This is a Statement of Work (SOW) for lead-based paint (LBP) remediation services at the Santa Elena Guardhouse located at San Juan National Historic Site in Old San Juan, Puerto Rico (PMIS 352459).

The contractor must remove all deteriorated and hazardous lead-based paint from designated exterior surfaces totaling an estimated 6,188.41 square feet using approved methods such as wet scraping, chemical stripping, or abrasive removal with HEPA-filtered equipment. Work includes all painted exterior elements including siding, windows, doors, trim, eaves, soffits, porch railings, and the ceiling and walls of the outside hall on the front of the building. The scope encompasses containment and removal of lead-contaminated debris and dust in accordance with EPA and OSHA standards, cleanup and clearance testing to HUD/EPA levels, and disposal of contaminated waste per federal and state law. All work must comply with the Secretary of the Interior's Standards for the Treatment of Historic Properties and the National Historic Preservation Act, with reversible methods preferred and no original features to be removed without written approval from the Contracting Officer Representative (COR). Construction must be completed no later than 180 calendar days after the Notice to Proceed, with work hours from 6:30 a.m. to 3:00 p.m. Monday through Friday, excluding federal holidays. Payment under the single line item covers all labor, materials, equipment, tools, testing, subcontracts, mobilization and demobilization, traffic control, preparatory work, site facilities, construction management, inspections, waste disposal, permits, licenses, insurance, bonds, taxes, and all other costs necessary for project completion. Deliverables include a final clearance report by a Certified Lead Risk Assessor, post-work photo documentation, waste disposal manifests, contractor's completion statement, "as-remediated" exterior area maps, Safety Data Sheets and product data for materials used, historic material treatment logs, daily air/dust control logs, and a recommendations report for future maintenance.

View the file

Other files

File Type Posted
Sol_140P5426R0026_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
LBP_Survey_Wall_Guardhouse.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Wage_Determination.pdf PDF
Sol_140P5426R0026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAN JUAN NATIONAL HISTORIC SITE

OLD SAN JUAN, PUERTO RICO

LEAD PAINT REMEDIATION

AT SANTA ELENA GUARDHOUSE

PMIS 352459

MARCH 2026

NATIONAL PARK SERVICE

SOUTHEAST REGION

SOUTH MAJOR ACQUISITION BUYING OFFICE

TABLE OF CONTENTS

TABLE OF CONTENTS 2

BACKGROUND 3

OBJECTIVES 3

PLACE OF PERFORMANCE 3

PERIOD OF PERFORMANCE 3

DELIVERABLES 6

GOVERNMENT FURNISHED PROPERTY 7

SAFETY 7

SECURITY CONSIDERATIONS 8

TRAVEL 9

SPECIAL MATERIAL REQUIREMENTS 9

OTHER UNIQUE REQUIREMENTS & CONSIDERATIONS 9

QUALITY ASSURANCE REQUIREMENT 10

PERSONNEL 11

FACILITY PERFORMANCE 111

DELIVERY, STORAGE AND HANDLING 111

TECHNICAL REQUIREMENTS 11

ATTACHMENT A 113

ATTACHMENT B 14

BACKGROUND

San Juan National Historic Site is one of the over 400 parks of the National Park Service. It includes Castillo San Felipe del Morro, Castillo San Cristóbal, most of the city walls, the San Juan Gate and Fort San Juan de la Cruz just across the entrance to the bay. The parks mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. There are over 1.5 million visitors annually.

OBJECTIVES

Project consists of the remediation of lead-based paint (LBP) hazards at Santa Elena Guardhouse, located at the South of Castillo San Felipe. (See Attachment A). The contractor shall remove all deteriorated and hazardous lead-based paint from designated exterior surfaces only, encompassing an estimated area of 6,188.41 sq ft using approved methods such as wet scraping, chemical stripping, or abrasive removal with HEPA-filtered equipment. This includes all painted exterior elements such as siding, windows, doors, trim, eaves, soffits, porch railings, and other architectural features (includes the ceiling and walls of the outside hall on the front of the building, See Attachment B). The structure is historically significant and protected under the National Historic Preservation Act (NHPA). All work must eliminate identified LBP risks while preserving and protecting historic materials in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties.

