STATEMENT OF WORK.pdf
PDF 343 KB Posted
- Attached to
- C5 TRAINING TRAILER ROOF REPAIR (CONSTRUCTION)
- Solicitation number
- 70Z02725QPORT0000213
About this file
This Statement of Work (SOW) details roof repair requirements for a C5 Training Trailer at the United States Coast Guard Base Portsmouth in Virginia. The project involves repairing a damaged roof membrane, including pressure washing, resecuring drip edge flashing, and replacing approximately 200 square feet of deteriorated substrate plywood. The contractor must strip in 85 linear feet of TPO (Thermoplastic Polyolefin) membrane, install new plywood, and ensure proper sealing and drainage.
The contract has a period of performance not exceeding 30 working days, with work to be performed at the contractor's facilities and the USCG Base located at 4000 Coast Guard Blvd, Portsmouth, VA 23703. Contractors must comply with federal safety and environmental regulations, provide necessary documentation, and obtain required permits. Employees must have appropriate identification and be eligible for a Secret Clearance. Work hours are generally 0700-1530 EST, Monday through Friday, with potential for extended hours as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 0001-TERMS AND CONDITIONS - CLAUSES AND PROVISIONS.pdf | ||
| Amendment 0001.pdf | ||
| DAVIS BACON ACT WD VA20250161.pdf | ||
| DAVIS BACON WORKER RIGHTS POSTER.pdf | ||
| PICS C5 Training Annex.pptx | PPTX presentation | |
| TERMS AND CONDITIONS - CLAUSES AND PROVISIONS.pdf | ||
| SF1422 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #: 31040PR250000213
STATEMENT OF WORK
LAST UPDATED: 08/18/2025 PAGE 1/7
STATEMENT OF WORK (SOW)
FOR
<C5 Training Trailer Roof Repair >
08/25/2025
1.0 GENERAL
1.1 BACKGROUND
The metal flashing strip under the membrane along the drip edge of the roof in several locations, is starting to come loose and has lifted creating a dam effect and causing the water to pool up on the roof, not allowing the water to drain off the roof properly. The roof's membrane sections that cover and seal the metal flashing have started to peel up on the edge of the roof in several locations. The water has started to get underneath the membrane and has deteriorated a 200-square feet section of the roof’s substrate plywood in one of the corners of the roof.
2.0 SCOPE :
The work consists of pressure washing if meldew or algae is present. Provide all materials and equipment to re-secure flashing down on dripedge and to strip in 85 linear feet of drip edge TPO (Thermoplastic Polyolefin). Remove approximately 200-square feet of rotten substrate wood and replace it with new wood and TPO membrane. Strip it with cover strips when complete.
2.1 Task One: Pressure Wash
2.1.1 The Contractor shall be responsible for using a pressure washer setting that will not damage the roof. Carefully pressure wash the entire surface of the membrane roof using appropriate pressure settings and techniques to avoid damage to the membrane.
2.2 Task Two: Drip Edge Flashing
2.2.1 Contractor shall resecure drip edge flashing down.
2.2.2 Contrator shall furnish and strip in 85-linear feet of drip edge with TPO (Thermoplastic Polyolefin). Install and seal according to manufacturer’s specification.
2.2.3 REMOVE ALL CONTRACTOR DEBRIS (except for the removed materials being recycled by the Government). All trash and debris shall be removed from the site daily.
The job site shall be left in a clean and neat manner.
2.3 Task Three: Plywood Substrate Removal
LAST UPDATED: 08/18/2025 PAGE 2/7
2.3.1 Contractor shall remove 200-square feet of TPO membrane.
2.3.2 Contractor shall visually inspect the existing roof area to identify the precise location and extent of damaged plywood.
2.3.3 Contractor shall remove 200-square feet of plywood substrate.
2.3.4 Inspect the underlying framing for any rot, water damage, or structural issues. If any issues are found, notify the client immediately for further evaluation and direction.
2.3.2 REMOVE ALL CONTRACTOR DEBRIS . All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
2.4 Task Four: Replace Plywood Substrate
2.4.1 Contrator shall furnish and install 200-square feet of new plywood. New plywood substrate needs to match or exceed the original specifications in thickness and grade.
2.4.2 Ensure the new plywood is properly fastened to the roof framing using appropriate fasteners spaced according to building codes and manufacturer recommendations.
2.4.3 Stagger plywood joints for added strength and stability.
2.4.4 Properly seal all plywood seams and edges with approved sealant to prevent moisture intrusion.
2.4.5 Verify the replaced plywood is level and provides a smooth, even surface for the
TPO
membrane.
2.4.2 REMOVE ALL CONTRACTOR DEBRIS . All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
2.5 Task Five: Strip in TPO membrane to seal in new plywood
2.5.1 Contrator shall furnish and install new TPO membrane. Strip in and seal in area where new PTO membrane was installed. Install and seal according to manufacturer’s specification.
