Statement of Work AUTS (1).docx
DOCX document 25 KB Posted
- Attached to
- CVN Access Control Maintenance Federal contract opportunity
- Solicitation number
- F2U0105155A001
About this file
The document is a Statement of Work (SOW) for Preventative Maintenance of a Lenel Software Access Control System at Luke Air Force Base, Arizona. The quarterly maintenance agreement covers 235 card reader controlled doors across 14 buildings, including 14 surveillance cameras, door position switches, and server equipment. A Lenel certified United States citizen technician will perform comprehensive maintenance tasks such as battery testing, system checks, hardware function testing, camera adjustments, and system configuration backups. The maintenance will address vulnerability assessments, system diagnostics, and optimization of video recording storage.
The solicitation (F2U0105155A001) is for a Firm-Fixed Price contract with a 12-month base period and four optional extension periods. Maintenance will be performed on Lenel Software System versions 8.3.670.0 and 8.0.485.0, with specific dongle IDs. Additional services may include system software configuration changes, training, custom report generation, and technical support. The formal solicitation will be available no later than 3 July 2025, and potential offerors must be Lenel-certified. The contract is issued by the Department of the Air Force Air Education and Training Command, with point of contact information provided for SrA Brandon Jourden and Ms. Sara Lackey.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA488725Q00250004 SF 30.pdf | ||
| CVN RFI Log.docx | DOCX document | |
| CVN RFI Log.docx | DOCX document | |
| Solicitation Amendment FA488725Q00250003 SF 30.pdf | ||
| Solicitation Amendment FA488725Q00250002 SF 30.pdf | ||
| Solicitation - FA488725Q0025.pdf | ||
| Solicitation Amendment - FA488725Q00250001.pdf | ||
| Anti-Terrorism Pamphlet.pdf | ||
| Luke AFB Environmental Guide for Contractors_July2022 (1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
56th FW/CVN ADVANCED PROGRAMS OFFICE LUKE AIR FORCE BASE ARIZONA
MEMORANDUM FOR: 56 CONS DATE 4 June 2025
FROM: 56 FW/CVN
SUBJECT STATEMENT OF WORK: Preventative Maintenance for Lenel Software
Quarterly Preventative Maintenance Agreement to perform inspections, testing and adjustments of 2 systems covering 235 card reader controlled doors for 14 buildings to include 14 surveillance cameras, perimeter door position switches, equipment enclosures and server/ storage equipment racks as required. The Maintenance Agreement should include: back-up of access control system configuration; archiving of cardholder database/transaction logs; back-up video management system configuration; confirm correct recording preferences (application reprogramming excluded); de-fragment all hard drives as needed; run system-wide diagnostic reports in order to identify nuisance alarms and/or faulty equipment (if needed, repairs performed pursuant to Service Agreement); and optimize video recording storage arrays as needed (application reprogramming excluded). The Preventative Maintenance Agreement should address any vulnerability assessments required to identify gaps in current electronic security protection scheme and Customer interview regarding needs analysis.
Lenel Software System ID Version: 8.3.670.0 & 8.0.485.0 Lenel Software System Dongle ID: # 125757 & # 151397
Quarterly inspections will be performed by a Lenel certified technician and United States citizen:
Preventative Maintenance should include the following:
1. Battery testing of all system backup batteries with replacement of these batteries as needed at no additional cost.
2. System checks including, error logs, false alarms, trouble conditions, badge printer errors
3. Reader and door hardware function testing.
4. Camera focusing, cleaning, and adjustments.
5. System backup configuration.
Options requested outside normal quarterly maintenance:
· System software configuration changes or additions to include updates to maintain currency
· Additional system use training and/or refresher training
· Custom report generation
· Equipment replacement (if equipment is provided by the Government)
· Design requests
Ability to provide Technical support Period of Performance 12 month base period with 4 quarters, with 4 option periods.
Documentation will include the following:
1. Quarterly reports after each inspection.
image1.jpeg