PLACE OF PERFORMANCE

San Juan National Historic Site, NPS Calle El Campo del Morro (final), San Juan, Puerto Rico, Building: Santa Elena Guardhouse General Coordinate (18°28'05.5"N 66°07'25.3"W). (See

ATTACHMENT A)

• The Contractor may park two (2) vehicles at the Polvorin, Parking Lot. Additional vehicles must be parked off site. A non-NPS affiliated commercial parking garage is located at Doña Fela Parking Garage about 0.4 miles away.

Workdays and hours: 6:30am to 3:00 pm Monday through Friday, excluding federal holidays.

Access to jobsite and electrical panels will be gained through the Contracting Officer Representative (COR) and/or park maintenance staff.

PERIOD OF PERFORMANCE

The work in this SOW shall be completed per the following schedule:

Construction:

Construction shall not begin until the Contracting Officer has issued the Notice to Proceed.

Construction shall be completed no later than 180 calendar days after Notice to Proceed.

Scope:

The contractor shall furnish all labor, materials, supervision, equipment, testing, and disposal services necessary to perform lead-based paint remediation work. The goal is to eliminate LBP hazards while ensuring the protection and long-term integrity of historic fabric. The contractor shall ensure full containment and control of dust, debris, and waste in accordance with applicable EPA and OSHA regulations. Protection of historic exterior materials is required throughout the process. All historic exterior materials (e.g., wood trim, window sashes, decorative moldings) must be protected or, if necessary, temporarily removed and reinstalled using non-destructive means. Any surface damage caused by remediation shall be repaired with historically compatible materials.

Work includes but is not limited to:

• Inspection, documentation, and testing of LBP-identified surfaces.

• Development of a Lead Hazard Control Plan and Health & Safety Plan.

• Selection and execution of remediation methods (removal, encapsulation, enclosure) in coordination with the COR and Historical Architect.

• Dust and debris containment compliant with EPA and OSHA standards.

• Protection of adjacent finishes, visitor areas, vegetation, and archeologically sensitive zones.

• Cleanup and clearance testing to HUD/EPA clearance levels.

• Disposal of contaminated waste in accordance with federal and state law.

Preservation Considerations:

• No original features (e.g., moldings, trim, windows) shall be removed or altered without written approval from the COR.

• Reversible methods (e.g., encapsulation) are preferred.

• Work methods must minimize damage to historic finishes.

• Mechanical removal (e.g., scraping or sanding) must be conducted with HEPA-filtered tools and under controlled conditions.

• Temporary protection of surfaces (e.g., poly sheeting, foam guards) must be non-destructive.

Required Services. All construction at minimum shall be per local authority requirements and regulations.

Payment under each line item shall be full compensation for the following:

1. labor

2. materials

3. equipment

4. tools

5. testing

6. subcontracts and services

7. mobilization & demobilization

8. traffic control

9. preparatory work and operations

10. site facilities necessary for the work on the project

11. construction management and inspections

12. movement of personnel, equipment, supplies, materials, disposal of materials, and

13. incidentals to the project site

14. project closeout, punch lists, final cleanup

15. repairing all affected areas including concrete and grass of disturbed areas to its original condition and appearance

16. all costs related to fees, permits, licenses, insurance, bonds, taxes and all other costs that the contractor is to obtain and/or pay to perform the work.

17. all other work necessary for the completion of the project

The contractor shall provide all labor, tools, equipment, materials and supervision required to:

Line Item #1 Santa Elena Guardhouse: The contractor shall remove all deteriorated and hazardous lead-based paint from designated surfaces using approved methods such as controlled scraping, chemical stripping, or abrasive removal with HEPA-filtered equipment.

This includes containment and removal of all lead-contaminated debris, dust, and residues in accordance with EPA and OSHA standards. The contractor shall clean all affected surfaces to remove lead dust and prepare for repainting or encapsulation. All historic materials (e.g., wood trim, window sashes, plaster) shall be carefully protected or temporarily removed and reinstalled as needed, using non-destructive methods. Where removal of original materials is required, prior approval must be obtained from the Contracting Officer’s Representative (COR) and Historical Preservation Officer. The contractor shall repair minor surface damage caused by remediation using compatible materials as approved by the COR. All hazardous waste shall be properly contained, transported, and disposed of per federal, state, and local regulations. Refer to technical requirements and preservation specifications in the contract documents.

3. Contractor Responsibilities:

Detailed requirements and specifications:

• The contractor shall ensure that all areas contiguous to the work site remain undisturbed or are returned to original condition and operation as soon as practical.

