This Statement of Work (SOW) details mold remediation requirements for two locations at the United States Merchant Marine Academy (USMMA): Land Hall 2nd Floor Storage Room (204) at 224 sq ft and Jones Hall Zero Deck Mechanical Room at 275 sq ft. The contractor must be licensed by the New York State Department of Labor for mold remediation and provide all management, tools, supplies, equipment, permits, and labor necessary for the work.
Key requirements include removing and disposing of mold-contaminated materials (including fiberglass pipe insulation wrap), installing new pipe insulation, establishing HEPA-filtered negative pressure containment areas, performing remediation according to federal/state/local regulations, and working with a NYS Mold Assessor throughout the project. The contractor must complete the work within 5 days of contract award, during normal business hours (7am-4pm Monday-Friday), and submit a work plan 48 hours before starting. Special considerations include USMMA's status as a National Register of Historic Places property, requiring compliance with Secretary of Interior's Standards, and the potential presence of lead-based paint and asbestos that must be reported if encountered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Mold Remediation Land Hall 2nd Floor Storage Room (204) & Jones Hall Zero Deck
Mechanical Room
1. Description of Services
A New York State (NYS) Department of Labor (DOL) licensed mold remediation contractor shall provide the management, tools, supplies, equipment, permits, and labor necessary to conduct a mold remediation in Land Hall, 2nd Floor, Storage Room (204) and Jones Hall, Zero (0) Deck, Mechanical Room for the United States Merchant Marine
Academy (USMMA).
Services shall include, but not be limited to, performing remediation of mold-contaminated materials and transporting all waste generated by the remediation to a suitable disposal facility. Contractor shall ensure that all applicable federal, state and local laws and requirements for remediation activities are met or exceeded.
USMMA is listed on the National Register of Historic Places on August 29, 2014.
Therefore, all work shall be consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties (36 CFR part 68).
http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.
Additionally, all work shall meet or exceed the standards provided in the Secretary of the
Interior’s Standards for Rehabilitation and guidelines for applying the standards published by the National Park Service, U.S. Department of the Interior 36 CFR 67.7 -
Standards for rehabilitation.”
2. General Requirements
a. The contractor shall furnish all labor, supervision, materials, equipment, supplies, and permits for the removal, transportation, and disposal of all mold contaminated building materials from the academy in accordance with all federal, state and local laws and regulations including but not limited to the NYS Mold Law Article 32, DOL, Occupational Safety and Health Administration (OSHA) and US
Environmental Protection Agency (EPA).
b. The contractor shall remove and dispose of all mold-impacted material including but not limited to fiberglass pipe insulation wrap. The contractor will apply new fiberglass pipe insulation wrapping. Insulation material must comply with all federal, state and local laws and requirements.
c. The contractor, if required, shall move and return to the original position following remediation all furniture, furnishings, storage racks, file cabinets, desks, chairs, wall decor, and other applicable items as identified at the discretion of the Contracting
Officer Representative (COR) and Department of Public Works (DPW).
d. The contractor shall meet or exceed all federal, state and local regulations in remediating and disposing of mold waste and mold contaminated building materials including the training of personnel in the proper handling and disposal of all mold waste.
e. The contractor shall possess a current and up-to-date NYS Department of Labor Mold
Remediation license, training, and/or certification(s) and shall work in accordance with all federal, state and local laws and regulations related to mold remediation including but not limited to NYS Mold Law Article 32.
f. The contractor will work in tandem with the NYS Mold Assessor (to be hired by the academy) throughout the duration of the remediation project and follow all the guidelines set forth within the Mold Remediation Plan.
g. The contractor shall be aware of the potential presence of hazardous materials, specifically lead-based paint and asbestos, in any buildings located at the USMMA where the remediation will occur. The contractor shall immediately notify the COR, Contracting Officer (CO), DPW and/or Department of Public Safety (DPS) upon encountering any imminent asbestos/lead hazards.
