Request for White Paper_ATLSS_Amendment 01.docx
DOCX document 152 KB Posted
- Solicitation number
- FA910126RWP_ATLSS
About this file
This is a Request for Whitepapers (RWP) for an Other Transaction Agreement (OTA) prototype project issued by the Department of the Air Force Headquarters Air Force Test Center at Edwards Air Force Base. The Air Force seeks to establish a centralized, agile Business Process Prototype called Advanced Test and Logistics Support Services (ATLSS) to support the 704th Test Group's critical national defense testing and experimentation needs. The prototype focuses on developing an Online Workflow Management System (OWMS) portal to streamline four core objectives: (1) rapid ad-hoc procurement of critical materials and equipment including metals, specialized instrumentation, and GPS/PNT equipment; (2) service, repair, and maintenance for test equipment such as CNC machines, lathes, and cranes with 96-hour dispatch and 90% first-time fix rates; (3) secure, compliant domestic and international material shipment of sensitive electronic warfare and directed energy equipment to CONUS and OCONUS locations including Australia and New Zealand with 98% on-time delivery; and (4) rapid sourcing and deployment of ad-hoc infrastructure solutions such as temporary generators and HVAC units within 48-72 hours during emergencies.
The whitepaper submission deadline is 10 August 2026, with responses limited to 20 pages excluding cost proposals and certifications. Performers must meet 10 U.S.C. 4022(d) requirements by including at least one nontraditional defense contractor or nonprofit research institution, ensuring all significant participants are small businesses or nontraditional contractors, or funding one-third of costs from non-Federal sources. Pricing must be structured as firm, fully-priced milestones aligned with eight defined project milestones, with no optional or unpriced elements permitted. Performers must demonstrate CMMC Level 2 compliance and maintain 99% OWMS uptime while protecting controlled unclassified information per NIST SP 800-171 standards. The prototype includes transition provisions for potential follow-on production contracts at full scale without competitive procedures if successful. A Virtual Industry Day is scheduled for 23 July 2026, with registration requests due to brooke.vandeman@us.af.mil. The primary NAICS code is 541330 (Engineering Services), and the project operates under 10 U.S.C. 4022 Other Transaction Authority for Prototypes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for White Paper_ATLSS_Amendment 02.docx | DOCX document | |
| STATEMENT OF OBJECTIVES ATLSS_Revised as of 30 July 2026.docx | DOCX document | |
| STATEMENT OF OBJECTIVES ATLSS.asd.pdf | ||
| Request for White Paper_ATLSS.asd.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS AIR FORCE TEST CENTER
EDWARDS AIR FORCE BASE CALIFORNIA
NOTICE TO: Velocity Alliance Consortium Members and Industry Partners via SAM.gov
Request for Whitepapers (RWP)
| Project Title |
| Advanced Test and Logistics Support Services (ATLSS) |
| Authority |
| 10 U.S.C. § 4022 (Other Transaction Authority for Prototypes) |
| *Primary NAICS Code |
| 541330 — Engineering Services (specifically Military and Aerospace Equipment and Military Weapons) |
| Alternative NAICS Codes |
| 561210 — Facilities Support Services |
541614 — Process, Physical Distribution, and Logistics Consulting Services
| Product Service Code |
| R706 — Support- Management |
*Primary NAICS code will be used to establish business size.
1.0 Introduction and Purpose
The Department of the Air Force is issuing this Request for Whitepapers to establish an Other Transaction Agreement (OTA) under 10 U.S.C. § 4022. The purpose of this project is to develop and demonstrate a centralized, agile, and highly responsive Business Process Prototype to support the 704th Test Group (704 TG).
Critical national defense testing and experimentation require uninterrupted, rapid, and highly flexible support structures. Traditional acquisition processes introduce administrative and logistical bottlenecks that can delay testing of high-value systems. This prototype project aims to design, develop, and test an integrated workflow and logistics management system to streamline test support procurement, equipment maintenance, secure material shipment, and rapid ad-hoc test support. By eliminating supply chain bottlenecks, this effort directly enhances the readiness and lethality of the Department of War's advanced testing programs.