• The contractor shall not begin construction until all the materials are available and on site and proceed continuously until the work is completed.

• The contractor shall field verify all measurements. Measurements given in this SOW are for planning purposes only.

• All materials and equipment installed shall be rated for exterior outdoor use in a salt air environment (marine).

• Fasteners (bolts, screws, nails and more) shall be replaced with stainless steel, or a corrosion resistant alternative approved by the COR.

• Wherever dissimilar metals may come in contact with each other in exterior conditions, they must be separated with an approved layer of bituminous coating, neoprene pads or other rubber-based product. In areas exposed to exterior conditions, galvanized metal or zinc plated fasteners shall not be used to anchor aluminum or copper; use stainless steel, aluminum or copper fasteners or a corrosion resistant alternative approved by the COR.

• Installed systems shall be resistant from wind loads from hurricanes.

• New equipment shall be placed in the same location as existing equipment

• The contractor shall provide traffic control (i.e. cones, flagman, signs, etc.) sufficient to prevent injury to personnel, damage to property, and allow for safe flow of traffic.

• Use vertical containment such as scaffold netting or plastic sheeting secured to the building or frame.

• Install ground covers (e.g., 6 mil plastic) to catch debris and paint chips extending at least 10 feet from work areas.

• Secure all containment against wind uplift.

• Restrict access to the remediation area to authorized personnel only.

• Install fencing, signs, or barriers to ensure public safety.

• Perform work during weather conditions that minimize dust migration.

• Use misting or wet methods at all times during scraping/removal.

• Collect and HEPA-vacuum debris daily; ensure no paint chips or dust remain on adjacent soils, paths, or vegetation.

• A final visual inspection must verify that no exterior debris remains.

• Do not apply tape or adhesives to historic finishes.

• Do not alter original profiles or materials without written approval from the COR and

Historical Architect.

DELIVERABLES

• Final Clearance Report (visual clearance by Certified Lead Risk Assessor)

• Post-Work Photo Documentation of all treated exterior surfaces

• Waste Disposal Manifests (with facility receipts)

• Contractor’s Completion Statement

• “As-Remediated” Exterior Area Map / Annotated Elevation Sketches

• SDS and Product Data for coatings, removers, and encapsulants used

• Historic Material Treatment Log (for any temporary removals/reinstallations)

• Daily Air/Dust Control Log Summary

• Final Daily Report Summary

• Recommendations Report for future exterior monitoring and maintenance (optional)

GOVERNMENT FURNISHED PROPERTY

N/A

SAFETY

Accident Prevention Program: Before the Preconstruction Meeting submit an accident prevention plan. The plan must be accepted by the NPS before any on site work can begin. The plan shall follow OSHA and project requirements. Please include the name of responsible supervisor to carry out the plan; monthly safety meetings; first aid procedures; outline of each phase of work, hazards associated with each phase and methods proposed to ensure property protection, and safety of the public, National Park Service staff and CONTRACTOR employees; training; planning for possible emergency situations; housekeeping and fire protection.

Accident Reporting: Reportable accidents, defined as death, occupational disease, traumatic injury to contractor’s personnel, NPS employees or the public, property damage of any accident in excess of $100 and fires, must be reported immediately to the Contracting Officer and park’s

COR.

Ensure that all employees are physically qualified to perform their assigned duties in a safe manner. Do not allow employees to work if their abilities are impaired. Operators of all equipment shall be able to understand signs, signals and operating instructions, and be capable of operating such equipment.

Ensure to follow:

A. First aid facilities.

B. Personnel protective equipment: Meet requirements of NIOSH and MSHA.

C. Emergency instructions, including telephone numbers and reporting instruction for ambulance, physician, hospital, fire department and park police. Place in conspicuous locations at the worksite

D. Adequate egress at all times per the Standard for Safeguarding Construction, Alteration, and Demolition Operations (NFPA 241).

E. Fall protection plan F. Hard hats for all employees.

G. Designate and post signs in all hardhat areas.

Training: Provide training for first aid and hazardous material handling and storage.

Air - Follow the recommended approach of the Sheet Metal and Air Conditioning Contractor’s National Association Indoor Air Quality Guidelines for Occupied Buildings. Conduct a building flush out before occupancy per federal requirements.

Toxic Chemicals - Avoid materials that can leach toxic chemicals into the ground water. Do not allow toxic chemicals to enter sewers or storm drains or contaminate land or any body of water.

