This document is a Special Provisions file for a Proposition 411 Mill and Fill Project involving the City of Tucson, Department of Transportation and Mobility (DTM), and multiple neighborhood districts. The project encompasses mill and fill resurfacing of streets and construction of curb access ramps in nine neighborhoods: Venice Addition, Glenn Heights, Rose Hill Estates, Pima Verde, Cloverleaf, Warsaw, E Speedway Tracts, W Swan Way Addition, and Carlos Terrace. The total project scope includes 17.87 centerline miles and 342,017 square yards of roadway treatment, with 169 curb access ramps to be constructed. The work will be completed within 240 consecutive calendar days from the notice to proceed, utilizing a 2-inch asphalt mill and replace process with low volume PAG Mix 2 and PG 76-22 TR+ binder.
The project is funded through Proposition 411 and will involve milling existing asphalt, preparing roadway surfaces, installing new asphalt, replacing speed humps and tables, and constructing ADA-compliant curb access ramps. The contract will use performance-graded asphalt binders meeting specific technical specifications, with particular attention to traffic control, erosion management, and utility coordination. The work includes comprehensive requirements for surface preparation, herbicide application, pavement treatment, and post-construction restoration. Contractors will be responsible for detailed traffic management, resident notifications, and maintaining access to residential and commercial properties throughout the construction process.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
PROPOSITION 411
WARD 2 – WARD 6 AREA MILL & FILL
SPECIAL PROVISIONS FOR
PROPOSITION 411 PHASE 1 PROJECT
d
Date Signe
.C
ATE NO
CIFITRE
A
ANOZIR
, U A..S.
s
R seforPderetsige ional Engineer (Civi)l
60430
TIMOTHY J.
RHINE
9 18 24
TABLE OF CONTENTS
DESCRIPTION
SPECIFICATIONS AND DETAILS:
PROPOSED WORK:
ROADWAY TREATMENT:
WORK SCHEDULE:
CONSTRUCTION SEQUENCE:
GENERAL REQUIREMENTS:
SECTION 106 - CONTROL OF MATERIAL
SECTION 107 – LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC
SECTION 110 – CORRECTIVE REQUIREMENTS FOR DEFICIENCES
SECTION 202 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ITEM 2020029 – REMOVAL OF BITUNINOUS PAVEMENT (BY MILLING)
SECTION 205 – ROADWAY GRADING
ITEM 2050004 – ROADWAY GRADING (DISCRETIONARY)
SECTION 303 – AGGREGATE BASE COURSE
ITEM 3030003 – AGGREGATE BASE (DISCRETIONARY)
SECTION 406 – ASPHALT CONCRETE
ITEM 4060014 – ASPHALTIC CONCRETE (CRACKS BETWEEN 1” AND 3”) (DISCRETIONARY)
ITEM 4060015 – ASPHALTIC CONCRETE (MISC PVMT PATCHING) (DISCRETIONARY)
SECTION 701 – MAINTENANCE AND PROTECTION OF TRAFFIC
SECTION 908 – CONCRETE CURBS, GUTTERS, SIDEWALKS, AND DRIVEWAYS
SECTION 909 - SURVEY MONUMENTS
SECTION 1005 – BITUMINOUS MATERIALS FOR SURFACING
VENICE ADDITION
APPENDIX A – LOCATION MAP
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
APPENDIX C – CITY OF TUCSON SPEED HUMP AND SPEED TABLE STANDARD DETAILS
GLENN HEIGHTS
APPENDIX A – LOCATION MAP
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
ROSE HILL ESTATES
APPENDIX A – LOCATION MAP
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
PIMA VERDE, CLOVERLEAF
APPENDIX A – LOCATION MAP
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
CLOVERLEAF, WARSAW
APPENDIX A – LOCATION MAP
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
E SPEEDWAY TRACTS
APPENDIX A – LOCATION MAP
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
W SWAN WAY ADDITION
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES W
CARLOS TERRACE
APPENDIX B – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES
SPECIFICATIONS AND DETAILS:
The work embraced herein shall be performed in accordance with the requirements of the following separate documents:
Specifications
Pima Association of Governments (PAG), Standard Specifications for Public Improvement, 2015 Edition, Volume 1 (typically referenced as “Standard Specifications” unless otherwise specified).
http://apps.pagnet.org/standardspecifications
Details
Pima Association of Governments (PAG), Standard Details for Public Improvements, 2015 Edition, Volume 2.
http://apps.pagnet.org/standardspecifications/
Pima County/City of Tucson, Standard Specifications for Public Improvements, 2003 Edition
Pima County Department of Transportation, Curb Access Ramp Detail, April 2010.
https://www.pima.gov/978/Standard-Details
Manuals
U.S. Department of Transportation, Federal Highway Administration, Manual on Uniform Traffic
Control Devices for Streets and Highways, December 2009, and amendments.
https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm
Arizona Supplement to the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition
(January 2012).
https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf
2015 Edition of the Additions by the City of Tucson to the Manual on Uniform Traffic Control
Devices, for Temporary Traffic Control.
https://www.tucsonaz.gov/files/sharedassets/public/government/departments/department-of-transportation-and-mobility/documents/2015_cot_additions_final.pdf
Pima County/City of Tucson, Signing and Pavement Marking Manual, December 2020 First Edition https://content.civicplus.com/api/assets/c8d13f95-b46c-446e-97fe-8e5127201983
Other Specifications and Details
Arizona Department of Transportation Standard Specifications for Road and Bridge Construction, 2021 Edition, https://azdot.gov/sites/default/files/media/2021/04/2021_Standard_Specifications_for_Road_and_B ridge_Construction_PC.pdf http://apps.pagnet.org/standardspecifications http://apps.pagnet.org/standardspecifications/ https://www.pima.gov/978/Standard-Details https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2Ffiles%2Fsharedassets%2Fpublic%2Fgovernment%2Fdepartments%2Fdepartment-of-transportation-and-mobility%2Fdocuments%2F2015_cot_additions_final.pdf&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=eDViWdaiewqSjwfNNadXSUs8NCe4FF4CnF427gAuiB0%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2Ffiles%2Fsharedassets%2Fpublic%2Fgovernment%2Fdepartments%2Fdepartment-of-transportation-and-mobility%2Fdocuments%2F2015_cot_additions_final.pdf&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=eDViWdaiewqSjwfNNadXSUs8NCe4FF4CnF427gAuiB0%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcontent.civicplus.com%2Fapi%2Fassets%2Fc8d13f95-b46c-446e-97fe-8e5127201983&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=TJEOcFxLo5qVCqHKWbF2TZYuaYD4iRS4qpCjiVC%2Blao%3D&reserved=0 https://azdot.gov/sites/default/files/media/2021/04/2021_Standard_Specifications_for_Road_and_Bridge_Construction_PC.pdf https://azdot.gov/sites/default/files/media/2021/04/2021_Standard_Specifications_for_Road_and_Bridge_Construction_PC.pdf
Pima County Regional Wastewater Reclamation Department, Standard Specifications & Details for
Construction, 2022 Edition:
https://www.pima.gov/1812/Design-Standards-Specifications-Details
Tucson Water, Standard Specifications and Details, 2017 Edition:
https://www.tucsonaz.gov/Departments/Water/Contractors-Developers-and-Engineers/Tucson-
Water-Standard-Specifications-and-Details
These Special Provisions and Bidding Schedule.
