This is a Statement of Work (SOW) for the demolition of the Coopertown Restaurant building at Everglades National Park (EVER PMIS #350149), issued by the National Park Service Southeast Region in July 2025.

The contractor shall furnish all labor, supervision, tools, materials, transportation, equipment, and incidentals necessary to: (1) perform asbestos siding and lead-based paint abatement in accordance with 40 CFR Part 61 (NESHAP), OSHA 29 CFR 1926.1101, and Florida DEP regulations; (2) demolish the existing 1,440 square foot wood-frame structure located at 22700 SW 8th Street, Miami, FL 33194, including disposal of all debris and hazardous materials at licensed facilities with manifests and disposal records; and (3) backfill and elevate the site to a finished elevation of 9.2 feet NAVD-88 using suitable compacted aggregate fill with compaction testing and elevation verification by a licensed professional. The work includes mobilization with erosion control and safety fencing, utility disconnection and capping, and final site stabilization with temporary erosion protection. Work shall be completed within 60 days after the Contracting Officer issues notice to proceed, during normal business hours of 7:00 am to 5:00 pm, Monday through Thursday, excluding Federal holidays. An on-site pre-construction meeting is required at least 7 days in advance, and bi-weekly field meetings with the Contracting Officer's Representative are mandatory. The contractor must maintain coordination with the concessioner to ensure airboat operations remain functional and safe for visitors throughout the project. Post-award submittals due within 10 to 15 days of award include an Official Submittal Register, Hazardous Materials Abatement Plan, Hazard Analysis and Safety Plan, Inclement Weather Plan, Demolition & Disposal Plan, Initial Project Schedule with Schedule of Values, Equipment List, and Contract Modification Request Form.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCTION, DEMOLISH COOPERTOWN RESTAURANT AT EV, newest first.
File Type Posted
Sol_140P5426R0003_Amd_0002.pdf PDF
Asbestos_Analysis_Report_0001.pdf PDF
Sol_140P5426R0003_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Environmental_Site_Assessment_0001.pdf PDF
Sol_140P5426R0003.pdf PDF
Wage_Determination.pdf PDF
Past_Performance_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

DEMOLISH COOPERTOWN RESTAURANT Statement of Work EVER #350149 Page 1

EVERGLADES NATIONAL PARK

DEMOLISH COOPERTOWN RESTAURANT

EVER PMIS #350149

July 2025

NATIONAL PARK SERVICE

SOUTHEAST REGION

EVER #350149 Page 2

1. PARK INTRODUCTION

2. PROJECT INTRODUCTION AND OVERVIEW

3. REQUIRED SERVICES

4. SPECIAL CONTRACTOR RESPONSIBILITIES

5. GOVERNMENT FURNISHED PROPERTY, MATERIALS & SUPPLIES

6. WORKING HOURS

7. PERIOD OF PERFORMANCE

8. SAFETY & ENVIRONMENTAL COMPLIANCE

9. QUALITY ASSURANCE

10. MOTOR VEHICLE & TRAFFIC REGULATIONS

11. EMPLOYEE BADGES/PARKING

12. REPLACEMENT OF CONTRACTOR EMPLOYEE FOR SECURITY REASONS

13. NON-PAYMENT FOR ADDITIONAL WORK

14. CONFLICT OF INTEREST

15. CONTRACTOR’S PROPOSAL PACKAGE REQUIREMENTS

16. SUBMITTAL REQUIREMENTS LIST (POST-AWARD)

17. INSPECTION

18. ATTACHMENTS

Acronyms CERP Comprehensive Everglades Restoration Plan CLR Cultural Landscape Report CO Contracting Officer COR Contracting Officer’s Representative CQC Contractor Quality Control EVER Everglades National Park FDEP Florida Department of Environmental Protection HSR Historic Structure Reports NPS National Park Service PE Project Engineer PM Project Manager PMIS Project Management Information System RFP Request for Proposal SOW Statement of Work UST Underground Storage Tank

EVER #350149 Page 3

Demolish Coopertown Restaurant

1. PARK INTRODUCTION

With the support of many early conservationists, scientists, and other advocates, Everglades National Park was established in 1947 to conserve the natural landscape and prevent further degradation of its land, plants, and animals. Although the captivation of the Everglades has mostly stemmed from its unique ecosystem, an alluring human story of the Everglades is deeply interwoven with its endless marshes, dense mangroves, towering palms, alligator holes, and tropical fauna. Various groups and people navigated through and wrestled with the watery landscape to make it home, and even to exploit its natural wonder at times. On these lands you can discover more about the Native Americans that existed and thrived; the agricultural development and drainage of the Everglades; the people and groups who advocated for the conservation of the area; the Everglades’ role in United States War efforts;

the preservation and restoration work that continues today; and much more.