Refer to NPS Project Sustainability Checklist for additional requirements.

Habitats - Protect natural habitats and ecological systems on facility site (as identified in the Environmental Assessment).

Noise - Minimize noise generation during construction. Operate power equipment per LOCAL noise restrictions.

Waste Management - Employ processes that ensure the generation of as little waste as possible.

Waste disposal in landfills shall be minimized. All material unsuitable for recycling must be disposed of, in a legal manner, at public or private dumping areas outside the park per federal disposal regulations. Before the scheduled Preconstruction meeting, the Contractor shall submit a draft Waste Management Plan to the Contracting Officer for approval. Develop and implement per ASTM E1609 and as required in the contract documents. The plan shall include (but not be limited to) the following:

• List of the recycling facilities, reuse facilities, municipal solid waste landfills, and other disposal area(s) to be used. Include name, location, and phone number.

• List of proposed materials to be reused or recycled.

• List of materials that cannot be recycled or reused.

• Storage and collection methods of waste and recyclables, handling procedures.

Air and Water Pollution Control - Air quality impacts are expected to be temporary and localized. To reduce tailpipe emissions, construction equipment shall not be left idling any longer than is necessary for safety and mechanical reasons. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction. Keep volatile wastes in covered containers.

Cultural Resources - An archeological monitor may be present at the work site. If archeological resources are damaged at the project site while the archeological monitor is present or absent, all work directly affecting the discovery must stop immediately, and the damage must be reported to the CO. Contractor shall move on to work on other portions of the scope that do not directly affect the archaeological discovery with the approval of the COR.

SECURITY CONSIDERATIONS

The following mitigation measures shall be implemented to minimize the impacts of construction activities with:

• Visitor Experience: The following mitigation measures shall be incorporated into the action alternatives to minimize the impacts of construction activities on the visitor experience

• Deliveries - Delivering of the materials and equipment shall occur outside visitor hours to the maximum extent. All work shall be installed per the mfg.’s recommendations.

Construction sites will be limited to the smallest feasible area. Ground disturbance and site management will be carefully controlled to prevent undue damage to vegetation, soils, and archeological resources and to minimize air, water, soil, and noise pollution.

Staging is limited in or near the construction area. Construction equipment and material storage shall be located in previously disturbed areas near the construction site. All staging areas shall be returned to pre-construction conditions once construction is complete.

Site Access - Contractor properly identified employees will be the only ones allowed on site and shall follow federal code of conduct during work hours.

Construction zones shall be fenced with approved construction barrier fencing, plastic or portable fencing, before any construction activity. The fencing shall define the construction zone and confine activity to the minimum area required for construction. Workers will be instructed to avoid conducting activities beyond the construction zone as defined by the construction zone fencing.

Parking of vehicles shall be limited to existing roads, in legally designated areas, and within approved staging area(s). Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas outside the work limits, repairing or replacing damaged trees and plants, at no additional expense to the National Park Service.

Site Disturbance - Minimize the construction limits of the project to reduce the project’s impact on the site.

TRAVEL

N/A

SPECIAL MATERIAL REQUIREMENTS

N/A

OTHER UNIQUE REQUIREMENTS & CONSIDERATIONS

Disruptions of services shall be kept to a minimum. The contractor shall coordinate with the local utility companies. All disruptions shall be arranged at least 48 hours in advance with National Park Service and must be approved by Contracting Officer.

Construction procedures will prevent accidental disruptions to facilities outside the project limits by investigation of existing utilities and protection during construction: accidental disruptions shall be remedied at no cost to National Park Service.

Hauling Restrictions - Follow all legal load restrictions in the hauling of materials. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent.

Weather Protection - When inclement weather is expected, provide temporary protection, for areas where roofing, siding, windows, doors or other enclosing elements have been removed or have not been installed. Inspect protective coverings frequently to ensure that they are functioning properly.

Project Record Drawings - Maintain one complete full-size set of contract specs and/or drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions using National Park Service standards to show actual constructed conditions.

Keep record drawings current. Certification of accuracy and completeness will be required for monthly payment requisitions. On completion of the total project, submit complete record drawings.

Cleaning - Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Thoroughly clean building interiors. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.

After NPS review is completed, incorporate comments, and submit 3 final sets of operation and maintenance data to the Contracting Officer.

Substantial Completion and Final Inspection - Submit written certification to the CO that the project, or designated portion of project, is substantially complete, and request a final inspection. Upon receipt of written request that project is substantially complete, the Contracting Officer will proceed with inspection within 10 business days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.