https://www.pima.gov/1812/Design-Standards-Specifications-Details https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2FDepartments%2FWater%2FContractors-Developers-and-Engineers%2FTucson-Water-Standard-Specifications-and-Details&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Un6C51JepZXXUzEiK8wLR%2BOBSZOGWrWq7yld2K8x0Sk%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2FDepartments%2FWater%2FContractors-Developers-and-Engineers%2FTucson-Water-Standard-Specifications-and-Details&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Un6C51JepZXXUzEiK8wLR%2BOBSZOGWrWq7yld2K8x0Sk%3D&reserved=0
WARD 2 – WARD 6 AREA MILL & FILL
PROPOSED WORK:
The proposed work is located in the City of Tucson city limits. The work under this project includes milling, pavement preparation, and paving of residential streets for the locations table below and maps in Appendix A.
The proposed work is in the Venice Addition, Glenn Heights, Rose Hill Estates, Pima Verde, Cloverleaf, Warsaw, E Speedway Tracts, W Swan Way Addition, and Carlos Terrace neighborhoods.
PROJECT ROADWAY LIST
VENICE
ADDITION ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
4376 131435_1_2 E Patricia St 142ft W WPI N
Rosemont Av WPI N Beverly Av 0.25 4,736
4873 131435_1_2 E San
Francisco Bl EPI N Beverly Av
WPI N Craycroft
Rd
0.25 3,509
4872 131435_1_2 E San
Francisco Bl EPI N Swan Rd
WPI N Orlando Av
0.23 1,867
6578 131435_1_2 N Beverly Av SPI E Fort Lowell
Rd NPI E San
Francisco Bl
0.12 1,462
6579 131435_1_2 N Beverly Av NPI E San
Francisco Bl NPI E Glenn St 0.10 2,208
7115 131435_1_2 N Cloverland
Av 200ft N NPI E
Patricia St NPI E Glenn St 0.17 3,260
8616 131435_1_2 N Magnolia
Av SPI E Patricia St NPI E Glenn St 0.12 2,311
9107 131435_1_2 N Orlando
Av SPI E Fort Lowell
Rd NPI E Glenn St 0.24 2,268
9576 131435_1_2 N Rosemont
Av
EPI N Rosemont
Av
130ft E EPI N
Rosemont Av
0.02 751
9577 131435_1_2 N Rosemont
Av SPI E Patricia St NPI E Glenn St 0.12 2,311
9655 131435_1_2 N Saint
Augustine Pl SPI E Fort Lowell
Rd 653ft S SPI E Fort
Lowell Rd
0.12 1,741
9823 131435_1_2 N Sherry Av SPI E Patricia St NPI E Glenn St 0.12 2,311
9836 131435_1_2 N Sidney Bl SPI E San
Francisco Bl NPI E Glenn St 0.10 1,849
10180 131435_1_2 N Torino Av SPI E Fort Lowell
Rd NPI E Glenn St 0.25 3,467
10606 131435_1_2 N Woodland
Av SPI E San
Francisco Bl NPI E Glenn St 0.10 1,156
2841 131435_1_2 E Fort Lowell
Rd
175ft E CL N
Swan Rd
20ft W WPI N
Torino Av
0.08 1,381
2842 131435_1_2 E Fort Lowell
Rd
20ft W WPI N
Torino Av
WPI N Craycroft
Rd
0.89 14,666
2840 131435_1_2 E Fort Lowell
Rd CL N Swan Rd
175ft E CL N Swan Rd
0.03 797
Venice Addition
Total:
3.34 52,052
GLENN
HEIGHTS
ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
1105 131435_3 E Alta Vista
St
EPI N Mountain
View Av
600ft E EPI N
Arcadia Av
0.21 4,400
1374 131435_3 E Bermuda
St EPI N Arcadia Av
580ft E EPI N Arcadia Av
0.11 2,062
1373 131435_3 E Bermuda
St EPI N Swan Rd
WPI N Avenida Carolina
0.19 3,920
WARD 2 – WARD 6 AREA MILL & FILL
2226 131435_3 E Copper St EPI N Nema Av 570ft E EPI N
Arcadia Av
0.30 5,267
2934 131435_3 E Glenn St SPI E Glenn St 160ft S SPI E
Glenn St
0.03 595
2936 131435_3 E Glenn St SPI E Glenn St 160ft S SPI E
Glenn St
0.03 595
2937 131435_3 E Glenn St SPI E Glenn St 160ft S SPI E
Glenn St
0.03 595
5439 131435_3 E Towner St EPI N Arcadia Av 600ft E EPI N
Arcadia Av
0.11 2,400
5438 131435_3 E Towner St EPI N Nema Av WPI N Arcadia
Av
0.13 2,489
6288 131435_3 N Arcadia Av SPI E Glenn St 70ft S SPI E Copper St
0.25 5,200
6355 131435_3 N Avenida
Carolina
WPI E Bermuda
St WPI E Copper St 0.09 1,932
8901 131435_3 N Mountain
View Av SPI E Glenn St
NPI E Bermuda St
0.11 2,084
8934 131435_3 N Nema Av SPI E Bermuda St EPI E Copper St 0.11 2,280
9582 131435_3 N Rosemont
Bl
0ft N NPI E Grant
Rd
602ft N NPI E
Grant Rd
0.11 2,742
10087 131435_3 N Swan Rd 131ft N NPI E Bermuda St
NPI E Bermuda St
0.02 262
10088 131435_3 N Swan Rd SPI E Bermuda St 651ft S SPI E Bermuda St
0.12 1,302
Glenn Heights
1.96 38,126
ROSE HILL
ESTATES ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
5303 141401_1 E Sunny Dr SPI E Grant Rd WPI N Wilmot
Rd
0.37 6,969