h. The contractor will provide all required documentation related to the project including but not limited to; Safety Data Sheet (SDS) of all US Environmental
Protection Agency (USEPA) registered disinfectants, biocides and/or antimicrobial coatings, waste manifests, and close-out documentation of all remediation activities.
i. At a minimum the contractor shall provide the following general services: setup
HEPA-filtered negative pressure containment and decontamination enclosures; use
HEPA vacuums to remediate mold-impacted areas and neighboring areas; remove and dispose of mold and mold-impacted materials in accordance with all federal, state, and local requirements; perform final cleaning; reclean if work is not deemed acceptable in accordance with regulatory standards; and break down and removal of containment after work area is rendered suitable for re-occupancy (dependent on visual inspection and clearance performed by the licensed NYS Mold Assessor).
j. The contractor shall be responsible for installation and connection of all temporary utilities required to complete the remediation. The contractor shall ensure all electrical equipment run through Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel will show the contractor where to connect to water and power. The contractor shall provide and install temporary GFCI panels for electrical service.
k. The work area must be cordoned off per federal, state and local laws and regulations with clearly visible barriers (i.e., caution tape) and notifications (i.e., signs), where only authorized and trained individuals related to the remediation project may enter.
l. Maintain and identify emergency exit(s) from the work area or establish alternate exit(s) compliant with all federal, state and local laws and regulations.
m. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant equipment to prevent contamination in neighboring areas per federal, state and local laws and regulations.
3. Additional Notes
a. Start Date: To be determined (Upon USMMA CO’s award of contract).
Completion Date: 5 days after award of contract.
The completion date includes but is not limited to the submittal process, performance of the work, inspection, final clearance/report, waste disposal and waste manifest delivery.
b. A full work plan must be prepared in advanced and submitted to the academy’s COR for approval. The plan must be approved at least 48 hours prior to commencement of work. The work plan must include but is not limited to; Mold Remediation Plan, Remediation contractor qualification(s), and SDS.
c. All work commencement must be scheduled with the COR at least 24 hours prior to starting.
d. The contractor shall conduct a pre-bid walkthrough with the COR and DPW to identify and mark the proposed area where remediation will take place. Any square footage identified in the SOW are approximation(s) and will need to be assessed and verified by the contractor during the walkthrough and incorporated into the bid submission.
e. The contractor is responsible for verifying quantities and locations where all work is to be performed. Failure to do so shall not relieve the contractor of its obligation to furnish all labor and materials necessary to perform the work.
f. All work must be completed between normal business hours of operation (7am –
4pm), Monday – Friday, unless additional approval is granted by the CO and COR.
g. The academy must be immediately notified of any service and/or activity interruptions. Any potential unforeseen interruptions or issues must be immediately related to the COR, DPW, and DPS.
h. Any debris generated during remediation activities will be removed by the contractor daily from the affected area(s) and academy premises. Area(s) will be left neat and clean after work is completed, suitable for all normal academy activities.
i. The contractor must properly dispose of waste in accordance with all federal, state and local requirements. Documentation of this disposal shall be provided to the COR in accordance to all regulatory laws.
j. The contractor shall provide all of the required documentation necessary to perform the work in accordance with all federal, state and local laws and regulations.
Documentation may include but are not limited to; training certificates, licenses, work plans, permits, and waste manifests.
k. The contractor shall assume full responsibility and liability for compliance with all applicable federal, state and local regulations related to any and all aspects of the work.
l. The contractor is responsible for ensuring client satisfaction throughout the duration of the project. Any discrepancies, issues and concerns identified by the client originating from the contractor will be addressed, documented and corrected in a timely manner.
❖ NOTE: The contractor is responsible for any subcontractors that may be used for this project. Subcontractors are required to adhere to all the requirements set forth within this SOW.
4. Image(s) of Area of Concern
Land Hall – 2nd Floor Storage Room (204) (~ 224 Sq. Ft)
Jones Hall – 0 Deck – Mechanical Room (~ 275 Sq. Ft)