When work is determined to be substantially complete, a list of deficiencies ("Punch List") to be corrected before final acceptance might be prepared. The Contracting Officer will issue a Letter of Substantial Completion. If work is not determined to be substantially complete, the Contracting Officer will notify the contractor in writing. After completing work, the contractor shall resubmit certification and request a new final inspection. If the Contractor fails to complete the work within an established time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs per the Inspection of Construction clause of the contract.

Acceptance of the work - After all deficiencies have been corrected, the Contracting Officer will issue a Letter of Final Acceptance.

QUALITY ASSURANCE REQUIREMENT

The contractor shall develop and maintain a quality program to ensure services are performed per commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance per the statement of work. All new equipment must conform to the manufacturer’s instructions and guidelines for installation and start-up.

While performing work, the contractor shall follow the latest applicable versions of the following:

• Federal, state and local codes, standards and policies for Environmental Protection Authority requirements.

• Occupational Safety and Health Administration (OSHA) requirements.

• Shall meet Secretary of Interior Standards for Historic Preservation and be in compliance with Section 106 National Historic Preservation Act (NHPA)

• NPS Reference Manual 10A and 10B

The quality of all work shall be the responsibility of the Contractor. Testing, if required, shall be the responsibility of an independent testing laboratory. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.

PERSONNEL

Contracting Officer: TBD

Contracting Officer Representative (COR): TBD

Park Facility Manager: TBD

FACILITY PERFORMANCE

All work performed shall follow applicable laws, regulations, and NPS policies and guidelines, http://www.nps.gov/dscw/laws-policies.htm.

All work shall be installed per the manufacturer’s recommendations. When Contract Documents require compliance with manufacturer’s printed instructions, provide one complete set of instructions to Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

DELIVERY, STORAGE AND HANDLING

If units are shipped via commercial freight, open crates and inspect each slab in the presence of the driver. Note any and all damage, and do not accept shipment if damage is present. Claims due to shipping damage must be submitted to the freight carrier.

Handle, transport and store units to prevent damage to materials or structure. Handle with care to prevent damage to corners and edges.

Delivery.

Provide the following to CO or their representative for approval.

TECHNICAL REQUIREMENTS

• Use vertical containment such as scaffold netting or plastic sheeting secured to the building or frame.

• Install ground covers (e.g., 6 mil plastic) to catch debris and paint chips extending at least 10 feet from work areas.

• Secure all containment against wind uplift.

• Restrict access to the remediation area to authorized personnel only.

https://www.nps.gov/dscw/upload/ReferenceManual10A_April2001_110817_AF.pdf https://www.nps.gov/orgs/1804/upload/ReferenceManual10B_Nov2009_V508.pdf http://www.nps.gov/dscw/laws-policies.htm

• Install fencing, signs, or barriers to ensure public safety.

• Perform work during weather conditions that minimize dust migration.

• Use misting or wet methods at all times during scraping/removal.

• Collect and HEPA-vacuum debris daily; ensure no paint chips or dust remain on adjacent soils, paths, or vegetation.

• A final visual inspection must verify that no exterior debris remains.

ATTACHMENT A

Attachment B

BACKGROUND
OBJECTIVES
PLACE OF PERFORMANCE
PERIOD OF PERFORMANCE
DELIVERABLES
Final Clearance Report (visual clearance by Certified Lead Risk Assessor)
Post-Work Photo Documentation of all treated exterior surfaces
Waste Disposal Manifests (with facility receipts)
Contractor’s Completion Statement
“As-Remediated” Exterior Area Map / Annotated Elevation Sketches
SDS and Product Data for coatings, removers, and encapsulants used
Historic Material Treatment Log (for any temporary removals/reinstallations)
Daily Air/Dust Control Log Summary
Final Daily Report Summary
Recommendations Report for future exterior monitoring and maintenance (optional)
GOVERNMENT FURNISHED PROPERTY
SAFETY
SECURITY CONSIDERATIONS
TRAVEL
SPECIAL MATERIAL REQUIREMENTS
OTHER UNIQUE REQUIREMENTS & CONSIDERATIONS
QUALITY ASSURANCE REQUIREMENT
PERSONNEL
FACILITY PERFORMANCE
DELIVERY, STORAGE AND HANDLING
TECHNICAL REQUIREMENTS