2. PROJECT INTRODUCTION AND OVERVIEW

The National Park Service (NPS), Everglades National Park, requires the demolition of the historic Coopertown Restaurant building, a concessioner-operated, wood-frame structure located at Coopertown Airboats. The 1,440 square foot structure contains asbestos siding and lead-based paint. The work includes hazardous material abatement, complete demolition, and elevation of the site to 9.2 feet NAVD-88 using compacted aggregate fill. Airboat operations must remain functional and safe for visitors throughout the project.

3. REQUIRED SERVICES

The Contractor shall furnish all labor, supervision, tools, materials, transportation, equipment, and incidentals necessary to:

1. Perform asbestos and lead-based paint abatement in accordance with all applicable local, state, and federal regulations.

2. Demolish the existing 1,440 SF Coopertown Restaurant building, including disposal of all debris and hazardous materials.

3. Backfill and elevate the site to a finished elevation of 9.2 feet NAVD-88 using suitable aggregate fill material.

The tank is situated at Coopertown located at:

22700 SW 8th St Miami, FL 33194

3.1 Mobilization and Pre-Demolition

• Establish erosion control and safety fencing.

• Mobilize necessary equipment and staging.

• Disconnect and cap all existing utilities (power, water, septic) in coordination with utility providers and NPS.

EVER #350149 Page 4

3.2 Hazardous Materials Abatement

• Prepare and submit a Hazardous Materials Abatement Plan.

• Conduct asbestos siding and lead paint removal per 40 CFR Part 61 (NESHAP), OSHA

29 CFR 1926.1101, and Florida DEP regulations.

• Transport and dispose of all hazardous materials at licensed facilities. Submit manifests and disposal records.

3.3 Building Demolition

• Demolish the entire building including above-grade and any shallow foundation elements.

• Protect adjacent active concession operations and public visitors.

• Segregate and dispose of demolition debris at authorized facilities.

3.4 Site Elevation and Backfill

• Place and compact suitable aggregate or engineered fill to raise the site to 9.2’ NAVD-88.

• Provide compaction testing and elevation verification by a licensed geotechnical or surveying professional.

• Grade to provide positive drainage and erosion control.

3.5 Final Stabilization

• Provide temporary stabilization of exposed soils with straw mulch, geotextile, or hydroseed (as appropriate).

• Clean the site and restore to a stable, safe condition ready for future development.

4. SPECIAL CONTRACTOR RESPONSIBILITIES

• An on-site pre-construction meeting is required prior to mobilizing to execute the project requirements. Contractor shall initiate meeting invitation with the Contracting Officer’s Representative (COR) at least 7-days in advance. Coordination with the Concessioner will be required for airboat operation to remain open during construction.

• The contractor shall initiate and support bi-weekly meetings in the field with the COR and other key stakeholders to discuss project schedule and field activity coordination to ensure key milestones are being communicated; the goal of this meeting is to ensure National Park Service (NPS) personnel are available to support when required. At a minimum, the site Superintendent shall be in attendance for the contractor. The COR will determine required NPS personnel attendance requirements.

• Protect other elements and finishes of the existing infrastructure from damage during the execution of this SOW. Damage to property resulting from the execution of this contract work shall be corrected at the Contractor’s expense.

• Adhere to stipulations imposed by Everglades National Park Compliance office.

• Submittals are required for this contract; contractor shall refer to Section 16 -

SUBMITTAL REQUIREMENTS LIST for details.

EVER #350149 Page 5

• Use of Site: Limit use of the premises to the area immediately adjacent to the work site.

Do not disturb portions of the site beyond the work area.

• Preservation of Natural Features: Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

• Preservation of Cultural Resources: No known archeological resources are in this work area. If previously unknown archeological resources are discovered during the work of this project, the Contractor will immediately stop work at the discovery and notify the Contracting Officer. An equitable adjustment will be made in accordance with the Changes clause of the contract if necessary.

• Start of Work Notification: At least two weeks prior to the start of on-site work, the Contractor shall notify the Contracting Officer of the intended start date. This will allow government personnel to conduct a final review of the work site for any resource issues prior to the start of construction.

• Threatened and Endangered Species: The following threatened or endangered species could be encountered in the project area: Wood Storks, Eastern Indigo Snakes, Bonneted Bats, Florida Panthers, and American Crocodiles.

