This is a Statement of Work (SOW) for paving repair services at US Coast Guard Air Station San Francisco.
The contractor shall perform paving repairs around the PSU Building and outside the PSU Boathouse, with work focused on sidewalks and pavement areas required to support heavy vehicle and trailer boat traffic. All work must comply with applicable codes and OSHA safety standards and be completed between 7:00 AM and 5:00 PM, Monday through Friday, excluding Federal Holidays, unless authorized by the Contracting Officer. Prior to commencement, the contractor must submit required payment protection documentation, a key personnel list (requiring prior approval for facility access), and a projected work schedule; a Notice to Proceed will not be issued until these submittals are accepted by the government.
The scope includes four primary tasks: (a) Pre-work site preparation and safety measures including location inspection, dimension verification, protection of adjacent structures, and OSHA-compliant safety implementation; (b) Concrete trip hazard remediation involving demolition of approximately 34'x5', 12'x1.5', 18'x12', and 16.5'x7' concrete sections, subbase preparation, rebar installation, pouring 4" concrete (approximately 519.5 square feet), broom finish application, and grinding approximately 4 linear feet of tripping hazards; (c) Concrete paving installation including demolition and disposal of approximately 1,142-1,600 square feet of existing pavement, subbase preparation, rebar installation, pouring 7" concrete, broom finish application, and applying patchback hot mix asphalt 1 foot off new concrete; and (d) final cleanup with complete debris removal from USCG property. The government will provide electricity, parking, and laydown area as available; bathroom facilities will not be provided. Technical points of contact are LT Matthew Stickell (ASSF) and LT Alexander Whitaker (PSU-312). All work is subject to government inspection with re-performance at contractor expense if deemed unsatisfactory by the Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Paving Repair Solicitation - Amended.pdf | ||
| Air Station Paving Question and Answers - Final.pdf | ||
| BASE ACCESS FORM.xlsx | XLSX spreadsheet | |
| STATEMENT OF WORK.pdf | ||
| Paving Repair Photos.pdf | ||
| Paving Repair Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PAVING REPAIR AT US COAST GUARD AIR STATION SAN FRANCISCO
PART 1 - GENERAL
a. Air Station San Francisco requires repair of various paving locations around the base, primarily centered around the sidewalk around the PSU building and the pavement outside the PSU boathouse. Paving repair outside of boathouse shall be able to support constant traƯic of heavy vehicles and trailer boats.
b. The intent of this Statement of Work (SOW) is to have the contractor conduct paving repairs around the PSU Building and outside the PSU Boathouse at Air Station San Francisco. Work shall be performed in accordance with applicable codes and OSHA safety standards.
PART 2 - FACILITY AND SECURITY REQUIREMENTS
a. Contractor vehicles must have valid registration and insurance, and vehicle operators must have a valid driver license. All personnel shall have valid photo identification.
b. The contractor shall clean up all areas after installation is complete. At completion of the project all areas shall be returned to their original condition.
c. Minimizing impact to Coast Guard operations. Work performed at San Francisco, CA shall be completed between the hours of 7:00AM and 5:00PM, Monday thru Friday (excluding Federal Holidays) unless authorized by the Contracting OƯicer.
PART 3 - GOVERNMENT FURNISHED MATERIAL
a. The government will provide electricity, parking, and laydown area as available from the unit. Bathroom facilities will not be available for contractor personnel.
PART 4 - TECHNICAL POINT OF CONTACT DESIGNATION
a. Technical POCs for this task are:
LT Matthew Stickell (ASSF) LT Alexander Whitaker (PSU-312)
PART 5 – TASKS
The contractor shall perform the following tasks. Prior to commencement of work, the contractor shall provide the contracting oƯicer with required payment protection, a key personnel list to keep on record (these members will need prior approval before entering the facility), and a projected work schedule. A Notice to Proceed shall not be issued until submittals are accepted by the government.
a. Pre-Work Site Preparation & Safety a.1 Inspect work location, verify dimensions, protect adjacent structures, and implement OSHA-compliant safety measures.
b. Concrete Trip Hazards b.1 Demolish and dispose concrete sections (Approximately 34'x5', 12'x1.5', 18'x12', and 16.5'x7') b.2 Prepare subbase b.3 Install rebar b.4 Form and pour 4" concrete (Approximately 519.5 square feet) b.5 Apply a broom finish b.6 Grind tripping hazards (Approximately 4 linear feet total)
c. Concrete Paving Install c.1 Demolish and dispose existing pavement (Approximately 1,142 square feet1,600 square feet) c.2 Prepare subbase c.3 Install rebar c.4 Form and pour 7" concrete (Approximately 1,142 square feet1,600 aquare feet) c.5 Apply a broom finish c.6 Apply patchback hot mix asphalt 1ft oƯ new concrete
d. Final Cleanup d.1 The contractor shall remove any debris accumulated during the paving repair work. All construction debris shall be removed from USCG property and disposed of properly.
PART 6 – ACCEPTANCE
1. All services rendered will be subject to Government inspection. The contractor shall perform or re-perform work which was not performed in a satisfactory manner, as determined by the KO, at the contractor’s expense. Inspection of work shall be performed periodically while work is being performed and prior to contractor leaving the site.
2. Completion of work under this contract will be monitored and accepted by Coast Guard Technical POCs listed in PART 4.
END