STATEMENT OF OBJECTIVES ATLSS.asd.pdf
PDF 84 KB Posted
- Solicitation number
- FA910126RWP_ATLSS
About this file
This is a Statement of Objectives (SOO) for an Other Transaction Agreement (OTA) to provide Advanced Test and Logistics Support Services (ATLSS) for the 704th Test Group.
The SOO establishes four primary objectives: (1) Test Support Procurement—rapid acquisition of equipment, materials, and services including metals, fabrication materials, specialized instrumentation, calibrated sensors, calibration equipment, and GPS/PNT equipment, with outcomes delivered through an Online Workflow Management System (OWMS) achieving 95% procurement turnaround on routine items with 98% specification accuracy; (2) Service, Repair, and Maintenance for test equipment including heavy equipment, Shuttlelift cranes, CNC machines, lathes, waterjets, and mills, requiring initial assessment and technician dispatch within 96 hours for critical faults and 90% first-time fix rates, with 90% of repairs completed within 30 days; (3) Material Shipment—secure, compliant transportation of high-value test articles and specialized systems such as electronic warfare jammers and Directed Energy equipment to domestic (CONUS) and international (OCONUS) locations including Australia and New Zealand, achieving 98% on-time delivery with 100% compliance with customs, export control, and ITAR regulations; and (4) Ad-Hoc & Emergent Test Support—flexible capabilities to rapidly resolve unpredictable requirements such as temporary power and environmental solutions, with actionable solutions provided within 48-72 hours of emergency notification. The performer must maintain OWMS system uptime at 99% with 100% CMMC Level 2 data security compliance, provide 100% visibility of tracked funds through the OWMS, and ensure zero unapproved cost overruns.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for White Paper_ATLSS_Amendment 02.docx | DOCX document | |
| STATEMENT OF OBJECTIVES ATLSS_Revised as of 30 July 2026.docx | DOCX document | |
| Request for White Paper_ATLSS_Amendment 01.docx | DOCX document | |
| Request for White Paper_ATLSS.asd.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES (SOO)
Advanced Test and Logistics Support Services (ATLSS)
1.0 Purpose & Scope
The purpose of this SOO is to establish an Other Transaction Agreement (OTA) to provide agile, comprehensive logistics and test support for the 704th Test Group (704 TG). The scope encompasses four primary functions: Test Support Procurement; Equipment Service, Maintenance, and Repair (MX); Material Shipment; and Ad-Hoc/Emergent Test Support. The goal is to ensure the 704 TG has uninterrupted, responsive support to execute critical national defense testing and experimentation.
2.0 Program Objectives
The performer shall provide innovative, efficient, and cost-effective solutions to meet the following core objectives:
2.1 Objective 1: Test Support Procurement
Provide rapid, ad-hoc procurement of equipment, services, and materials required to sustain dynamic test environments.
• Target Areas: Metals, fabrication materials, specialized instrumentation, calibrated sensors, calibration equipment, GPS/PNT (Positioning, Navigation, and Timing) equipment, and other materials or services to support test execution.
• Outcome: Streamlined acquisition cycles that eliminate supply chain bottlenecks for testing operations, managed through an accessible Online Workflow Management System (OWMS).
2.2 Objective 2: Service, Repair, and Maintenance (MX) for Test Equipment
Ensure high availability and reliability of critical test and fabrication infrastructure through rapid repair services.
• Target Areas: Heavy equipment, Shuttlelift cranes, CNC machines, lathes, waterjets, mills and similar industrial test support machinery.
• Outcome: Minimized equipment downtime of high-value test assets through rapid response repairs.
2.3 Objective 3: Material Shipment for Test Support
Execute secure, compliant, and timely transportation of high-value, sensitive test articles and equipment to domestic (CONUS) and international (OCONUS) locations.
• Target Areas: Specialized systems such as electronic warfare jammers and Directed Energy (DE) equipment. Expected OCONUS operational nodes include, but are not limited to, Australia and New Zealand.
• Outcome: Seamless door-to-door delivery that adheres to all customs, export control (e.g., ITAR), and security regulations without delaying test/exercise schedules.
2.4 Objective 4: Ad-Hoc & Emergent Test Support
Provide a highly flexible capability to rapidly resolve unpredictable, emergent test support requirements that fall outside standard procurement or maintenance categories.
• Target Areas: Urgent infrastructure or environmental bridging solutions (e.g., rapidly sourcing and deploying temporary generators and portable AC units to cool test articles while awaiting permanent facility power/transformer upgrades).
• Outcome: Prevention of test schedule slippage or equipment damage due to unforeseen facility, environmental, or operational shortfalls.
3.0 Performance Parameters & Metrics
To ensure the performer meets the 704 TG's objectives, the following Performance Parameters establish the baseline for evaluating performance success. (The performer will be expected to expand on these in their Quality Control Plan).
Objective Area Performance Parameter / Standard Acceptable Quality Level (AQL)
1. Procurement Procurement Turnaround Time: Time from Government request approval to purchase execution.
95% of routine items purchased within established timelines;
98% accuracy on item specifications.
1. Procurement Availability & Tracking: The Online Workflow Management System (OWMS) must remain accessible and
99% system uptime; 100% compliance with CMMC Level 2 data security.
provide real-time tracking for all procurements.
2. Service, Repair
& MX
Repair Response Time: Time to assess and initiate repair workflows for critical test equipment (e.g., CNCs, cranes) after notification.
Initial assessment/technician dispatch within 96 hours for critical faults; 90% first-time fix rate.
2. Service, Repair
& MX
Repair Completion Time. Time from assessment and initiation of repair for critical test equipment.
Repair completed within 30 days of assessment for 90% of failures.
3. Shipment Delivery Schedule & Compliance: Shipments arrive at CONUS/OCONUS test locations intact and on schedule.
98% on-time delivery; 100% compliance with international export/customs regulations.
4. Ad-Hoc Support
Emergent Response Capability: Ability to source and propose solutions for out-of-scope emergency needs (e.g., temporary HVAC/power).
Actionable solution/quote provided to the Government within 48-72 hours of emergency notification.
Overall Cost Control & Reporting: Accuracy of invoicing and financial reporting within the OWMS.
100% visibility of funds tracked via OWMS; zero unapproved cost overruns.
File details come from the government source that posted it. Updated .