The document is a Bid Schedule for the City of Tucson's Prop 411 Phase 1 project covering Wards 2 through 6, detailing a comprehensive street resurfacing and infrastructure improvement initiative. The project encompasses approximately 342,017 square yards of roadway, involving removal of existing pavement, milling, grading, and reconstruction with new aggregate base and asphaltic concrete. Key work elements include installing 25 speed humps, 2 speed tables, adjusting 229 sewer manholes/cleanouts, resetting 167 survey monuments, and constructing 3,672 linear feet of curb ramps and 10,140 square feet of sidewalk. The project also includes 169 curb access ramps and approximately 350,000 square yards of mill and fill using 2" of PAG Mix #2 with PG 76-22TR+ binder.

The bid schedule includes several financial provisions, with a miscellaneous landscape work allowance of $40,000 and an incidental items allowance of $60,000. The project is funded through Prop 411 and will improve infrastructure in multiple Tucson neighborhoods including Venice Addition, Glenn Heights, Carlos Terrace, Rose Hill, Palo Verde/Cloverleaf, Warsaw/Cloverleaf, Swan Way, and Speedway Addition. The bid includes detailed unit pricing for various construction activities such as pavement marking, traffic control, and material adjustments, with quantities specified for each line item. The comprehensive scope suggests a significant municipal infrastructure renewal effort targeting street conditions, accessibility, and neighborhood improvements.

View the file

Other files

File Type Posted
Prop_411_Wards_2_&_6_Mill_and_Fill.pdf PDF
IFB_250042_Bid_Schedule.xlsx XLSX spreadsheet
IFB_250042_Special_Provisions.pdf PDF
IFB_250042_SBE_Provisions.pdf PDF
Standard_Specifications_for_DTM.pdf PDF
Contractor_Responsibilty_Form.pdf PDF
Offer_and_Acceptance_Page.pdf PDF
COT_ARPA_Terms_and_Conditions.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_SP_2024-09-19.pdf PDF
HUD-5370.pdf PDF
SBE_Commitment_form.doc DOC document
Prop_411_Goal_Memo_FY25.pdf PDF
Standard_Specifications_notice.docx DOCX document
HUD-5369.PDF PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_Est_2024-09-19.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

CITY OF TUCSON
PROP 411 PHASE 1 WARD 2 - WARD 6
BID SCHEDULE
Agency :City of Tucson
Project No :-
Project :Prop 411 Phase 1 Ward 2 - Ward 6
ITEM NO.ITEM DESCRIPTIONUNITQUANTITYUNIT PRICEAMOUNT
1100201PAVEMENT DEFICIENCY CREDITS-NO BID
2020001REMOVAL OF STRUCTURES & OBSTRUCTIONSL.S.1
2020029REMOVAL OF BITUMINOUS PAVEMENT (BY MILLING)S.Y.342,017
2050004ROADWAY GRADING (DISCRETIONARY)S.Y.342,017
3030003AGGREGATE BASE (DISCRETIONARY)C.Y.4,800
4060012ASPHALTIC CONCRETE (MIX NO. 2)TON37,964
4060014ASPHALTIC CONCRETE (CRACKS BETWEEN 1" AND 3") (DISCRETIONARY)TON380
4060015ASPHALTIC CONCRETE (MISC PVMT PATCHING) (DISCRETIONARY)TON1,139
4060200ASPHALTIC CONCRETE (SPEED HUMP)EACH25
4060201ASPHALTIC CONCRETE (SPEED TABLE)EACH2
4060510BITUMINOUS MATERIAL PRICE ADJUSTMENT ALLOWANCEL.S.1
5090110SEWER MANHOLE/CLEANOUT, ADJUSTMENTEACH229
5103101POTABLE WATER, ADJUST VALVE BOX AND COVEREACH349
7010005TRAFFIC CONTROLL.S.1
7010025FLASHING ARROW PANELEA/DAY480
7010027CHANGEABLE MESSAGE BOARDEA/DAY480
7040005PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090")L.F.18,790
7040006PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090")L.F.23,590
7040130PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) TRANSVERSE) (0.090")L.F.2,810
7050090PAVEMENT MARKING, PREFORMED, TYPE I, SYMBOLEACH19
7060025PAVEMENT MARKER, REFLECTIVE, (TYPE D, YELLOW, TWO-WAY)EACH594
7080001PAINTED PAVEMENT MARKINGEACH45,190
7080100PAVEMENT MARKING (PORTLAND GREEN PERMANENT PAINT)S.Y.154
8080111MISCELLANEOUS LANDSCAPE WORK ALLOWANCEUSD40,000$ 1.00
9010001MOBILIZATIONL.S.1
9080001CONCRETE CURB, (STD. DTL. 209) (TYPE 1)L.F.281
9080005CONCRETE CURB, (STD. DTL. 209) (TYPE 2)L.F.198
9080006CONCRETE WEDGE CURB (STD. DTL. 209)L.F.2,113
9080040CONCRETE CURB (RAMP CURB)L.F.3,672
9080201CONCRETE SIDEWALKS.F.10,140
9080290CURB ACCESS RAMPS.F.18,540
9090031SURVEY MONUMENT, RESET FRAME AND COVEREACH167
9300100INCIDENTAL ITEMS ALLOWANCEUSD60,000$ 1.00
TOTAL CONTRUCTION COST$0

&"Arial,Regular"&8&F &"Arial,Regular"&8&A &"Arial,Regular"&8&P of &N