Potential for Follow-on Production Contract or Transaction In accordance with 10 U.S.C. § 4022(f), upon the successful completion of this prototype project, the Government may award a follow-on production contract or transaction to the vendor that developed the prototype. This follow-on award may be made without the use of competitive procedures, contingent upon the prototype being successfully completed and satisfying the criteria established in the Other Transaction Prototype Agreement.
For the purposes of a potential follow-on production award, "successful completion" will be determined by the Government based on the performer's ability to meet the technical and performance milestones defined in Section 5.0 of this RWP and the subsequently negotiated Other Transaction Prototype Agreement.
The follow-on production agreement would be for the full-scale, sustained delivery of the services that were successfully demonstrated during the prototype phase.
· The Prototype is: "Prove to us that you can build a system and a network to solve our logistics problems on a limited, demonstration basis."
· The Follow-on Production is: "You proved it. Now, do it for real, at full scale, for the long term."
The follow-on production agreement would specifically be for:
Full-Scale Operational Service Delivery Instead of just demonstrating the capability, the vendor would become the ongoing service provider for the 704th Test Group's logistics needs. This would involve:
· Handling all procurement actions: They would be the day-to-day entity executing the ad-hoc procurement of metals, sensors, and other materials.
· Managing all maintenance and repair: They would be responsible for the continuous uptime of critical equipment (CNCs, cranes, etc.) by managing the entire repair lifecycle.
· Executing all material shipments: They would become the de facto logistics partner for all required CONUS and OCONUS shipments of test articles.
· Providing continuous emergent support: They would be on call to provide rapid solutions for any unforeseen infrastructure needs.
Ongoing Operation and Enhancement of the OWMS The Online Workflow Management System (OWMS), which was developed and proven during the prototype, would transition from a demonstration tool to the primary operational platform. The production agreement would fund the vendor to:
· Host, maintain, and secure the OWMS for daily use by Government personnel.
· Provide user support and training.
· Potentially enhance and add new features to the OWMS as the 704th TG's needs evolve over time.
Expanded Scope and Volume The production agreement would almost certainly cover a much larger volume of activity than the prototype. While the prototype might handle a few dozen transactions to prove the concept, the production agreement would be scaled to handle the full, real-world workload of hundreds or thousands of transactions per year. This could also include expanding the service to support other test units or locations if required.
In essence, the follow-on production agreement is the end goal of the prototype. It allows the Government to move seamlessly from a successful demonstration to a fully operational capability.
2.0 Project Scope and Key Objectives
The Performer shall design, develop, and demonstrate an innovative, efficient, and cost-effective end-to-end logistics and test support prototype system, anchored by the virtual Online Workflow Management System (OWMS) portal.
Core Objectives:
· Objective 1: Test Support Procurement: Rapid, ad-hoc procurement of critical materials, services, and equipment (metals, raw fabrication materials, specialized instrumentation, GPS/PNT equipment, and test-specific consumables) required to sustain dynamic test environments. All requests must be routed, triaged, and tracked through the OWMS portal.
· Objective 2: Service, Repair, and Maintenance (MX) for Test Equipment: Ensure high availability and reliability of critical test and fabrication infrastructure (heavy equipment, Shuttlelift cranes, CNC machines, lathes, waterjets) through rapid repair services.
· Objective 3: Material Shipment for Test Support: Secure, compliant, and timely transportation of high-value, sensitive test articles and equipment (including electronic warfare jammers and Directed Energy equipment) to domestic (CONUS) and international (OCONUS) locations, specifically including Australia and New Zealand.
· Objective 4: Ad-Hoc & Emergent Test Support: Sourcing and deploying flexible rapid-response environmental and infrastructure bridging solutions (e.g., temporary portable generators and HVAC/AC units) to resolve unpredictable, emergent test shortfalls and prevent schedule slippage.
DISCLAIMER: This Section 2.0 provides a high-level conceptual overview of the project objectives and does not override or supersede the detailed requirements set forth in the DRAFT STATEMENT OF OBJECTIVES (SOO) ATLSS.
3.0 Instructions for Performer's Response
The Performer's response must include the following distinct parts:
3.1 Technical Competency
The Performer must describe their capability and proposed methodology to execute the objectives, focusing on:
· Designing and implementing the AFNET-accessible Online Workflow Management System (OWMS) portal. The performer shall describe how they plan to onboard with IL2 Unclass OWMS and provide a plan/timeline to transition to a PKI/CAC enabled, FEDRAMP certified IL4 enclave.