Rose Hill
Estates Total:
0.37 6,969
PIMA VERDE,
CLOVERLEAF
ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
4381 141402_1 E Peach St EPI N Beverly Av NPI E Waverly
St
0.07 1,233
9837 141402_1 N Sidney Pl 270ft N NPI E
Lester St NPI E Lester St 0.05 1,080
10607 141402_1 N Woodland
Av EPI E Waverly St EPI E Lester St 0.16 3,480
5693 141402_1 E Waverly St EPI N Beverly Av NPI E Peach St 0.12 2,080
3728 141402_1 E Linden Pl EPI N Beverly Av 450ft E EPI N
Beverly Av
0.09 2,000
3751 141402_1 E Linden St EPI N Woodland
Av WPI N Craycroft
Rd
0.11 2,380
8617 141402_1 N Magnolia
Av SPI E Seneca St NPI E Pima St 0.24 5,160
4974 141402_1 E Seneca St SPI N Magnolia
Av
SPI N
Cloverland Av
0.07 1,520
7116 141402_1 N Cloverland
Av SPI E Seneca St NPI E Pima St 0.25 5,200
5694 141402_1 E Waverly St EPI N Woodland
Av
WPI N Craycroft
Rd
0.12 2,460
3692 141402_1 E Lester St EPI N Woodland
Av
WPI N Craycroft
Rd
0.12 2,440
6580 141402_1 N Beverly Av SPI E Grant Rd NPI E Pima St 0.47 9,960
4380 141402_1 E Peach St EPI N Rosemont
Bl WPI N Magnolia
Av
0.12 2,520
3669 141402_1 E Lester Pl EPI N Beverly Av 450ft E EPI N
Beverly Av
0.09 2,000
2121 141402_1 E Citrus St EPI N Rosemont
Bl WPI N Magnolia
Av
0.12 2,520
Pima Verde, Cloverleaf
2.19 46,033
CLOVERLEAF,
WARSAW ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
8544 141402_2 N Linden Pl SPI E Linden St 200ft S SPI E
Linden St
0.04 800
3668 141402_2 E Lester Pl 200ft W WPI N
Arcadia Av WPI N Arcadia
Av
0.04 800
8903 141402_2 N Mountain
View Av NPI E Linden St NPI E Pima St 0.12 2,418
8902 141402_2 N Mountain
View Av SPI E Grant Rd NPI E Linden St 0.36 6,777
6289 141402_2 N Arcadia Av SPI E Grant Rd NPI E Pima St 0.48 10,160
8915 141402_2 N Nancy Rose Bl
SPI E Seneca St NPI E Pima St 0.24 5,156
9739 141402_2 N Santa Rosa Av
SPI E Seneca St NPI E Pima St 0.24 5,160
14397 141402_2 N Frances Bl SPI E Seneca St NPI E Pima St 0.24 3,440
14396 141402_2 N Frances Bl SPI E Seneca St NPI E Pima St 0.24 3,440
3150 141402_2 E Hampton
St EPI N Swan Rd
WPI N Arcadia Av
0.23 4,920
5692 141402_2 E Waverly St EPI N Swan Rd WPI N Arcadia
Av
0.23 4,920
2551 141402_2 E Edison St EPI N Mountain
View Av WPI N Arcadia
Av
0.12 2,512
4973 141402_2 E Seneca St EPI N Swan Rd
WPI N
Rosemont Bl
0.47 10,000
2550 141402_2 E Edison St EPI N Swan Rd WPI N Mountain
View Av
0.11 2,400
3750 141402_2 E Linden St EPI N Swan Rd WPI N Arcadia
Av
0.23 4,920
Cloverleaf, Warsaw Total:
3.42 67,823
E SPEEDWAY
TRACTS
ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
6292 141411_2_E N Arcadia
Av
SPI E Speedway
Bl NPI E 5th St 0.49 9,209
3194 141411_2_E E
Hawthorne
St
EPI N Arcadia Av
WPI N
Rosemont Bl
0.24 4,516
1248 141411_2_E E Baker St EPI N Arcadia Av
WPI N
Rosemont Bl
0.24 4,516
795 141411_2_E E 4th St EPI N Arcadia Av
WPI N
Rosemont Bl
0.24 4,516
524 141411_2_E E 2nd St EPI N Arcadia Av
WPI N
Rosemont Bl
0.24 4,516
9743 141411_2_E N Santa
Rosa Av
SPI E Speedway
Bl NPI E 4th St 0.37 7,712
163 141411_2_E E 1st St EPI N Arcadia Av
WPI N
Rosemont Bl
0.24 4,480
708 141411_2_E E 3rd St EPI N Arcadia Av
WPI N
Rosemont Bl
0.24 4,516
E Speedway Tracts Total:
2.30 43,979
W SWAN WAY
ADDITION ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
794 141411_2_W E 4th St EPI N Swan Rd WPI N Arcadia
Av
0.24 4,480
523 141411_2_W E 2nd St EPI N Swan Rd WPI N Arcadia
0.24 4,480
WARD 2 – WARD 6 AREA MILL & FILL
1247 141411_2_W E Baker St EPI N Swan Rd WPI N Arcadia
Av
0.24 4,480
162 141411_2_W E 1st St EPI N Swan Rd WPI N Arcadia
Av
0.24 4,480
707 141411_2_W E 3rd St EPI N Swan Rd WPI N Arcadia
0.24 4,480
W Swan Way
Addition Total:
1.19 22.400
CARLOS
TERRACE
ID
ZONE ROUTE FROM TO
TOTAL
LENGTH
[CL MI]
TOTAL
AREA
[SY]
1106 131436_3_4 E Alta Vista
St EPI N Craycroft
Rd WPI N Van Buren Av
0.21 3,972
2227 131436_3_4 E Copper
St EPI N Craycroft
Rd WPI N Van Buren Av
0.21 4,520
2943 131436_3_4 E Glenn St 193ft E CL N Van
Buren Av
WPI N Sahuara
Av
0.24 4,715
3483 131436_3_4 E Kelso St EPI N Craycroft
Rd 1160ft E EPI N Craycroft Rd
0.22 4,046
5030 131436_3_4 E Silver St EPI N Craycroft
Rd WPI N Van Buren Av
0.21 3,868
5210 131436_3_4 E Spring St EPI N Craycroft
Rd WPI N Van Buren Av
