This is a Statement of Work (SOW) for roof replacement at three structures within Canaveral National Seashore in Florida, funded under PMIS 343942 for Hurricane Milton recovery.
The Contractor shall remove hurricane-damaged roofing systems and install new structural standing seam aluminum roofing at the Apollo District Visitor Center (3,000 SF in New Smyrna Beach), Facilities Management Building (900 SF in Titusville), and Storage Shed (300 SF in Titusville). All work must comply with International Building Code (IBC), Florida Building Code (FBC), ASCE 7-22, OSHA standards, and applicable Federal, State, and Local regulations. The aluminum roofing system must meet specific requirements: minimum 0.040" aluminum thickness, 2" seam height, 16" panel width, PVDF (Kynar 500®) finish, concealed clip fastening system, and be equivalent to PAC-CLAD Tite-Loc Plus with Florida Product Approval. The installation must meet Miami-Dade/Broward counties High-Velocity Hurricane Zone wind design requirements per IBC/FBC. Additional scope includes removing deteriorated underlayment, flashing, gutters, and fascia; installing new self-adhered waterproof underlayment (minimum 60 mil, high-temperature rated); installing new seamless K-style aluminum gutters and downspouts (6" minimum, 0.032" thickness) on the Visitor Center and Facilities Management Building; and removing and reinstalling the existing lightning protection system in compliance with NFPA 780 and UL 96A standards using corrosion-resistant aluminum or stainless steel fasteners with appropriate isolation barriers to prevent galvanic corrosion with the aluminum roof.
The Contractor must submit detailed submittals including product data sheets, Florida Product Approval documentation, manufacturer installation instructions, warranty certificates, installer certification, Accident Prevention Plan (compliant with EM 385-1-1, OSHA 29 CFR 1926, NFPA 780, and fall protection standards), Quality Control Plan, Project Schedule, Schedule of Values, Miami-Dade Notice of Acceptance, and UL 580/ASTM E1592 uplift test data. Work hours are 7:30 AM–5:00 PM Monday–Friday with no drones permitted within park boundaries. The Contractor must coordinate and pay for manufacturer-authorized field inspections during and after installation, with written confirmation required before final payment approval. Warranty requirements include minimum 20-year weathertight warranty, 30-year PVDF finish warranty, and 10-year workmanship warranty. All work must comply with National Park Service environmental protection requirements, including protection of gopher tortoises, Eastern indigo snakes, and beach mice, with immediate work stoppage and COR notification if protected species are observed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| Sol_140P5426R0019_Amd_0001.pdf | ||
| Revised_Statement_of_Work_0001.pdf | ||
| Wage_Determination.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Sol_140P5426R0019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
CANAVERAL NATIONAL SEASHORE (CANA)
Roof Replacement – Three Structures (PMIS 343942 – Hurricane Milton)
The Contractor shall provide all labor, supervision, materials, tools, equipment, supplies, transportation, and incidentals necessary to remove hurricane-damaged roofing systems and install new structural standing seam aluminum roofing systems at the following buildings:
• Apollo District Visitor Center (VC) – Approx. 3,000 SF (New Smyrna Beach)
• Facilities Management Building (FM) – Approx. 900 SF (Titusville)
• Storage Shed – Approx. 300 SF (Titusville)
1. General Requirements All work shall comply with the International Building Code (IBC), Florida Building Code (FBC), ASCE 7-22, OSHA standards, and all applicable Federal, State, and Local regulations.
The Contractor shall field verify all existing conditions, dimensions, roof areas, slopes, penetrations, flashing conditions, and substrate conditions prior to ordering materials or commencing work.
2. Scope of Work
1. Remove existing roofing systems to structural deck.
2. Remove underlayment, flashing, gutters, drip edge, and deteriorated wood fascia.
3. Replace deteriorated wood fascia (as required).
4. Install new aluminum drip edge.
5. Replace deteriorated sheathing (unit price basis).
6. Install new self-adhered waterproof underlayment.
7. Install new standing seam aluminum roof system.
8. Install new seamless gutters and downspouts (VC & FM).
9. Remove and reinstall lightning protection system.
3. Aluminum Standing Seam Roofing System
Provide:
1. Standing seam aluminum roof system
2. Minimum 0.040" aluminum
3. Minimum 2" seam height
4. 16" panel width
5. PVDF (Kynar 500®) finish or equivalent
6. Concealed clip fastening system
7. Florida Product Approved system equivalent to PAC-CLAD Tite-Loc Plus
Roof system shall be installed strictly in accordance with manufacturer’s written instructions.