• All sightings of these species shall be reported to the Contracting Officer. When an endangered species is present or observed on the work site, work shall be postponed until the individuals leave the area.

• Non-native species: To prevent the spread of non-native species into the park, the Contractor shall do the following:

1. Construction equipment brought to the site shall be cleaned of any foreign material which could contain non-native plants, seeds, animals, or noxious weeks.

2. All materials (including fill dirt and aggregates) shall be free of non-native invasive plants and animals, and noxious weeds.

• Install silt fence downhill from all earth disturbing activities to prevent runoff.

• Install necessary fence, barricade, or otherwise to block off the immediate work area to prevent unauthorized entry by visitors or NPS staff.

5. GOVERNMENT FURNISHED PROPERTY, MATERIALS & SUPPLIES

The are no government furnished property, materials, or supplies associated with this project.

6. WORKING HOURS

Contractor shall complete on-site work during normal business hours of 7:00 am to 5:00 pm, Monday through Thursday, excluding Federal holidays. Contractor shall coordinate specific on-site work schedule with the Contracting Officer (CO) and Contracting Officer Representative (COR) via the approved project schedule. While on site, the COR may be reached by mobile phone during normal business hours. Any requests to work outside of normal business hours shall be date specific and shall be pre-approved by both the CO and

COR.

EVER #350149 Page 6

7. PERIOD OF PERFORMANCE

Work shall be completed within 60 days after CO issues notice to proceed. Additional time may be granted as needed for completion of testing and monitoring if required.

8. SAFETY & ENVIRONMENTAL COMPLIANCE

• Contractor shall develop a Hazard Analysis & Safety Plan for the project and assign a safety officer to monitor and enforce it. Refer to the Submittal Section of this document for additional details.

• Personnel shall wear appropriate personal protective equipment (PPE). PPE shall meet requirements of NIOSH and ANSI.

• Contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), and state, local, safety, laws.

• Contractor shall comply with pertinent Environmental Protection Agency laws and regulations.

• The Park safety officer shall have the authority to issue restraint, or a stop work order to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property.

• Contractor shall immediately report to the CO, COR, and Park Safety Officer all accidents resulting in employee injury or death or damage to property while performing this contract.

9. QUALITY ASSURANCE

The Contractor shall provide daily reports of construction activity. The form of the report is up to the Contractor, but the report shall include the following information:

• Date

• Project Title and Contract Number

• Contractor’s name and On-site Superintendent’s name

• General description of weather and ground conditions

• Number of employees (including sub-contractors) working on-site. Employees shall be listed by job categories.

• List of equipment working on-site.

• Description of work performed.

• Any issues arising including disputes, unforeseen circumstances, differing site conditions, delays, accidents, etc.

• Reports shall be e-mailed to the Contracting Officer on a weekly basis.

10. MOTOR VEHICLE & TRAFFIC REGULATIONS

Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permit, licenses, registrations, and proof of insurance shall be maintained in the vehicle at all times and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits.

EVER #350149 Page 7

11. EMPLOYEE BADGES/PARKING

All Contractor employees shall comply with parking procedures published for the Park.

Contractor employees shall return any Park issued personal or vehicle identification badges immediately upon termination of employment or completion of this contract.

12. REPLACEMENT OF CONTRACTOR EMPLOYEE FOR SECURITY REASONS

The Government retains the right to request removal of the Contractor’s employee(s), regardless of prior clearances.

13. NON-PAYMENT FOR ADDITIONAL WORK

Any additional Contractor performed services not specified in contract, either at its own volition or at the request of an individual other than a warranted CO, shall be performed at the financial risk of the Contractor. Only a warranted CO is authorized to bind the Government to a change in specifications, contract terms, or conditions.

14. CONFLICT OF INTEREST

Contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest (COI) or be contrary to the policies contained in COI directives.

15. CONTRACTOR’S PROPOSAL PACKAGE REQUIREMENTS

The following deliverables are required to be submitted with offer in response to this SOW.

• Total Cost for the Project Proposal

• Price breakdown of the Project Proposal as specified in Section 3, of this document.

• Any additional FAR requirements as specified by the CO (ie: Bonds, Insurances, etc.)

16. SUBMITTAL REQUIREMENTS LIST (POST-AWARD)

• The contractor shall submit a post-site visit “Summary of Work” document to the COR for review at least 14 days prior to proposed construction start date. The Summary of Work document shall be a description of the work described by the Contractor which includes any activities omitted from the original scope of work contained herein.