0.22 4,624
5440 131436_3_4 E Towner
St
EPI N Craycroft
Rd
1160ft E EPI N
Craycroft Rd
0.21 3,982
5664 131436_3_4 E Water St EPI N Craycroft
Rd WPI N Van Buren Av
0.21 3,897
8262 131436_3_4 N Jefferson
Av SPI E Copper St NPI E Spring St 0.15 3,248
8519 131436_3_4 N Leonora
Av SPI E Alta Vista
St NPI E Copper St 0.17 3,488
8522 131436_3_4 N Leonora
Pl SPI E Water St
128ft S SPI E
Water St
0.02 512
9642 131436_3_4 N Sahuara
Av NPI E Sahuaro
Ranch Dr 656ft N NPI E
Grant Rd
0.07 1,576
9641 131436_3_4 N Sahuara
Av WPI E Glenn St
NPI E Sahuaro Ranch Dr
0.29 6,148
9643 131436_3_4 N Sahuara
Av 656ft N NPI E
Grant Rd NPI E Grant Rd 0.12 2,624
10317 131436_3_4 N Van
Buren Av WPI E Copper St WPI E Spring St 0.19 3,972
10316 131436_3_4 N Van
Buren Av SPI E Glenn St
WPI E Alta Vista St
0.08 1,668
2942 131436_3_4 E Glenn St 125ft E CL N Craycroft Rd
193ft E CL N Van Buren Av
0.25 7,067
2941 131436_3_4 E Glenn St CL N Craycroft Rd 125ft E CL N Craycroft Rd
0.02 708
Carlos Terrace
3.10 64,635
Package Total: 17.87 CL MI 342,017 SY
Abbreviations:
Centerline (CL) – the imaginary line that is parallel to the curb or edge of pavement located in the middle of the roadway.
NCL is North of Centerline, ECL is East of Centerline, etc.
Point of Intersection (PI) – the imaginary line that would be the curb or edge of pavement if it was extended across an intersecting roadway. NPI is North Point of Intersection, EPI is East Point of Intersection, etc.
LC – Local Collector
WARD 2 – WARD 6 AREA MILL & FILL
PROJECT PAVEMENT SECTION LIST
TYPE TREATMENT
MIX
HV/LV MIX NO.
CEMENT
TYPE MIXTURE SPEC
Local
Street
2” asphalt plane/mill and replace
Low
Volume
PAG Mix
PG 76-22
TR+
Non-RAP
Section 406 Updated Spec Oct. 31, PROJECT CURB ACCESS RAMP REPLACEMENT LIST
N-S STREET E-W STREET RAMPS COUNT
E Francisco Lp E San Francisco Blvd 1 Type 4 (NW) 1
N Beverly Av E San Francisco Blvd 1 Type 4 (SE) 1
N Beverly Av E Patricia St 2 Type 4 (NW & SW) 2
N Cloverland Ave E Patricia St 4 Type 4 (NE, SE, SW, & NW) 4
N Magnolia Av E Patricia St 2 Type 4 (SE & SW) 2
N Rosemont Av N Rosemont Av (cul-de-sac) 2 Type 4 (NE & SE) 2
N Rosemont Av E Patricia St 2 Type 4 (SE & SW) 2
N Saint Augustine Pl E Fort Lowell Rd 1 Type 3 (SE) 1
N Sherry Av E Patricia St 2 Type 4 (SE & SW) 2
N Sidney Blvd E San Francisco Blvd 1 Type 3 (NW) 1
N Swan Rd E San Francisco Blvd 2 Type 4 (NE & SE) 2
N Swan Rd E Fort Lowell Rd 2 Type 4 (NW & SW) 2
Venice Addition Total: 22
N Swan Rd E Bermuda St 2 Type 4 (NE & SE) 2
N Nema Ave E Bermuda St 2 Type 4 (SW & SE) 2
N Nema Ave E Towner St 2 Type 4 (NE & SE) 2
N Mountain View Ave E Alta Vista St 2 Type 4 (NE & SE) 2
N Mountain View Ave E Bermuda St 2 Type 4 (NE & NW) 2
N Avenida Carolina E Towner St 2 Type 4 (SW & NW) 2
N Avenida Carolina E Copper St 2 Type 4 (NE & NW) 2
N Avenida Carolina E Bermuda St 1 Type 4 (SW) 1
N Arcadia Ave Alta Vista 4 Type 4 (NE, NW, SE & SW) 4
N Arcadia Ave E Bermuda St 2 Type 4 (NE & SE) 2
N Arcadia Ave E Towner St 2 Type 4 (NE & SE) 2
N Arcadia Ave E Copper St 4 Type 4 (NE, NW, SE & SW) 4
N Rosemont Blvd Commercial Drives 3 Type 4, 6 Type 2 9
Glenn Heights Total: 36
E Seneca St E Sunny Dr 1 Type 4 (SE) 1
E Adobe Pl E Sunny Dr 2 Type 4 (SW & SE) 2
WARD 2 – WARD 6 AREA MILL & FILL
E Diana Pl E Sunny Dr 2 Type 4 (SW & SE) 2
Dirt Alley (180' W of N Wilmot Rd)
E Sunny Dr 1 Type 2 (S) 1
Rose Hill Estates Total: 6
N Magnolia Av 280' N CL E Pima St 1 Type 3 (NW) 1
N Beverly Av E Grant Rd 2 Type 4 (SE & SW) 2
Pima Verde, Cloverleaf Total: 3
N Mountain Av E Seneca St 1 Type 2 (NW) 1
N Swan Rd E Edison St 1 Type 2 (NE) & 1 Type 4 (SE) 2
N Swan Rd E Hampton St 2 Type 2 (NE & SE) 2
N Swan Rd E Seneca St 1 Type 4 (NE) & 1 Type 2 (SE) 2
N Frances Bl E Seneca St 1 Type 4 (SW) & Type 2 (SE) 2
N Frances Bl E Seneca St 1 Type 2 (SW) & 1 Type 4 (SE) 2
N Swan Rd E Waverly St 2 Type 2 (NE & SE) 2
N Swan Rd E Linden St 2 Type 4 (NE & SE) 2
Cloverleaf, Warsaw Total: 15
Santa Rosa Bl. 4th St 1 Type 4 (NW) 1
Arcadia Ave 1st St 2 Type 2 (NE & SE) 2
E Speedway Tracts Total: 3
N Swan Rd E 1st St 2 Type 2 (NE & SE) 2
N Swan Rd E 2nd St 2 Type 2 (NE & SE) 2
N Swan Rd E 3rd St 2 Type 2 (NE & SE) 2
