardous materials) at no additional cost to USCG.
Remove all debris and restore the site to its original clean condition.
4.0 CONTRACTOR PERSONNEL
4.1 Employee Conduct & Identification
Contractor employees must carry valid government or state-issued identification and comply with all Government regulations.
4.2 Security
Contractors without a Real ID must present acceptable credentials (e.g., RAPIDGate, TWIC, DoD ID). All contractors requiring Base access will be pre-vetted prior to commencement of work.
5.0 OTHER APPLICABLE CONDITIONS
5.1 Period of Performance
The period of performance must not exceed 60 calendar days from the date of award.
5.2 Place of Performance
USCG Base Portsmouth, Electronic Support Division (ESD), 4000 Coast Guard Blvd, Portsmouth, VA 23703.
5.3 Hours of Operation
0700 and 1600 EST, Monday through Friday (except Federal holidays).
5.4 Travel
Travel is required for delivery and installation and shall be included as part of the overall cost.
5.5 Post Award Conference
The Contractor must attend a Post Award Conference with the COR no later than 15 business days after the date of award.
6.0 DELIVERABLES
| ITEM |
| SOW REFERENCE |
| DELIVERABLE / EVENT |
| Acceptance Criteria |
| 1 |
| 5.5 |
| Post Award Conference |
| NLT 15 Days after award |
| 2 |
| 3.2 |
| Decommissioning |
| Old UPS and batteries safely removed |
| 3 |
| 3.3 |
| Installation of New UPS |
| Equipment installed meeting 18 kVA/15kW specifications |
| 4 |
| 3.4 |
| Testing & Training |
| System passes functional tests; personnel trained |
| 5 |
| 3.5 |
| Disposal Documentation |
| COR visual inspection and receipt of valid recycling/disposal certificates |
7.0 SECURITY/SAFETY & ENVIRONMENTAL
All contractors shall abide by federal safety regulations as published by OSHA. Written notification must be provided to the Base Safety Officer Kelvin Smith (Kelvin.k.Smith@uscg.mil) for operations affecting fire or explosion capabilities. Contractors shall also abide by EPA regulations. Copies of Material Safety Data Sheets and permits must be provided to the Environmental Protection Specialist prior to starting work.
8.0 WARRANTY
The contractor must provide a minimum one (1) year warranty on all labor and materials.