4. Wind Design Requirements
Roof system shall:
1. Meet International Building Code and Florida Building Code wind requirements (Miami-Dade/Broward counties High-Velocity Hurricane Zone specifications)
2. Be installed per manufacturer-approved clip spacing
5. Underlayment
1. Self-adhered waterproof membrane, high-temperature rated (minimum 60 mil).
2. Installed in accordance with manufacturer and IBC/FBC secondary water barrier requirements.
6. Fasteners and Clips
1. Aluminum fasteners required (coastal environment).
2. Corrosion-resistant concealed clips (minimum 50 ksi).
3. Sliding clips where required for thermal movement.
4. Fastener spacing per manufacturer engineered design.
7. Gutters and Downspouts (VC & FM)
1. 6" minimum K-style seamless aluminum.
2. Minimum 0.032" aluminum thickness (SMACNA Heavy-Duty classification)
3. Sized for 10-year rainfall event minimum.
4. Aluminum fasteners.
5. Color to match roofing system.
8. Deck Inspection and Repair
1. Inspect decking after removal.
2. Replace deteriorated decking (unit price basis).
3. Re-nail deck per IBC/FBC requirements.
9. Fascia and Drip Edge Contractor shall:
1. Inspect all wood fascia for deterioration.
2. Replace deteriorated wood fascia with KDAT (Kiln-Dried After Treatment) pressure-treated lumber to improve dimensional stability and finish performance
3. Underlayment shall lap over fascia and terminate below drip edge to ensure proper water shedding and prevent moisture intrusion
4. Contractor shall isolate pressure-treated wood from aluminum components using approved barrier materials to prevent galvanic corrosion
5. Remove and replace deteriorated wood fascia with preservative-treated lumber.
6. Replace all existing drip edge with new aluminum drip edge compatible with standing seam roof system.
7. Ensure drip edge complies with manufacturer requirements and IBC/FBC.
Drip edge shall be continuous at eaves and rakes.
10. Quality Control and Closeout
1. Pre-construction and progress photo documentation.
2. Weekly status reports.
3. As-built drawings.
4. Warranty documentation.
11. Manufacturer Inspection Requirement
Contractor shall coordinate and pay for a manufacturer-authorized field inspection.
The roofing manufacturer shall:
1. Inspect installation during construction.
2. Perform final inspection upon completion.
3. Provide written confirmation that the roof was installed in accordance with manufacturer requirements.
4. Issue manufacturer warranty documentation.
Final payment shall not be approved until manufacturer inspection letter is submitted.
12. Safety and Site Requirements
1. Work hours: 7:30 AM – 5:00 PM, Monday–Friday.
2. No drones permitted within park boundaries.
3. Contractor to provide portable sanitation facilities.
4. Contractor to submit Debris Disposal Plan, Inclement Weather Plan, and Site Specific
Accident Prevention Plan.
5. Park Safety Officer retains authority to stop unsafe work.
11. Warranty Requirements
1. Minimum 20-year weathertight warranty.
2. Minimum 30-year PVDF finish warranty.
3. Minimum 10-year workmanship warranty.
12. Submittal Requirements
All submittals shall be transmitted to the Contracting Officer’s Representative (COR) for review and written approval prior to material procurement or installation.
Contractor shall submit:
1. Product data sheets (roof panels, clips, underlayment, fasteners, flashing, gutters)
2. Florida Product Approval documentation
3. Manufacturer installation instructions
4. Warranty certificates
5. Installer certification
6. Accident Prevention Plan (see below)
7. Quality Control Plan
8. Project Schedule
9. Schedule of Values
10. Miami-Dade NOA (Notice of Acceptance).
11. UL 580 / ASTM E1592 uplift test data.
Accident Prevention Plan Contractor shall submit an Accident Prevention Plan (APP) compliant with:
1. EM 385-1-1 (if applicable to NPS Region policy)
2. OSHA 29 CFR 1926
3. NFPA 780 (for lightning work)
4. Fall Protection standards
APP shall include:
1. Site-specific fall protection plan
2. 100% tie-off requirements
3. Rescue plan for fall arrest
4. Hazard communication plan
5. Heat stress management plan (Florida)
6. Hurricane preparedness plan
7. Electrical safety procedures
8. Daily Job Hazard Analysis (JHA)
9. Competent person identification
10. Scaffold plan (if used)
11. Crane/lift plan (if used)
12. Ladder safety procedures
APP must be approved by COR before mobilization.
12.9 Closeout Submittals
Prior to final payment:
1. As-built drawings
2. Manufacturers Warranty registration confirmation
3. Manufacturer inspection letter
4. Installer Warranty
5. Lightning Protection Certification
13 – Lightning Protection System (Removal, Protection, and Reinstallation)
13.1 General
Existing lightning protection systems are present on one or more of the project structures (Visitor Center, Facilities Management Building, and Shed).
The Contractor shall provide all labor, materials, supervision, testing, coordination, and certification required to remove, protect, reinstall, and recertify the lightning protection systems impacted by roof replacement activities.
