Statement of Work 632-353 Renovate and Expand Emergency Departmen.docx

DOCX document 17 KB Posted

Attached to
Y1DA--632-353 Renovate and Expand Emergency Department
Solicitation number
36C24220B0063
Issued by

About this file

This statement of work outlines requirements for renovating and expanding an emergency department at a Veterans Affairs medical center. The project includes demolishing existing structures like an ambulance garage and lounge, expanding emergency room space, upgrading mechanical, electrical and plumbing systems, installing a new emergency generator and elevator, and completing associated site work over a 795 calendar day performance period. The related federal contract opportunity is solicitation number 36C24220B0063 to provide the labor, materials and services defined in the statement of work for renovating and expanding the emergency department located at the Northport VA Medical Center in Northport, New York.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Project Number 632-353 Renovate and Expand Emergency Department.

This Project will renovate and expand the Emergency department in Building No. 200 at the Northport VA Medical Center, 79 Middleville Road, Northport, NY 11768.

The Contractor shall furnish labor and materials and perform work for expansion and renovation of existing space located at the first floor of the main hospital building as required by the drawings and specifications. Work includes demolition, general construction, alterations, sitework, equipment, mechanical, plumbing and electrical work; phased alterations to existing Emergency Department access road, parking and walkways; new walkway canopy, grading, drainage, installation of new underground fuel tank and landscaping; phased abatement of hazardous materials at existing building spaces to be demolished or renovated; phased demolition of existing ambulance garage, lounge and E.R. vestibule structures; phased demolition of existing interior spaces to be renovated; phased construction of new E.R. extension and emergency generator room and interior build out at extension and renovated spaces; new elevator and pneumatic tube system and related work. Electrical Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including phased removals of existing equipment and devices as indicated on the drawings; phased installation of new interior and site power and lighting; emergency generator, distribution boards and panels; fire alarm system, security system, nurse call system; new work at existing basement switchgear and generator room; electrical work required for new elevator, mechanical equipment and devices. Mechanical Work includes all labor, material, equipment and supervision to perform the required mechanical construction work on this project including phased removals of existing mechanical and plumbing systems, piping, fixtures and devices at the basement and first floor, as indicated on the drawings; phased installation of new air handling units at the basement and roof with associated ductwork and devices and controls; plumbing work including medical gas and vacuum systems; air curtain and radiant heating as indicated on the drawings. All certain other items as required by the drawings and specifications.

The contract completion time is 795 calendar days from receipt of Notice to Proceed.

This contract does not involve VA sensitive information and contractor personnel do not require access to VA systems. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of VA.