· Establishing rapid-response supply chains and maintenance dispatch networks.
· Implementing compliant international logistics for sensitive electronic warfare and Directed Energy equipment.
· Sourcing and deploying ad-hoc infrastructure bridging solutions under emergency conditions.
Note: The Performer's proposal must focus on demonstrating their capability to perform and execute the workflows, rather than presenting a pre-award completed prototype design or technical solutions.
3.2 Intellectual Property
The Performer shall specify their proposed Intellectual Property (IP) and data rights assertions. The Government requires, at a minimum, Government Purpose Rights (GPR) for the OWMS software database structure and transactional schemas and expects unrestricted rights to historical procurement data (such as raw CSV exports on demand) to ensure the DoW retains full ownership of historical transactional data for future planning.
3.3 Appropriate Use of Authority (10 U.S.C. § 4022(d))
The Performer must meet the statutory requirements of 10 U.S.C. § 4022(d). To be eligible for award, the Performer must certify compliance with at least one of the following conditions:
(A) There is at least one nontraditional defense contractor or nonprofit research institution participating to a significant extent in the prototype project.
(B) All significant participants in the transaction other than the Federal Government are small businesses (including small businesses participating in a program described under section 9 of the Small Business Act (15 U.S.C. 638)) or nontraditional defense contractors.
(C) At least one-third of the total cost of the prototype project is to be paid out of funds provided by sources other than the Federal Government.
NOTE 1: Non-Traditional Defense Contractor (NDC) = An entity that is not currently performing and has not performed, for at least the one-year period preceding the solicitation of sources by DoD for the procurement or transaction, any contract or subcontract for the DoD that is subject to full coverage under the cost accounting standards (CAS) prescribed pursuant to section 1502 of title 41 and the regulations implementing such section (see 10 U.S.C. §3014). A nontraditional defense contractor is considered a nontraditional defense contractor for the duration of the prototype project/agreement’s period of performance, or for any in-scope work modified under the same agreement.
NOTE 2: Non-profit research institution is validated by reviewing the vendor’s 501(c)(3) tax-exempt status, which is required by the Internal Revenue Service.
NOTE 3: “Significant extent” and “significant participants” may be defined by the vendor providing rationale to one or more of the following variables:
a. Has a significant role / level of involvement in the development, production, or delivery of a product or service.
b. Has a significant impact on the design, development, or production of the product or service.
c. Has significant level of material interest in the success of the product or service.
d. Has significant level of company's financial interest in the success of the product or service.
e. Has Significant level of control over the development, production, or delivery of the product or service.
f. Other significant rationale provided by the vendor.
3.4 Pricing and Schedule
The pricing proposal must be structured as firm, fully priced milestones. No unpriced or optional milestones shall be included in the milestone pricing structure. The schedule must align directly with the project phases and the core objectives detailed in Section 6.0.
3.5 Cybersecurity and CMMC Compliance
The Performer must demonstrate compliance with Cybersecurity Maturity Model Certification (CMMC) Level 2. The OWMS portal must remain accessible and secure, maintaining a 99% uptime while protecting Controlled Unclassified Information (CUI) and tracking data in strict compliance with NIST SP 800-171 and CMMC Level 2 data security requirements.
4.0 Evaluation Details
The Government will evaluate the Performer's whitepaper based on the following criteria:
· Technical Merit: The feasibility, innovation, and effectiveness of the proposed technical approach to meeting the four core objectives, and the maturity of the proposed OWMS business process.
· Capability to Execute: The Performer's demonstrated corporate experience, personnel qualifications, and resource availability to successfully execute rapid procurement, repair services, international shipment, and ad-hoc emergency bridging.
· Cost and Price Realism: Evaluation of the proposed milestone pricing to ensure alignment with the technical scope, realistic cost estimates, and lack of unapproved cost overruns.
· Cybersecurity and Compliance: The adequacy of the Performer's plan to meet CMMC Level 2 standards and secure critical test/logistics transaction data.
