Statement of Work eCMS.pdf
PDF 219 KB Posted
- Attached to
- Support Services for Migration from eCMS to new NAVFAC construction management application
- Solicitation number
- N3943025R0014
About this file
This Statement of Work (SOW) details NAVFAC's requirement for a contractor to support the transition from the electronic Construction Management System (eCMS) to a new construction management application. The primary objective is to assist with migrating over 20,000 user accounts and 5,000 project records from the current Azure Cloud-hosted eCMS to a new vendor's environment, with an initial six-month performance period and potential extensions up to 12 months total.
The SOW outlines four distinct project phases: Discovery, Configuration Translation, Data Migration, and Deployment Support. Key contractor deliverables include comprehensive database documentation, data and user account migration scripts, and detailed documentation of eCMS user security roles and project hierarchies. The contractor will provide Tier 3 support, guide the new vendor through the eCMS application and database, and maintain eCMS readiness to redeploy if the new application fails. The project begins on 30 September 2025, with the contractor required to work cooperatively with NAVFAC, the eCMS Change Control Board (CCB), and the new vendor to ensure a smooth transition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA Bridge_eCMS_Redacted.pdf | ||
| N3943025R0014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eCMS Statement of Work (SOW)
Charles Lindsey June 12, 2025
Table of Contents
1. Overview
1.1. Introduction
1.2. Scope/Objective
2. Definitions/Acronyms
2.1. Definitions
3. Project Schedule
4. NITC Responsibilities
4.1. Deliverables
4.2. Schedules And Timelines
5. Mutual Responsibilities
5.1. Technical Review Meetings
6. Change Management Process
6.1. Problem Identification
6.2. Change Initiation
6.3. Impact Estimation
1. Overview
1.1. Introduction
This Statement of Work (SOW) outlines the tasks required for a contractor to provide support to NAVFAC to transition from eCMS to a new construction management application. This transition shall include transitioning the current eCMS data to the environment of the new vendor. eCMS has over 20,000 users and manages more than 5,000 projects. To preserve functional continuity for the Command, NAVFAC requires that a contractor work cooperatively and effectively with the new vendor for an initial time period of six months, with possible extensions of two additional three month periods, beginning on 30 September, 2025.
1.2. Scope/Objective
The primary objective of this Statement of Work (SOW) is for the contractor to assist with the migration of data and user accounts. Additionally, the contractor will provide documentation for the eCMS database, user roles, and security measures. They will also offer support for any reported Tier III issues related to eCMS.
1.3. Four Phases of Tasking
This bridge has four distinct phases that divide the requested tasks into the following categories.
• Discovery
• Configuration Translation
• Data Migration
• Deployment Support
1.3.1. Discovery
Discovery is the period during which the Contractor shall work with NAVFAC, the eCMS CCB and the new vendor to assist the new vendor to fully understand the Command hierarchy, eCMS system requirements, configurations and reporting, including templates, workflows and the security matrix. The Contractor shall document the User Security and Project Roles within eCMS. The documentation will include all roles and provide a description of each roles and the effect on the user experience within the application. The document shall include a description of the echelons used within eCMS, currently HQ, Regional and Local. The Contractor will provide a listing of all of the elements of the echelons and the local field offices also.
1.3.1.1. Database Documentation
The contractor shall provide database documentation based on the following:
A. Data Definition Language (DDL) Scripts
B. Entity-Relationship Diagram(s) (ERD) C. Table Descriptions – this includes relations and columns, primary keys, attributes and relations
a. Name
b. Purpose
c. Column List w/Data Type
d. Constraints
e. Primary Keys
f. Foreign Keys
D. Index Documentation E. Constraints Documentation F. Stored Procedures and Function Documentation
1.3.1.2. System Configuration
A. Describe system roles and responsibilities
a. Describe system permissions
B. Describe workflows, templates, forms C. Guide new vendor through eCMS application D. Guide new vendor through eCMS database E. Guide new vendor through eCMS database
a. DBA assigned with daily one-hour meeting for 2 weeks with new vendor
1.3.2. Configuration Translation
Configuration Translation is the period during which the Contractor shall work with NAVFAC, the eCMS CCB and the new vendor to assist the new vendor to match various elements of eCMS including eCMS workflows, project structures, and role-based access control and reporting needs.
1.3.3. Data Migration
Data Migration is the period during this extension when the Contractor shall work with NAVFAC, the eCMS CCB and the new vendor to migrate eCMS data, including eCMS user accounts from the eCMS environment in the NAVFAC Azure Cloud to the new application environment in a phased manner. Activities include developing the migration scope, preparing and processing the eCMS data, executing test migrations, and validating data integrity. During this period, the Contractor shall develop a plan of data migration that will minimize the time to conduct the final data migration and turnover to the new application. This data includes the NAVFAC Command hierarchy, all project data and their related content, including drawings. The developed method shall be tested in the new application Acceptance environment prior to use in the new application Production environment.
1.3.4. Deployment Support
1.3.5. Deployment Support is the period during which the Contractor shall have eCMS ready to redeploy to the field if the new application fails catastrophically.
Alternatively, during the Deployment Support period, the Contractor shall provide support to the new vendor with problems related to data or configuration. The Contractor shall provide application support during business days and hours (8:30 am – 5 pm EST).
