This is a Statement of Work (SOW) for a flooring replacement project at USCG Station Brunswick in Brunswick, Georgia.

The project involves removing and disposing of existing finished flooring (carpet, linoleum tile, laminate flooring) and installing new luxury vinyl plank (LVP) flooring across approximately 3,802 square feet of space on the second and third floors. The scope includes removal and replacement of all cove base and baseboards, complete subfloor preparation, installation of transition strips and thresholds where different finished floors meet, and provision of attic stock (minimum 10% of total flooring quantity) for future maintenance. The flooring must be from a nationally recognized U.S. manufacturer, commercial-grade, waterproof, dimensionally stable with a minimum 30-mil wear layer, low-VOC, and carry a minimum twenty-year commercial warranty. Installation must be glued-down for commercial applications, performed by manufacturer-approved installers, and follow manufacturer specifications. The contractor must provide flooring samples with colors and patterns for USCG selection, manufacturer installation instructions, and maintenance materials and guidelines. All work must be completed with professional quality—no visible gaps or cuts—and defective flooring must be removed and replaced rather than filled with caulk.

The project is located at USCG Station Brunswick, 2 Conservation Way, Brunswick, Georgia 31520, a working military installation operating 24/7. The contract period of performance is 60 days from award, including 15 days for submittal and color/finish selection. Standard working hours are 7:00 a.m. to 4:00 p.m. Eastern Standard Time, Monday through Friday, excluding federal holidays, though coordination with the onsite representative is required for work outside these hours. The contractor is responsible for all labor, materials, equipment, and waste disposal at the contractor's expense in compliance with local, state, and federal regulations. The onsite representative is CWO Jason Smith of USCG Sector Charleston Facility Engineering. The contractor must provide a 12-month warranty on all parts and labor beyond the manufacturer's warranty, and bidders are required to field-verify existing conditions on site to determine actual dimensions and work requirements.

View the file

Other files for this federal contract opportunity

Other files attached to USCG Station Brunswick Flooring Replacement, newest first.
File Type Posted
Statement of Work Summary of Changes.pdf PDF
SF-1442.pdf PDF
STATEMENT OF WORK UPDATED APRIL 14.pdf PDF
SF-30 A00003.pdf PDF
Question and Answer Sheet (Updated April 14th).pdf PDF
SF-30 A00002.pdf PDF
Construction Clauses and Provisions.pdf PDF
Questions and Answers.docx DOCX document
SF-30 QUESTIONS AND ANSWERS POSTED.pdf PDF
SF-30 A00001.pdf PDF
SF-1442.pdf PDF
Construction Clauses and Provisions.pdf PDF
DAVIS BACON ACT WAGE DETERMINATION GA20260315.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1/8

STATEMENT OF WORK (SOW)

FOR

USCG Station Brunswick Replace Finished Floors

1.0 GENERAL

The US Coast Guard (USCG) is seeking a qualified contractor to perform a flooring replacement project at USCG Station Brunswick, 2 Conservation Way, Brunswick, Georgia. Station Brunswick is a working Coast Guard Unit and will remain open during the project.

Any dimensions or specifications provided in this statement of work or associated enclosures are approximations only. Bidders are responsible for visiting the site to field-verify existing conditions and determine actual dimensions and the nature of the work required. Failure to visit the site does not relinquish the bidder from determining the extent and scope of the work required and estimating the difficulty and cost to complete the project.

The USCG Sector Charleston Facility Engineering Officer, CWO Jason Smith, will be the USCG’s Onsite Representative for this project.

2.0 BACKGROUND

The finished flooring in various spaces at Station Brunswick has reached the end of its service life and must be replaced.

3.0 OBJECTIVES

Remove and dispose of old finished flooring and install new replacement finished flooring in select spaces at Station Brunswick.

Coordinate and expedite work to minimize the amount of time Coast Guard personnel will be displaced due to this project.

4.0 DOCUMENTATION

Enclosures (1) contains details including the approximate square footage and floor plans highlighting spaces that are included in this project.