• Contractor shall provide a list of equipment being utilized to conduct the work, and a work plan, that details means and methods for removal of the tank and for testing and monitoring if required.

• Contractor Hazard Analysis & Safety Plan and qualifications of safety person.

• Contractor’s Debris Disposal Plan: plan shall include description of the proposed procedures to transport all debris, methods to reduce potential for introduction of invasive species into the park, proposed debris receiving site, and documentation methods.

• Initial Project Schedule and monthly updates with baseline markers.

• Inclement Weather/Hurricane Plan

• Contractor’s Contract Modification Request Form and example procedures for submission and justification.

EVER #350149 Page 8

• Use Attachment A: Submittal Form for all submittals. Anticipate 14-day government review period for all submittals.

• See Attachment B: List of Required Submittals to develop official project Submittal Register. Submittal Register is due within 10 days of Award.

17. INSPECTION

The Government will conduct periodic inspections during contract performance. Inspections shall be both random and at identified milestones during the project. These milestones shall be identified during the project schedule submittal and approval procedure. There shall also be a Final Inspection upon project completion. Final payment shall only be processed upon confirming that all noted Contractor performance deficiencies identified during the Final Inspection have been satisfactorily corrected. A release of claims shall be submitted with final invoice.

Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will perform inspection within 10 days of receipt of request. If the project is determined to be substantially complete, the Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion.

18. ATTACHMENTS

Attachment A: Submittal Form Attachment B: List of Required Submittals

TRANSMITTAL - NATIONAL PARK SERVICE

Transmittal No.:

Sheet: of:

Park: Project: Contract No.: PMIS No.: Date:

Contractor: Subcontractor/Supplier:

NPS ACTION

Item No.

S p e c if ic a ti o n

S e c ti o n N o

P a ra g ra p h N o

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o o f C o p ie s

S u b m it te d

N o f C o p ie

R tu rn

A p p ro v

A p p ro v e d w it h

N te

D is a p p ro v e

R s u b m it

Contractor Signature Recommended by

Title, Date Title Date

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments

Action By Date

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00

ATTACHMENT A: SUBMITTAL FORM

Item # Due Date to COR 1 10 days after award

2 10 days after award

3 15 days after award

4 15 days after award

5 15 days after award 6 15 days after award 7 15 days after award 8 15 days after award

Equipment List Contractor's Contract Modification Request Form

Submittal Description Official Submittal Register

Hazardous Materials Abatement Plan

Demolition & Disposal Plan Initial Project Schedule w/ Schedule of Values

Inclement Weather Plan

Hazard Analysis and Accident Prevention Plan

Attachment B

1. Park Introduction
2. Project Introduction and Overview
3. Required Services
3.1 Mobilization and Pre-Demolition
3.2 Hazardous Materials Abatement
3.3 Building Demolition
3.4 Site Elevation and Backfill
3.5 Final Stabilization
4. Special Contractor Responsibilities
5. Government Furnished Property, Materials & Supplies
6. Working Hours
7. Period of performance
8. Safety & Environmental Compliance
9. QUALITY ASSURANCE
10. Motor Vehicle & Traffic Regulations
11. Employee Badges/Parking
12. Replacement of Contractor Employee for Security Reasons
13. Non-Payment for Additional Work
14. Conflict of Interest
15. Contractor’s Proposal Package Requirements
16. Submittal Requirements List (Post-Award)
17. Inspection
18. AttAchments
Transmittal No Sheet of: 1
Sheet: 1
Of: 1
Park: Everglades National Park
Project:
Contract No:
PMIS No:
Date:
Contractor:
SubcontractorSupplier:
Item NoRow1:
ContractorRow2:
Paragraph NoRow1:
Description of Item Size Type Name Manufacturer Use EtcRow1:
Item NoRow2:
ContractorRow3:
Paragraph NoRow2:
Description of Item Size Type Name Manufacturer Use EtcRow2:
Item NoRow3:
ContractorRow4:
Paragraph NoRow3:
Description of Item Size Type Name Manufacturer Use EtcRow3:
Item NoRow4:
ContractorRow5:
Paragraph NoRow4:
Description of Item Size Type Name Manufacturer Use EtcRow4:
Item NoRow5:
ContractorRow6:
Paragraph NoRow5:
Description of Item Size Type Name Manufacturer Use EtcRow5:
Item NoRow6:
ContractorRow7:
Paragraph NoRow6:
Description of Item Size Type Name Manufacturer Use EtcRow6:
Contractor Signature:
Title Date:
Review Comments:

File details come from the government source that posted it. Updated .