The contractor shall document the User Security and Project Roles within eCMS.
The documentation will include all roles and provide a description of each roles and the effect on the user experience within the application. The document shall include a description of the echelons used within eCMS, currently HQ, Regional and Local.
The contractor will provide a listing of all of the elements of the echelons and the local field offices also.
1.3.6. Deployment Support
Support for eCMS will follow the following scheme:
Tier 1 Basic help desk resolution and service desk delivery Tier 2 In-depth technical support Tier 3 Expert product and service support
The contractor shall provide Tier 3 support for eCMS. This support shall include eCMS application and database problems, application configuration, menu and other display problems. NITC will address Tier 1, Tier 1 and Tier 3 problems that the eCMS project team directly relates to the eCMS application and database server environment, as well as networking problems within the Navy/Marine Corps Intranet (NMCI), Navy ONE-Net (OCONUS Enterprise Network) and the NAVFAC Azure Cloud.
The contractor shall provide application support during business days and hours (8:30am-5pm EST).
Any aspect not addressed in this Statement of Work (SOW) is outside the scope and not included in these services. Either party may submit a Change Request to the other party.
2. Definitions/Acronyms
2.1. Definitions
Terms used in this document shall have following meanings:
Acceptance of Deliverable
Notification from NITC to contractor, reviewed by the responsible ITSM, indicating that the Deliverable has been evaluated and satisfies the Acceptance Criteria of each Deliverable
Deliverables
Any services, documentation, and scripts, including SQL scripts provided by the contractor to NAVFAC and NITC.
3. Project Schedule The initial period of performance is 6 months. NAVFAC retains an option to extend 6 additional months in 3 month increments. The potential total extension could be no less than 6 months and will be no more than 12 months.
4. NITC Responsibilities
NITC will manage the Project
NITC and the contractor shall closely monitor key milestones
NITC is responsible for developing and maintaining scheduling details
NITC shall present the status of the schedule to the contractor weekly
4.1. Deliverables
The contractor shall prepare and deliver the following to NAVFAC:
Deliverable #1 — Database Documentation
Provide database documentation that describes in detail the structure of the eCMS database. The documentation will be as follows:
Data Definition Language (DDL) Scripts Entity-Relationship Diagram(s) (ERD) Table Descriptions – this includes relations and columns, primary keys, attributes and relations o Name o Purpose o Column List w/Data Type o Constraints o Primary Keys o Foreign Keys
Index Documentation Constraints Documentation Stored Procedures and Function Documentation
Deliverable #2 — eCMS Data Migration
The contractor will provide tested and documented scripts that will be a portion of the process to transfer eCMS data to the new system.
Deliverable #3 — eCMS User Account Migration
The contractor will provide tested and documented scripts that will be a portion of the process to transfer eCMS user account to the new system.
Deliverable #4 — User Security and Project Roles Documentation
Provide documentation that describes in detail the user security and project roles within eCMS, so that a similar user structure can be configured within the new system. This will include a layout of the eCMS NAVFAC Command hierarchy and echelons currently in use within eCMS.
4.2. Schedules And Timelines
Deliverable Schedule
Discovery Configuration Data Migration Deployment Support
30 days after Award TBD TBD TBD
• Describe system roles and responsibilities
• Describe system permissions
• Describe workflows, templates, forms
• Guide new vendor through eCMS application
• Guide new vendor through eCMS database
• Database Documentation
• Guide new vendor through eCMS database
DBA assigned with daily one-hour meeting for 2 weeks with new vendor
Map eCMS elements to related elements within new application
• Database
• Security and
Project Roles
• Workflows
• Reports
• User Interface
• Migration Scope
• Preparing and Processing the eCMS data
• Executing Test Migrations
• Validating Data Integrity
• Tier 2 and Tier 3 Support for eCMS
• Application
• Database
5. Mutual Responsibilities
5.1. Technical Review Meetings
NITC will conduct technical review meetings with the contractor within 5 days of the award of this contract. During this meeting NITC will review the project scope, proposed activities and the individual objectives and outputs that the contractor will produce. NITC will schedule weekly meetings with the contractor on a day and time that both the contractor and NITC agree to.
6. Change Management Process.
No change is permitted to the project scope, the project budget, the schedule unless a request for change is first submitted in writing and approved by the project team.
6.1. Problem Identification
The following people may initiate changes to the project:
The contractor The ITSM Project team members Other project stakeholders, including the Customer, Planning, Design and
Construction (PDC) Directorate
6.2. Change Initiation
All requests for change must be submitted in writing to the TO project manager who will log and track each request for review and evaluation.
6.3. Impact Estimation
The project manager is responsible for analyzing the change requests for impact to schedule, budget, risk, and quality. The project team will determine whether the change request will be approved, approved with modifications, rejected, or deferred.
7. COR Designation
The Contracting Officer’s Representative (COR) for this task order is Mariah Mitchell, (805-982-4914); mariah.e.mitchell2.civ@us.navy.mil.
The Technical Contracting Officer’s Representative (TCOR) for this task order is Charles Lindsey, (805-982-5991); charles.r.lindsey.civ@us.navy.mil.
File details come from the government source that posted it. Updated .