PAGE 2/8

5.0 SCOPE

1. The Contractor shall provide all labor, materials and equipment necessary to fulfill the requirements of this contract.

2. This project includes the removal & disposal of the existing finished flooring (carpet, linoleum tile, laminate flooring, etc.), and the installation of new luxury vinyl plank (LVP) flooring in all spaces listed for each option.

3. The Contractor shall provide the Onsite Representative with a selection of samples of new LVP flooring with a variety of colors and patterns for the USCG to choose from. Selection samples shall include manufacturer’s cut sheets, literature, and product specifications.

4. Flooring used in this project shall be from a nationally recognized US manufacturer’s running line of offerings and shall be low-VOC, commercial grade, waterproof, dimensionally stable, with a wear layer of at least 30 mil and a commercial warranty of at least twenty years. The flooring manufacturer must have at least 10 years of experience in the production of the specified type of flooring material, be financially sound, have technical support for their products and the installation of them, and be capable of producing and delivering the product on time and without defects of any kind.

5. Install new LVP flooring in the areas listed in enclosure (1). The flooring installation method must be suitable for commercial-grade applications, i.e., flooring must be glued down for commercial-grade installations vs. floating installation for light-commercial or residential installations. Isolate the area of installation from the rest of the building and take care to contain all dust and fumes. Perform all work by manufacturer's approved installers, in accordance with the manufacturer's printed instructions.

Depending on the timing of contract award and execution, several spaces in the work area for this project may be undergoing renovations by other contractors, and these renovations will include the installation of floor tile in areas immediately adjacent to the areas that will be receiving new LVP flooring. Close coordination with the onsite Coast Guard representatives and other contractors will be required to ensure that both projects can proceed without undue interruption, and that the transition between the tile floor and LVP floor is completed in a professional manner.

6. Remove and replace all cove base and baseboards in all areas included in this project. The Contractor shall provide a selection of materials and colors for the Coast Guard to choose from; 4-inch cove base is preferable, but 6-inch cove base may be acceptable in certain cases, to be pre-approved on a case-by-case basis by the onsite representative. Approval of the use of a 6-inch cove base does not constitute approval of an increase in the cost of the contract. Any changes that will result in a price increase must be approved by the Contracting Officer. The joint between the new finished floor and new or existing baseboards or cove base shall

PAGE 3/8

be joint-tight with no gaps. Cove base installed in or around corners will be neat and firmly attached to the wall with no bulges or gaps. Full length pieces of cove base will be used wherever possible; cove base will not be pieced together, and small scrap pieces of cove base are not to be used.

7. Quality Assurance: The Contractor shall assure the product is appropriate for the application and environment in which it is to be installed, and that the product is merchantable for service, free of any visible and latent defects, and will perform for the purpose for which it is intended without compromise. New flooring will be brought on site and allowed to acclimate in accordance with manufacturer’s recommendations prior to installation. The installation of flooring and cove base will be neat and professional, with no visible gaps or cuts. If gaps are present, the defective flooring must be removed and replaced vs. filling the gaps with caulk.

8. Attic Stock: The Contractor shall provide a minimum of 10% total quantity of new flooring to the local maintenance staff for future replacement or patching. Attic stock shall be from the same lot and in unopened original packaging with exact matching type, size, pattern, and color.

9. Maintenance: The Contractor shall provide manufacturer’s maintenance materials, information, and guidelines for product after installation.

10. This project also includes all sub-floor preparation to ensure a professional and durable installation of the new flooring.

The Contractor assumes all responsibility for the preparation of flooring, including any inspections, skim coat layers, bead blasts, scarification, etc. of the exposed subfloor, and any other preparation that is required. The Contractor shall be responsible for ensuring appropriate subfloor preparation and condition of the subfloor prior to installation of new flooring products.