N Swan Rd E 4th St 1 Type 4 (NE) & 1 Type 1 (SE) 2
N Swan Rd E Baker St 2 Type 2 (NE & SE) 2
N Arcadia Ave E Baker St 1 Type 4 (SW) 1
W Swan Way Addition Total: 11
Jefferson Spring 2 Type 4 (NE & NW) 2
Jefferson Alley 2 Type 2 (NW & SW) 2
Jefferson Water 4 Type 4 (NE, NW, SE & SW) 4
Jefferson Alley 4 Type 2 (NE, NW, SE & SW) 4
Jefferson Silver 4 Type 4 (NE, NW, SE & SW) 4
Jefferson Alley 4 Type 2 (NE, NW, SE & SW) 4
Jefferson Copper 2 Type 4 (SE & SW) 2
WARD 2 – WARD 6 AREA MILL & FILL
Alley Water 2 Type 2 (SE & SW) 2
Leonora Pl Water 2 Type 4 (SE & SW) 2
Leonora Ave Copper 2 Type 4 (NE & NW) 2
Leonora Ave Alley 4 Type 2 (NE, NW, SE & SW) 4
Leonora Ave Towner 4 Type 4 (NE, NW, SE & SW) 4
Leonora Ave Alley 4 Type 2 (NE, NW, SE & SW) 4
Leonora Ave Kelso 4 Type 4 (NE, NW, SE & SW) 4
Leonora Ave Alley 4 Type 2 (NE, NW, SE & SW) 4
Leonora Ave Alta Vista 2 Type 4 (SE & SW) 2
Alley Water 2 Type 2 (SE & SW) 2
Van Buren Spring 1 Type 4 (NW) 1
Van Buren Water 2 Type 4 (NW & SW) 2
Van Buren Alley 2 Type 2 (NW & SW) 2
Van Buren Silver 2 Type 4 (NW & SW) 2
Van Buren Alley 2 Type 2 (NW & SW) 2
Van Buren Copper 1 Type 4 (SW) 1
Van Buren Alta Vista 1 Type 4 (NW) 1
Van Buren Glenn 2 Type 2 (SE & SW) 2
Neruda Ln Glenn 2 Type 4 (SE & SW) 2
Saramano Ln Glenn 2 Type 4 (SE & SW) 2
Sahara Ave Sun County Blvd 2 Type 2 (SE & NE) 2
Sonoita Pl Grant 2 Type 2 (NE & NW) 2
Carlos Terrace Total: 73
Package Total: 169 Ramps
RAMP AND SIDEWALK NOTES
• The City expects that the Contractor will have some flexibility in the layout of the ramps using City and PAG ramp details, provided that federal ADA standards are met.
• Sidewalks are to be constructed to PROWAG Standards; City or PAG standard details may be used, as applicable.
• No changes or modifications shall be made by the contractor without approval of a City representative.
• The removal of sidewalk and curb ramps is included in Item 2020001 Removal of Structures and Obstructions. Plans with the locations of sidewalk and curb ramp removals will not be provided. Field adjustments are anticipated. See General Requirements note number 19
Removal of Structures and Obstructions.
WARD 2 – WARD 6 AREA MILL & FILL
PROJECT SPEED HUMP & TABLES REPLACEMENT LIST
MAP STREET
SPEED HUMPS
EACH
SPEED TABLES
EACH
Venice Addition E San Francisco Blvd 2 Humps
Venice Addition N Torino Ave 2 Humps
Venice Addition N Orlando Ave 3 Humps
Glenn Heights Arcadia 2 Humps
Rose Hill Estates E Sunny Dr 4 Humps
Cloverleaf, Warsaw N Mountain Av 1 Humps
Cloverleaf, Warsaw N Arcadia Av 3 Humps
E Speedway Tracts Arcadia 2 Humps
W Swan Way Addition
1st Street 3 Humps
Carlos Terrace Glenn Street 2 Tables
Carlos Terrace Sahuara Ave 3 Humps
Package Total: 25 Humps 2 Tables
Package Total: 25 Humps & 2 Tables
SPEED HUMP & TABLES NOTES
Surface treatment shall include the speed humps and tables with new striping and raised pavement markings per Detail 220 (included in Appendix C). Speed tables and speed humps shall receive the PAG 2-LV, as a non-RAP mixture with PG70-10 binder.
WARD 2 – WARD 6 AREA MILL & FILL
ROADWAY TREATMENT:
Treatment A – Mill and Infill
ID TREATMENT A - MILL AND INFILL
1 Data Collection:
-Contractor shall identify and document existing roadway features including pavement markings, utility facilities, survey monumentation, and speed humps.
-The City’s surveyor will cross-section the roadway prior to the treatment in order to provide pavement grades.
2 Pavement Preparation:
-Contractor shall adjust utility facilities (as required) prior to and after work efforts. No utility holes will be left overnight without trench plates.
-Contractor shall remove obstructions and eradicate any vegetation within or adjacent to the roadway necessary to execute the contract.
3 ADA Ramps:
-Contractor shall remove and replace ADA ramps per the table information provided. New ramps are only to be installed where there is existing sidewalk.
-Contractor shall complete replacement of any and all landscape materials (brick, gravel, etc.) removed or relocated during the curb ramp/sidewalk installation in an attempt to return these materials to state of pre-ramp installation.
