This is a Statement of Work (SOW) for paving repair services at US Coast Guard Air Station San Francisco. The contractor shall conduct paving repairs around the PSU Building and outside the PSU Boathouse, with work performed in accordance with applicable codes and OSHA safety standards. Work must be completed between 7:00 AM and 5:00 PM, Monday through Friday, excluding Federal Holidays, unless otherwise authorized by the Contracting Officer.
The contractor's scope includes four primary tasks: (1) Pre-Work Site Preparation & Safety—inspecting the work location, verifying dimensions, protecting adjacent structures, and implementing OSHA-compliant safety measures; (2) Concrete Trip Hazards—demolishing and disposing approximately 34'x5', 12'x1.5', 18'x12', and 16.5'x7' concrete sections, preparing subbase, installing rebar, forming and pouring 4" concrete (approximately 519.5 square feet), applying broom finish, and grinding tripping hazards (approximately 4 linear feet); (3) Concrete Paving Install—demolishing and disposing approximately 1,142 square feet of existing pavement, preparing subbase, installing rebar, forming and pouring 7" concrete (approximately 1,142 square feet), applying broom finish, and applying patchback hot mix asphalt 1 foot off new concrete; and (4) Final Cleanup—removing debris accumulated during work. Prior to commencing work, the contractor must submit a key personnel list to the Contracting Officer for prior approval before facility entry. The government will provide electricity, parking, and laydown area as available, but bathroom facilities will not be provided. Contractor vehicles must have valid registration and insurance with licensed operators. All work is subject to Government inspection, and the contractor must perform or re-perform unsatisfactory work at its own expense. Technical Points of Contact are LT Matthew Stickell (ASSF) and LT Alexander Whitaker (PSU-312).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| STATEMENT OF WORK - Amended.pdf | ||
| Paving Repair Solicitation - Amended.pdf | ||
| Air Station Paving Question and Answers - Final.pdf | ||
| BASE ACCESS FORM.xlsx | XLSX spreadsheet | |
| Paving Repair Photos.pdf | ||
| Paving Repair Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PAVING REPAIR AT US COAST GUARD AIR STATION SAN FRANCISCO
PART 1 - GENERAL
a. Air Station San Francisco requires repair of various paving locations around the base, primarily centered around the sidewalk around the PSU building and the pavement outside the PSU boathouse. Paving repair outside of boathouse shall be able to support constant traƯic of heavy vehicles and trailer boats.
b. The intent of this Statement of Work (SOW) is to have the contractor conduct paving repairs around the PSU Building and outside the PSU Boathouse at Air Station San Francisco. Work shall be performed in accordance with applicable codes and OSHA safety standards.
PART 2 - FACILITY AND SECURITY REQUIREMENTS
a. Contractor vehicles must have valid registration and insurance, and vehicle operators must have a valid driver license. All personnel shall have valid photo identification.
b. The contractor shall clean up all areas after installation is complete. At completion of the project all areas shall be returned to their original condition.
c. Minimizing impact to Coast Guard operations. Work performed at San Francisco, CA shall be completed between the hours of 7:00AM and 5:00PM, Monday thru Friday (excluding Federal Holidays) unless authorized by the Contracting OƯicer.
PART 3 - GOVERNMENT FURNISHED MATERIAL
a. The government will provide electricity, parking, and laydown area as available from the unit. Bathroom facilities will not be available for contractor personnel.
PART 4 - TECHNICAL POINT OF CONTACT DESIGNATION
a. Technical POCs for this task are:
LT Matthew Stickell (ASSF) LT Alexander Whitaker (PSU-312)
PART 5 – TASKS
The contractor shall perform the following tasks. Prior to commencement of work, the contractor shall provide the contracting oƯicer with a key personnel list to keep on record.
These members will need prior approval before entering the facility.
a. Pre-Work Site Preparation & Safety a.1 Inspect work location, verify dimensions, protect adjacent structures, and implement OSHA-compliant safety measures.
b. Concrete Trip Hazards b.1 Demolish and dispose concrete sections (Approximately 34'x5', 12'x1.5', 18'x12', and 16.5'x7') b.2 Prepare subbase b.3 Install rebar b.4 Form and pour 4" concrete (Approximately 519.5 square feet) b.5 Apply a broom finish b.6 Grind tripping hazards (Approximately 4 linear feet total)
c. Concrete Paving Install c.1 Demolish and dispose existing pavement (Approximately 1,142 square feet) c.2 Prepare subbase c.3 Install rebar c.4 Form and pour 7" concrete (Approximately 1,142 square feet) c.5 Apply a broom finish c.6 Apply patchback hot mix asphalt 1ft oƯ new concrete
d. Final Cleanup d.1 The contractor shall remove any debris accumulated during the paving repair work.
PART 6 – ACCEPTANCE
1. All services rendered will be subject to Government inspection. The contractor shall perform or re-perform work which was not performed in a satisfactory manner, as determined by the KO, at the contractor’s expense. Inspection of work shall be performed periodically while work is being performed and prior to contractor leaving the site.
2. Completion of work under this contract will be monitored and accepted by Coast Guard Technical POCs listed in PART 4.
END