Do not install new flooring on surfaces that are unsuitable and will prevent proper installation. All substrate to receive new flooring shall be clean and dry and free of any compromising conditions that would prevent or hinder the installation of the flooring. Prepare subfloors in accordance with flooring manufacturers and adhesive manufacturers recommended instructions to ensure the proper installation of the new finished flooring. Repair holes, cracks, depressions, or rough areas using material recommended by the flooring or adhesive manufacturer. Free floor of any foreign materials and clean. Submit one copy of the manufacturer's printed Installation instructions for the flooring, including surface preparation, and recommended adhesives to the Onsite Representative.

11. Incidental work items not specifically listed in this scope, but necessary to complete the project shall be included. Examples include, but are not limited to patching holes and leveling sub-floors; removal, replacement, and installation of cove base, moldings, or trim; installing thresholds and transition strips at doorways or areas where two different finished floors meet; etc.

PAGE 4/8

6.0 COORDINATION

USCG Station Brunswick is a working military installation that is operational 24 hours per day, 7 days per week. Close coordination with the Onsite Representative and Station personnel will be required to expedite completion of this project and minimize disruption to Station operations.

7.0 WASTE DISPOSAL

Upon completion of work the Contractor shall guarantee the site is cleaned and ready for final inspection before turning back over to USCG personnel. All debris caused from the project shall be removed from government property and disposed of at the Contractor’s expense in accordance with all local, State, and Federal regulations. The Contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.

The Contractor shall comply with all local, State, and Federal environmental regulations dealing with the generation, management, storage, and disposal of solid, toxic, and hazardous wastes. The Contractor shall ensure that all wastes are properly containerized, labeled & placarded, managed, tested, stored, documented/manifested, transported, and disposed of in accordance with all applicable regulations.

The Contractor shall provide the Onsite Representative with signed and fully executed originals of all hazardous waste profiles, test results, hazardous waste manifests and/or other shipping papers, and all other required documentation.

8.0 HAZARDOUS MATERIAL/WASTE

The Contractor shall ensure that all hazardous waste generated by this project is disposed of in accordance with all local, state, and federal laws and regulations. The Contractor is responsible for preparing all disposal and shipping documentation/manifests, and container labeling, and shall provide copies of this documentation to the Onsite Representative.

9.0 WARRANTY

Provide manufacturers’ standard performance guarantees or warranties including minimum twenty-year commercial wear warranty. In addition to any manufacturer’s warranty, the Contractor shall provide a written warranty for all parts and labor for a period of 12 months from the date of project completion/USCG acceptance of work. The Contractor shall, at no additional cost to the government, make necessary replacements and/or repairs due to defective installation or unsatisfactory workmanship that becomes apparent within 12 months of the installation completion date.

PAGE 5/8

10.0 SUBMITTALS

The Contractor shall provide the Onsite Representative with:

a) A selection of samples with a variety of colors and patterns of new LVP flooring for the USCG to choose from. Selection samples shall include manufacturer’s cut sheets, literature, and product specifications.

b) One copy of the manufacturer's printed Installation instructions for the flooring, including surface preparation, and recommended adhesives.

c) Attic Stock: Contractor shall provide a minimum of 10% total quantity of new flooring to the local maintenance staff for future replacement or patching. Attic stock shall be from the same lot and in original unopened packaging with exact matching type, size, pattern, and color.

d) Manufacturer’s maintenance materials, information, and guidelines for product care after installation.

e) Signed and fully executed originals of all hazardous waste profiles, test results, hazardous waste manifests and/or other shipping papers, and all other required documentation. The Contractor shall submit a copy of the waste shipment records within one day of the shipment leaving the project site.

f) Copies of the manufacturer’s warranties as well as their own written warranty.

11.0 PERIOD OF PERFORMANCE

The contract period of performance is 60 days from the award of contract. This includes 15 days for submittal and selection/approval of color and finish options.

12.0 OPTIONS

The BASE OPTION is to replace the finished flooring in select spaces on the second and third floors at Station Brunswick. See enclosure (1) for a list of spaces, approximate dimensions, and floor plans highlighting spaces that are included in this project.

OPTION 1: N/A

13.0 PLACE OF PERFORMANCE

USCG Station Brunswick 2 Conservation Dr.