2.5.2 Verify existing roof slope to ensure proper drainage with the TPO membrane.
2.5.3 REMOVE ALL CONTRACTOR DEBRIS. All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
LAST UPDATED: 08/18/2025 PAGE 3/7
3.0 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW.
3.1 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Quality Assurance Evaluator (QAE) Representative prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.
3.2 KEY PERSONNEL
3.3 PROJECT MANAGER
3.4.1 The Project Manager must be available to the QAE via telephone between the hours of 0900 and 1400 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.
3.5 EMPLOYEE IDENTIFICATION
3.5.1 The Contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The USCG Base Portsmouth Security Office will be given a copy of the employee list, and a pass will be issued for entry. Each contractor provided vehicle, or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
3.5.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.
3.6 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The
LAST UPDATED: 08/18/2025 PAGE 4/7
Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 SITE VISIT
A site visit is required to conduct field verification of any/all quantities and measurements before submitting bids. Interested parties shall make arrangements for a site visit with the QAE.
4.1 DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)
REPRESENTATIVE
Nathan Chappell. 757-483-8792 Nathan.C.Chappell@uscg.mil.
4.1.1 All site visits are to be pre-arranged a minimum of three (03) days in advance. To arrange a site visit, the following information shall be provided to the QAE: Full name, date of birth, and last four of SSN of each person.
4.1.2 CONDITIONS AFFECTING THE WORK
The Contractor/Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work. All work that exceeds a completion time greater than 10 days, may be subject presenting RapidGate as a method of Base entry.
4.2 SECURITY
4.2.1 Coordinate with the CSO Office upon arrival for your scheduled site visit.
4.2.2 Contractor access to classified information is not currently required under this SOW. However, the Government at a later date may require all Contractor personnel to
LAST UPDATED: 08/18/2025 PAGE 5/7
have Secret clearances. Accordingly, all Contractor employees provided for this requirement must be eligible for a Secret Clearance.
4.2.3 Each contractor that does not have Real ID on their Driver licenses will need to present one of the following credentials:
. U.S. Department of Defense ID, including IDs issued to Active Duty, Reserve, National Guard, retirees and dependents.
. RAPIDGate Credential . HSPD-12 PIV card . State-issued Enhanced Driver's License . U.S. passport . U.S. passport card . DHS trusted traveler cards (Global Entry, NEXUS, SENTRI, FAST) . Permanent resident card . Border crossing card . Federally recognized Tribal Nation/Indian Tribe, including Enhanced Tribal Cards (ETCs) . Foreign government-issued passport . Canadian provincial driver's license or Indian and Northern Affairs Canada card . Transportation worker identification credential . U.S. Citizenship and Immigration Services Employment Authorization Card (I-766) . U.S. Merchant Mariner Credential . Veteran Health Identification Card (VHIC)
5.0 AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
5.1 PERIOD OF PERFORMANCE
The period of performance for this contract must not exceed 30 working days after contract award or as negotiated with Contracting Officer and Facilities Engineering.
5.2 PLACE OF PERFORMANCE
The primary place of performance will be a combination of the Contractor’s facilities and the United States Coast Guard at 4000 Coast Guard Blvd, Portsmouth, VA 23703.
Custom manufacturing will be conducted at Contractor’s facility and installation will be conducted at the USCG Base Portsmouth.
5.3 HOURS OF OPERATION
Contractor employees must generally perform all work between the hours of 0700 and 1530 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. If the contractor desires to carry on work on Saturday, Sunday, holidays or
LAST UPDATED: 08/18/2025 PAGE 6/7
outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government to inspect the work in progress.
5.4 TRAVEL
Travel shall not be included as an additional/separate line item. Travel is required for delivery and installation purposes and shall be included as part of the overall cost.
5.5 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Adobe .PDF or Microsoft Word .DOC).
5.6 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.
5.7 GOVERNMENT ACCEPTANCE PERIOD
Upon completion of work, contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
5.7.1 The QAE will conduct an inspection of the work conducted by the Contractor and will have the right to reject or require correction of any deficiencies found that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the QAE of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
6.0 OTHER APPLICABLE CONDITIONS
6.1 SECURITY/SAFETY
All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
Written notification must be provided to the Base Safety Officer; in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety
LAST UPDATED: 08/18/2025 PAGE 7/7
Officer.
Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.
Every employee working on Base Portsmouth has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
6.2 ENVIRONMENTAL PROTECTION REQUIREMENTS:
All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series).
Contractors written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
6.3 PERMITS: The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work.
The contractor shall comply with all applicable federal, state and local laws.
6.4 WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory for the Contracting Officer.
6.5 ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
File details come from the government source that posted it. Updated .