All work shall comply with:
1. NFPA 780 – Standard for the Installation of Lightning Protection Systems
2. UL 96A
3. International Building Code (IBC) and Florida Building Code (FBC)
4. Section 264113 – Lightning Protection for Structures (where applicable)
13.2 Pre-Construction Documentation
Prior to roof tear-off, Contractor shall:
1. Photograph and document existing lightning protection layout.
2. Verify:
o Air terminal locations o Main conductor routing o Down conductor routing o Ground rod locations (to extent visible)
3. Confirm continuity of existing system prior to disturbance.
4. Submit coordination plan to COR prior to removal.
13.3 Removal During Roof Tear-Off
During demolition operations:
1. Carefully remove air terminals, conductors, bonding straps, fasteners, clamps, and supports necessary to complete roof replacement.
2. Do not cut, damage, or abandon grounding electrode system.
3. Protect exposed down conductors and grounding connections from mechanical damage.
4. Maintain system integrity where possible.
5. All old lightning protection cables, rods, and hardware to be returned to COR.
No conductor shall be left loose, unsupported, or unprotected at the end of any workday.
13.4 Temporary Protection
If roof work results in partial disassembly of the lightning protection system:
1. Secure conductors to prevent wind movement.
2. Maintain grounding continuity at all times.
3. Do not energize or test during incomplete configuration unless coordinated.
13.5 Reinstallation Requirements
After installation of new aluminum standing seam roof:
1. Install new lightning protection system compatible with Aluminum Roof System in full compliance with NFPA 780.
2. Air terminals shall be mounted using: (product submittal required) o Manufacturer-approved standing seam clamps, OR o Approved adhesive mounts compatible with roofing manufacturer
3. No direct penetrations through standing seam roof panels are permitted.
13.6 Galvanic Corrosion Protection
Because roofing system is aluminum:
1. Bare copper conductors shall not contact aluminum roof panels
2. Conductors shall be aluminum or fully isolated from aluminum surfaces
3. Fasteners and clamps shall be:
1. Aluminum, or
2. 316 stainless steel with non-conductive isolation barriers (e.g., nylon washers, sleeves, or coatings such as Tef-Gel)
4. All materials shall be compatible with the roof system and shall not void manufacturer warranty
5. Dissimilar metals shall be isolated in accordance with NFPA 780 and manufacturer requirements
13.7 Coordination with Roofing System
Lightning protection attachments shall:
1. Not void roof manufacturer warranty.
2. Be coordinated with roof panel seam layout.
3. Avoid interference with panel expansion and contraction.
4. Be detailed in shop drawings showing seam clamp locations.
Lightning protection shop drawings shall be coordinated with roofing shop drawings prior to fabrication.
13.8 Testing and Recertification
Upon completion of reinstallation:
1. Perform continuity testing of entire lightning protection system.
2. Engage UL-listed installer (Category OWAY or equivalent) to perform inspection.
3. Obtain UL Letter of Findings or UL Master Label certification.
4. Submit inspection report and certification to COR prior to final acceptance.
13.9 Installer Qualifications
Lightning protection installation shall be performed by:
1. UL-listed lightning protection installer.
2. Firm with documented experience on standing seam metal roofing systems.
3. Installer experienced in coastal corrosion environments.
13.10 Closeout Requirements
Prior to final payment, Contractor shall provide:
1. As-built lightning protection layout drawings
2. Test results
3. UL inspection report
4. Updated certification
5. Maintenance instructions
14 Environmental and Protected Species Requirements Contractor shall comply with all National Park Service environmental protection requirements.
• The Government will identify protected species that may be present in the work or staging areas, including but not limited to:
o Gopher tortoise o Eastern indigo snake o Beach mouse
• Contractor shall:
o Immediately stop work in the vicinity of observed protected species o Notify the COR or designated park representative o Not disturb, handle, or relocate wildlife
• Contractor shall coordinate staging and operations to avoid impacts to protected habitat
Project Site Map
VC: 7611 S. Atlantic Av. New Smyrna Beach, FL 32169
FM: 28.647089956737023, -80.70118703926083
1434 CNS Maintenance Road, Titusville, FL
Shed: 28.643432072235598, -80.62546192858241
VC
Shed
FM
Photos
VC
FM
Shed
VC Drawings
| Statement of Work (SOW) |
| CANAVERAL NATIONAL SEASHORE (CANA) |
| Roof Replacement – Three Structures (PMIS 343942 – Hurricane Milton) |
| 1. General Requirements |
| 2. Scope of Work |
| 4. Wind Design Requirements |
| 5. Underlayment |
| 6. Fasteners and Clips |
| 7. Gutters and Downspouts (VC & FM) |
| 8. Deck Inspection and Repair |
| 10. Quality Control and Closeout |
| 12. Safety and Site Requirements |
| 11. Warranty Requirements |