-Contractor shall complete any other miscellaneous work necessary to deliver the final product, complete in place, of the completed curb ramp installation.
4 Milling:
-Contractor shall mill/plane the existing asphalt per the depth identified in the Project Roadway List.
5 Subgrade Preparation:
-When the existing asphalt remaining is thin and not suitable for overlay operations, Contractor shall run a sheepsfoot roller on the remaining asphalt and prepare the subgrade for pavement.
-Contractor shall prepare subgrade for paving per PAG Standard Specifications for Public Improvements, 2015 Edition, Section 205. Expected preparation shall include but is not limited to grading and shaping of subgrade to allow positive drainage away from road or across drainage areas such as washes, compacting subgrade to a point that is acceptable for pavement placement, hydration of subgrade material to promote desired compaction and any other work consistent with prior to paving operations.
6 Paving:
- When there is existing asphalt remaining, Contractor shall sweep existing milled roadway where required and tack with Certified Boot Truck using CSS1 50/50 dilute at a maximum application rate of .08 gallons/SY and tack all vertical surfaces. Note: When the bid schedule quantities for the pavement milling and the roadway grading items are similar, the existing asphalt surface to remain is not anticipated for the project.
-Contractor shall pave new asphalt per the depth identified in the Project Treatment List.
7 Finish Work:
-Contractor shall replace all survey monumentation disturbed during work efforts in kind.
-Contractor shall replace all traffic marking/striping (paint, symbols, legends, thermoplastic, raised pavement markers) and match to standard using Pima County and City of Tucson Department of Transportation Signing and
Pavement Manual, December 2020, First Edition. Note: Traffic marking/striping may not be anticipated for the project. See bid schedule for pavement marking bid items.
-Contractor shall replace signage impacted as part of this project.
-Contractor shall complete any other miscellaneous work necessary to deliver final paved roadway, complete and in place.
-If speed humps are present on any roadway on the project list, contractor shall replace speed humps that were removed during the milling process.
WORK SCHEDULE:
Proposed work is to be completed within 240 consecutive calendar days from the date of the notice to proceed. Construction sequencing and expectations shall be as described herein. Construction, including permanent striping, must be completed within this time frame. The Contractor shall consider the following contract requirements:
• The Contractor shall schedule a pre-construction meeting within 14 calendar days of notice of award and hold the meeting within 30 days of notice of award.
• The Contractor shall prepare traffic control plans prior to the pre-construction meeting in accordance with these specifications. The Contractor shall, at a minimum, be required to
WARD 2 – WARD 6 AREA MILL & FILL
maintain at least one open lane of traffic unless the Contractor offers an alternative traffic control approach that will minimize disturbance to residents and businesses along the project.
No contract time extensions will be granted to the Contractor for the DTM approval of a traffic control plan.
• DTM will issue a notice to proceed at the pre-construction meeting.
• At the pre-construction meeting, the Contractor shall submit a critical path construction schedule for all project elements that meets or decreases the allotted Calendar Contract Days.
• All work shall be done during the day.
CONSTRUCTION SEQUENCE:
The Contractor shall be issued a Notice to Proceed at the Pre-Construction meeting. The Contractor shall field verify all existing conditions shown on plans and specified herein prior to beginning construction. Any significant deviations to the conditions that may affect the timely construction of improvements shall be brought to the attention of the Engineer within 24 hours of discovery.
Prior to the delivery of any equipment, materials or supplies to the site of any work, or the beginning of any construction work, it is strongly recommended that the Contractor take pre-construction photos or videos for the purpose of establishing the conditions existing in all the areas to be affected by the construction.
The Contractor shall follow the sequencing and/or steps as described under Treatment A. Paving schedules shall be coordinated closely with any weather. Pavement data is provided in the Proposed
Work Section. If the paving operation is not started directly behind the milling, grading and compaction steps and weather-related issues arise, the contractor will be held responsible for any issues that may arise.
ID CONTRACTOR REQUIREMENTS
1 Contractor shall not leave any areas milled over a weekend and/or holiday period for any reason if not previously approved by Field Engineering.
2 Contractor shall shore up edge of pavement at all driveways, mailboxes and areas not level with new pavement within one week of completion of paving roadway/street.
3 Contractor to match improved driveways with asphalt (i.e., brick, concrete, or asphalt).
4 Contractor shall have all utility adjustments, including water, sewer, and survey, completed within 30 days of completion of paving for roadway, street or subdivision unless prior approval from Field Engineering has been obtained.
5 Contractor shall re-install speed humps, when removed for paving operations, within 45 days of completion of paving for roadway, street or subdivision unless prior approval from Field Engineering has been obtained.
6 Contractor is not allowed to place millings on shoulder unless prior approval from Field Engineering has been obtained.
7 Chip Seal tabs shall be placed upon final asphalt placement and removed prior to thermoplastic stripe installation.
Contractor is to lay out temporary striping and give the City 3 working days to review prior to installation. Temporary striping shall be installed within 7 days of final asphalt placement and must include all striping, i.e., shoulder, stop bars, pavement marking legends. Temporary stripe application rate and bead quantity shall be approved by Field Engineering. Note: Traffic marking/striping may not be anticipated for the project. See bid schedule for pavement marking bid items.
8 Final Thermoplastic Striping shall be completed 21-30 calendar days after temporary stripe placement for roadway, street, or subdivision unless prior approval from Field Engineering. Application rate and bead quantity shall be approved by Field Engineering. Note: Traffic marking/striping may not be anticipated for the project. See bid schedule for pavement marking bid items.
9 Cleanup shall be completed within 10 calendar days of all utility adjustments for roadway, street, or subdivision unless prior approval from the Engineer.
WARD 2 – WARD 6 AREA MILL & FILL
GENERAL REQUIREMENTS:
1. Maintenance and Protection of Traffic
Description and Construction
Traffic control shall protect vehicles and pedestrian traffic in the work area and from construction equipment. Traffic control shall comply with the referenced traffic control manuals and guidelines.
The Contractor shall prepare and construct a Traffic Control Plan and Detour Plan for construction for each neighborhood. The traffic control plan shall comply with all dimensions, signing, restrictions, signalization, and detours for all phases of construction. Approved detour plans shall be in-place and approved by the City of Tucson prior to starting construction. No construction shall be done unless the approved traffic control signs are in place.