5.0 Successful Prototype Definition (10 U.S.C. § 4022(e)(5))
A successful prototype is defined as the physical, virtual, or business process demonstration that successfully achieves key operational and technical milestones. For the ATLSS project, the prototype is a Business Process Prototype supported by a virtual Online Workflow Management System (OWMS) portal.
The success of the prototype will be evaluated based on the following specific, measurable, and testable success criteria:
| Objective Area |
| Successful Prototype Evaluation Standard |
| Acceptable Quality Level (AQL) |
| Centralized Intake & Triage (OWMS) |
| Virtual portal deployment on AFNET demonstrating automated triage, routing, unique ID tracking, and approval. |
| • 99% system uptime.• 100% compliance with CMMC Level 2 data security. |
• 100% raw CSV export of historical procurement database on demand.
| 1. Test Support Procurement |
| Streamlined acquisition of metals, specialized instrumentation, and GPS/PNT equipment. |
| • 95% of routine items purchased within established timelines. |
• 98% accuracy on item specifications.
| 2. Service. Repair & Maintenance (MX) |
| Dispatched technical support for critical test equipment (lathes, CNCs, Shuttlelift cranes). |
| • Initial technician dispatch/assessment within 96 hours of critical fault notification. |
• 90% first-time fix rate.
| 2. Service. Repair & Maintenance (MX) |
| Repair Completion Time. Time from assessment and initiation of repair for critical test equipment. |
| Repair completed within 30 days of assessment for 90% of failures. |
| 3. Material Shipment |
| Secure, compliant domestic and international transport of sensitive EW jammers and DE equipment. |
| • 98% on-time delivery to CONUS/OCONUS nodes (including Australia/New Zealand). |
• 100% compliance with ITAR and customs export regulations.
| 4. Ad-Hoc Support |
| Rapid sourcing and deployment of temporary utility/environmental assets (generators, AC/HVAC). |
| • Actionable solution and quote provided to the Government within 48–72 hours of emergency notification to prevent test schedule slippage. |
| Overall Cost Control |
| Real-time burn-rate dashboard and financial tracking. |
| • 100% funds visibility in OWMS. |
• Zero unapproved cost overruns.
6.0 Program Milestones
The project milestones are structured linearly to track the execution of the business process prototype and the four core objectives. No optional or unpriced milestones are included.
· Milestone 1: Project Kickoff Meeting
· Milestone 2: OWMS System Architecture and Interface Design Review (Draft database structure and AFNET integration plan)
· Milestone 3: OWMS Phase 1 Release (Centralized Intake, Automated Triage, and Funds Authorization Workflow)
· Milestone 4: Operational Demonstration of Procurement Supply Chain & OWMS Tracking (Specialized metals, GPS/PNT, instrumentation)
· Milestone 5: Operational Demonstration of Service & Maintenance Dispatch Workflow (CNC, Crane repair ticketing and dispatch within 48 hours)
· Milestone 6: Operational Demonstration of Logistics & Material Shipment Tracking (CONUS/OCONUS compliant shipping dashboard for sensitive articles)
· Milestone 7: Operational Demonstration of Ad-Hoc Emergent Support Capability (Emergency HVAC/generator sourcing and rapid proposal tracking)
· Milestone 8: Full Prototype Demonstration and OWMS Database Export Verification (End-to-end integration and final export of raw CSV transaction data to the Government)
7.0 Submission Details
· Submission Deadline: 10 August 2026
· Submission Format: Electronic submission via email/portal in PDF format, not to exceed 20 pages (excluding cost proposal and certifications).
· Government Point of Contact (POC): Brooke Vandeman, brooke.vandeman@us.af.mil
8.0 Virtual Industry Day
· Interested vendors should plan to attend a government-hosted Virtual Industry Day on 23 July 2026.
· During the event, additional information about the requirement will be provided and a live Question-and-Answer session will be conducted.
· To receive an invitation to the event, please send an email to the Government POC listed in section 7.0 above requesting participation. Your request must be received no later than 23 July 2026.
9.0 Attachments
· Attachment 1: DRAFT STATEMENT OF OBJECTIVES (SOO) ATLSS.docx One AFMC…Powering the World’s Greatest Air Force image1.png
File details come from the government source that posted it. Updated .