Brunswick, GA 31520

PAGE 6/8

14.0 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 7:00 am and 4:00 pm Eastern Standard Time, Monday through Friday (except Federal holidays).

However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. The Contractor shall coordinate with the Onsite Representative for all work performed outside normal business hours.

15.0 GOVERNMENT FURNISHED RESOURCES

The Government will provide all utility services required in the performance of this contract, including normal amounts of electricity and water. Electrical power is provided at existing outlets for the Contractor to operate equipment necessary in the performance of work. Hot and cold water is provided at existing sinks and outlets limited to the normal water capacity of the building. No special heating or cooling of water will be provided.

The government will not furnish any other resources to the Contractor in support of this contract.

16.0 CONTRACTOR FURNISHED PROPERTY

The Contractor shall furnish all facilities, materials, equipment, labor, and services necessary to fulfill the requirements of this contract.

17.0 CONTRACTOR PERSONNEL

The Contractor shall provide personnel with the following minimum capability:

On-site supervisor must have the ability to read, write, clearly speak, and understand English.

All Contractor personnel shall be citizens of the United States (U.S.) or legal residents who have been lawfully admitted for permanent residence into the U.S. The Contractor shall obtain signed statements from all employees and potential employees to be assigned work under this contract attesting they have been informed of these restrictions.

All Contractor personnel shall be in good health, free of any communicable diseases, and not under the influence of alcohol or drugs while performing work at this facility.

Any necessary medical certificates, exams, and treatments are at the expense of the Contractor.

The Contractor shall provide a list of names of all on-site workers to the USCG for access to the facility.

PAGE 7/8

All Contractor personnel shall present valid ID to the watch stander at the entrance to the base.

18.0 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

19.0 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Onsite Representative prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

20.0 EMPLOYEE CONDUCT

There shall be no smoking, vaping, or tobacco use in any Coast Guard building. These activities are permitted only in designated smoking areas.

Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Contractor shall ensure that Contractor employees or subcontractors understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

21.0 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

22.0 GOVERNMENT ACCEPTANCE PERIOD

The Onsite Representative will review any deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the Onsite Representative will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

PAGE 8/8

The Onsite Representative will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the Onsite Representative of the specific reasons for rejection.

The Contractor shall have 10 business days to make corrections and redeliver.

USCG Station Brunswick: Replace Finished Floors

Enclosure (1)

List of spaces requiring finished flooring replacement:

Floor Room Number/ Name ~Area (SF) 2 207 (office) 329 2 211 (hallway) 107 2 212 (hallway) 262 2 214 (berthing room) 142 2 215 (office) 144 2 216 (office) 330 2 217 (office) 94 2 218 (office) 78 3 304 (lounge) 125 3 305 (kitchen) 197 3 307 & 308 (training) 596 3 309 (hallway) 370 3 313 (berthing room) 257 3 314 (berthing room) 257 3 315 (berthing room) 257 3 316 (berthing room) 257

Total 3802

Floor plans highlighting spaces that are included in this project:

Second Floor:

Third Floor:

SOW_Replace Flooring STA Brunswick
1.0 GENERAL
2.0 BACKGROUND
3.0 OBJECTIVES
4.0 DOCUMENTATION
5.0 SCOPE
6.0 COORDINATION
7.0 WASTE DISPOSAL
8.0 HAZARDOUS MATERIAL/WASTE
9.0 WARRANTY
10.0 SUBMITTALS
11.0 PERIOD OF PERFORMANCE
12.0 OPTIONS
13.0 PLACE OF PERFORMANCE
14.0 HOURS OF OPERATION
15.0 GOVERNMENT FURNISHED RESOURCES
16.0 CONTRACTOR FURNISHED PROPERTY
17.0 CONTRACTOR PERSONNEL
18.0 QUALIFIED PERSONNEL
19.0 CONTINUITY OF SUPPORT
20.0 EMPLOYEE CONDUCT
21.0 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
22.0 GOVERNMENT ACCEPTANCE PERIOD