Contractor shall take into consideration the parking requirements and situations during the performance of the work and shall prepare a construction schedule to reflect a “construction phasing work” to ensure residents and businesses will have adequate parking at nearby streets and minimizing the inconvenience of finding distant parking during the course of the work.
Convenient access to all residences and businesses shall be maintained and shall be available at all times during construction. It shall be the Contractor’s responsibility to coordinate his work with the residents and businesses so as to minimize local traffic through the work area. Closure of roadways to through traffic may be allowed with prior approval of the Engineer. Requests for roadway closure shall be made in writing at least five (5) days in advance for the Engineer’s review and for ample time for notification and posting.
The Contractor shall be required to maintain at least one open lane of traffic unless the Contractor offers a traffic control approach that will minimize disturbance to residents. Appropriate signage and flagmen shall be utilized at all times during one lane operation. The Contractor is advised of peak period traffic during the following intervals:
Morning 7:00 a.m. to 9:00 a.m.
Evening 4:00 p.m. to 6:00 p.m.
Public Posting and Notification
It shall be the Contractor's responsibility to contact adjacent property owners one week prior to construction.
The Contractor shall:
1. With City guidance, prepare and distribute notification letter to affected residents and businesses. The letter shall provide information on the date and time when the work will commence, parking restrictions when conducting the work, contractor contact numbers for any additional information, and other relevant information on the project and scope of the work.
2. Message Boards shall also be utilized to notify the traveling public.
3. Post No-Parking signs (as necessary) stating actual dates & times work is to commence and restricting access to private properties.
4. Maintain access to all side streets, access roads, business, residences, driveways, alleys, and parking lots except for the period when the paving operation is being conducted with required curing time.
WARD 2 – WARD 6 AREA MILL & FILL
5. Post No Lane Marking signs prior to striping activities.
The Engineer shall be immediately notified if there are changes in the dates and times of the posted No-Parking signs. The contractor shall change the posted signs to read the revised dates and time and re-distribute a revised notification letter to affected residents.
No work shall be allowed to commence unless the conditions and requirements of this specification section is adhered to. Failure of the contractor to abide by this specification section shall be grounds for the City to suspend work.
Re-posting of street postings, distribution of notices, and re-mobilization shall be performed by the contractor per the requirements of the special provisions and these specifications. Contractor shall be charged for the working days for the suspension of the work, including re-posting, re-distributing of notices, all mobilization and demobilization for this scope of work at no additional cost to the City.
Throughout the duration of construction, access to SunTran bus stops shall be maintained. When access to a bus stop is restricted or relocation of a bus stop is requested by the Contractor, and where the Engineer determines that relocation of a bus stop is necessary to maintain access, the Contractor shall notify SunTran Operation ((520) 206-8934) and Davita Mueller at SunTran ((520) 206-8825) or Jackie Basterfield ((520) 206-8807) 5 days in advance of work at that location.
Access to all schools shall be maintained during hours of school operation and activities. The Contractor shall coordinate his work with each school site administrator.
The Contractor shall not store equipment, supplies, materials, or debris on the sidewalks or bike paths.
There shall be no separate pay item for the cost of the resident notification and shall be included as part of the overall project.
2. Permits
Before undertaking work at any location covered by this project, the Contractor shall obtain all applicable permits, including but not limited to: air quality permits, water quality permits, street closure permits, and permits required to adjust any sanitary sewer facilities. Excavation permits, issued by the City of Tucson Engineering Division, for work in public rights-of-way, shall not be required if the work is being done under a contract administered by the City of Tucson, Department of Transportation and Mobility.
3. Disposal of Materials
Any unutilized excess asphalt millings shall be the property of the City of Tucson Transportation
Department and the price to haul and stockpile them shall be included in the cost of Pavement Removal by Milling. All millings shall be delivered to the Los Reales Landfill located at Los
Reales Road and Swan Road. The contractor will need to provide all equipment to stockpile the millings. Contact Frank Bonillas or Justin Nicholas at the City of Tucson Environmental and
General Services Department at 520.837.3814 to coordinate access.
4. Proposition Construction Signs
Two Proposition 411 signs shall be required to be installed at the beginning limits of each project segment prior to the start of work. Signs shall be provided by DTM; however, it is the Contractor’s responsibility to pick them up at the City’s storage yard, maintain the signs, and relocate them to each project segment. The Contractor shall be responsible for replacing any damaged or lost signs at no cost to the Department. There shall be no payment for the installation and removal of these signs.
The Contractor shall deliver the signs back to the City upon Final Acceptance of the contract. The work associated (including the time to pick-up, maintenance, relocate to each project segment, and
WARD 2 – WARD 6 AREA MILL & FILL
return the signs to the City) shall be incidental to the cost of the work. Sign stands for these signs shall be paid under Item 7010005.
5. Striping
It is the Contractor’s responsibility to as-built existing stripe layout prior to the milling operations.
The Contractor shall coordinate with the Engineer for final layout configuration prior to replacing all striping, symbols and legends.
6. Staging Area
Identification of equipment, materials storage/stockpiling and Contractor/Sub-contractor parking shall be the responsibility of the Contractor. The Contractor shall provide the Engineer with a copy of the written approval of the property owner indicating that the property owner is fully aware and agreeable to said equipment, materials storage/stockpiling, and Contractor/Sub-contractor parking.
This written approval is to be provided to the Engineer prior to commencement of the work.
No work shall be allowed to commence unless the requirements of this specification section are adhered to. Failure of the contractor to abide by this specification section shall be grounds for the City to suspend work.
7. Shoulder Grading
Because of the type of work being proposed and the elevation change to the existing pavement is minimal, it is not anticipated that any shoulder grading, other than areas of erosion to be verified by the City for which a borrow item shall be used, will be required. If the construction operation results in minor gaps between the new pavement and the existing shoulder, any filling of this minor gap shall be considered incidental to the other items of construction and shall not be measured or paid separately.
8. Match Existing
The existing pavement to be milled shall be replaced to maintain the cross slope and profile of the existing pavement; therefore, a clean, smooth edge shall be provided between those areas being milled and overlaid and areas of existing paving. A vertical saw cut shall be provided at the match lines for existing and proposed mill and overlay areas. The vertical saw cut surfaces should be cleaned and tack coated for adhesion prior to the placement of the new overlay.
