Standard_Specifications_notice.docx

DOCX document 13 KB Posted

Attached to
Prop 411 Wards 2 & 6 Mill and Fill
Solicitation number
250042
Issued by
Pima County, Tucson City, Arizona

About this file

This is a Standard Specifications notice document issued by the Pima Association of Governments (PAG) in support of the City of Tucson's Proposition 411 funded mill and fill infrastructure project in Wards 2 and 6. The document incorporates the 2015 PAG Standard Specifications and Details for Public Improvements, including updates 2019-1, 2019-2, and 2020-1, as binding technical requirements for the project. The project encompasses street resurfacing and infrastructure improvements across nine neighborhoods, including Venice Addition, Glenn Heights, Carlos Terrace, Rose Hill, Palo Verde/Cloverleaf, Warsaw/Cloverleaf, Swan Way, and Speedway Addition, spanning approximately 17.87 centerline miles and 342,017 square yards of roadway treatment. Key deliverables include milling and replacing existing asphalt with 2-inch low volume PAG Mix 2 and PG 76-22 TR+ binder, constructing 169 ADA-compliant curb access ramps, installing 25 speed humps, and replacing 2 speed tables. A pre-bid meeting is scheduled for October 21, 2024, at 2:00 pm, with final bids due on October 30, 2024, at 2:00 pm Arizona local time. The project must be completed within 240 consecutive calendar days from the notice to proceed.

The estimated project cost is over $10 million based on the Engineer's Opinion of Probable Cost of $10,314,917. The project is funded through Proposition 411 and requires contractors to meet a 4% Small Business Enterprise (SBE) participation goal with identified subcontracting opportunities in concrete, underground utility, traffic control, and trucking. Successful bidders must provide performance and payment bonds for 100% of the contract amount and comprehensive insurance coverage including commercial general liability, commercial automobile liability, and worker's compensation, with liquidated damages assessed at $2,790 per calendar day of delay. The procurement incorporates federal compliance requirements including domestic preference provisions and equal opportunity guidelines. Where conflicts arise between the Special Provisions and the PAG Standard Specifications and Details, the Special Provisions shall prevail. The 2015 PAG Standard Specifications and Details are available for purchase in printed or electronic format through the PAG website at http://apps.pagregion.com/standardspecifications/.

View the file

Other files

File Type Posted
Prop_411_Wards_2_&_6_Mill_and_Fill.pdf PDF
Prop_411_Wards_2_&_6_Mill_and_Fill.pdf PDF
Standard_Specifications_for_DTM.pdf PDF
IFB_250042_Bid_Schedule.xlsx XLSX spreadsheet
IFB_250042_SBE_Provisions.pdf PDF
IFB_250042_Special_Provisions.pdf PDF
Standard_Specifications_for_DTM.pdf PDF
IFB_250042_Bid_Schedule.xlsx XLSX spreadsheet
IFB_250042_SBE_Provisions.pdf PDF
IFB_250042_Special_Provisions.pdf PDF
Contractor_Responsibilty_Form.pdf PDF
Offer_and_Acceptance_Page.pdf PDF
Contractor_Responsibilty_Form.pdf PDF
Offer_and_Acceptance_Page.pdf PDF
COT_ARPA_Terms_and_Conditions.pdf PDF
COT_ARPA_Terms_and_Conditions.pdf PDF
HUD-5369.PDF PDF
Prop_411_Goal_Memo_FY25.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx XLSX spreadsheet
Prop_411_Phase_1_Ward_2_-_Ward_6_Est_2024-09-19.pdf PDF
Prop_411_Goal_Memo_FY25.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_SP_2024-09-19.pdf PDF
SBE_Commitment_form.doc DOC document
HUD-5370.pdf PDF
HUD-5369.PDF PDF
HUD-5370.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx XLSX spreadsheet
Prop_411_Phase_1_Ward_2_-_Ward_6_Est_2024-09-19.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_SP_2024-09-19.pdf PDF
SBE_Commitment_form.doc DOC document
Standard_Specifications_notice.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD SPECIFICATIONS AND DETAILS

The 2015 Pima Association of Governments (PAG) Standard Specifications and Details for Public Improvements, together with updates 2019-1, 2019-2 and 2020-1 are incorporated herein by this reference and are as much a part of this document as if they were attached hereto or as they may be modified herein.

In the event of any conflict, seeming or real, between the Special Provisions contained herein and the above-referenced Standard Specifications and Details, these Special Provisions shall prevail.

Copies of the 2015 Pima Association of Governments (PAG) Standard Specifications and Details for Public Improvements are available (printed or electronic download) for order online at: http://apps.pagregion.com/standardspecifications/

File details come from the government source that posted it. Updated .