9. Construction Survey and GPS Documentation
The Contractor shall provide GPS documentation of utilities within the pavement. The survey
GPS data shall be in the most recent State Plane Coordinates (NAD 1983 State Plane Arizona, Central) and will be gathered using survey quality equipment, and accurate to within 0.5-feet. This data will be provided to the City of Tucson. The basis of coordinates will be included. This data will be categorized by street segment and labeled with street names and supplied in either raw data in text or an Excel workbook format. The format will include coordinates in northings and eastings and each point shall contain a description of the utility appurtenance: all water & gas valves, monitor wells, sewer manholes & clean outs, communication manholes, and so forth. These structures shall be documented by GPS methods before they are lowered. The surveying/GPS documentation of the utility appurtenances shall be considered incidental and included in the respective pre-lowering utility item. This work shall be considered incidental to the other items of construction and shall not be measured or paid separately.
WARD 2 – WARD 6 AREA MILL & FILL
The City’s surveyor will be required to cross-section the roadway prior to the treatment in order to be able to provide the contractor information to grade to.
DTM forces will perform survey for monument and project layout.
10. Construction Surveillance
DTM forces, including consultant inspectors, shall perform the inspection of the Contractor’s work. Assistance may be provided by the Field Engineering inspection staff.
11. Coordination of Residential Garbage and Recycling Services
Before undertaking work at any location covered by this project, the Contractor shall coordinate with City of Tucson Environmental Services (ES) to coordinate continuous weekly residential garbage and recycling services for the duration of construction. Damage to the pavement caused by Brush and Bulky equipment activity due to improper scheduling on the part of the contractor shall be repaired in a manner acceptable to the City at no cost to the contract.
In addition, the Contractor shall address the City of Tucson Environmental Services Brush and Bulky
Material Collection in the project schedule and sequence all work, at any location covered by this project, to be complete at least one month in advance of the next bi-annual Brush and Bulky
Material Collection. The Brush and Bulky Material Collection schedule is available at the following website: https://www.tucsonaz.gov/es/brush-and-bulky
12. Erosion Control Measures
This project exceeds 1 acre. The Contractor shall implement the Arizona Department of Environmental Quality (ADEQ) requirements for protecting the quality of stormwater runoff during construction, as specified under the Arizona Pollutant Discharge Elimination System (AZPDES) General Permit for Construction Activities.
The construction activities are considered “Exempt Discharges” under AZPDES General Permit for
Construction Activities, Part 1.D.6.b. However, efforts to prevent pollutants from discharging from the project must be utilized by providing, installing, maintaining, removing and disposing of erosion control measures including, but not limited to, such items as gravel filter berms, dikes, catch basin inlet protection, end-of-pipe filtering devices, silt fences, dams, sediment basins, netting, straw bale barriers, slope drains, and other erosion control devices or methods.
The Contractor shall not be required to prepare a Stormwater Pollution Prevention Plan (SWPPP) but shall follow Best Management Practices in accordance with t h e A Z P D E S General Permit for Construction Activities, in conjunction with the DTM Construction Project Manager and Pima County’s Stormwater Management Section.
A Notice of Intent (NOI) and Notice of Termination (NOT) shall not be required.
There shall be no separate pay items for providing ‘good housekeeping’ practices, the cost being considered as included in the price of the other items.
13. Pre-lower Water Valve Box and Cover; Manhole and Cleanout (Sanitary Sewer); and Survey Monument
The Contractor shall survey/locate all manholes, water valve boxes by GPS and record all items prior to their removal. This information shall be provided to DTM, Tucson Water Operations staff, https://www.tucsonaz.gov/es/brush-and-bulky
WARD 2 – WARD 6 AREA MILL & FILL
and to the PCRWRD Field Engineering Staff and prior to beginning the milling operations.
Steel plates of a size appropriate for the utility to be lowered shall be used over the water valve riser or the manhole opening. Survey monuments concrete shall be removed. A sufficient thickness of temporary asphalt concrete shall be placed and compacted within the void created by the item removal or pre-lowering so that no damage to the utility valve or manhole and equipment used during the milling, grading and paving operations occurs.
The contractor shall install new survey monuments (PC/COT Detail 103, 1 of 3) to the final pavement grade elevation.
There shall be no separate pay items for pre-lowering water valve box and cover; manhole and cleanout (Sanitary Sewer); and survey monuments, the cost being considered as included in the price of the adjustment/reset items.
There shall be no separate pay item for concrete collars, the cost being considered as included in the price of the adjustment/reset items.
14. Storm Drain and Utility Manholes
If the new roadway surface causes the existing storm drain and utility manholes to be depressed by
0.04 Ft. or more, as determined by the Engineer or designated representative, the existing manholes shall be adjusted to the new finish grade in accordance with the requirements of the Standard Specifications and as modified for this contract.
Vaults, communications and electric manholes which cannot reasonably be lowered in advance of milling shall be protected in place and avoided. Avoidance shall be considered incidental to the contract.
15. Speed Humps and Speed Tables
Use bid item number 4060200 for speed hump and 4060201 for speed table payment. Asphalt for the speed humps and speed tables is incidental to the speed hump and speed table bid items. The asphalt mix design for the speed humps and tables shall be approved by the engineer prior to installation.
Speed hump and speed table signs and object markers as indicated on the speed hump and speed table details are not required on this contract. The Contractor, if the milling equipment permits the removal, can use the milling operation to remove the speed humps, but the speed hump existing appurtenances shall remain in-place (i.e., object markers and speed hump ahead signs).
No separate measurement or payment will be made for pavement markings, chevron striping, and raised pavement markers installed as part of each speed hump or speed table, the cost being considered included in the price of the speed hump and speed table bid item.
16. Type F Reflective Pavement Markers
There shall be no separate pay item for Type F, Blue, Two-Way Reflective Pavement Markers, used to identify fire hydrant and fire connection locations, the cost being considered as included in the price of the contract bid items.
17. Raised Pavement Markers
The list of approved manufacturers for bituminous adhesive may be found on the ADOT’s approved products list at: http://www.azdot.gov/tpd/atrc/apl/APL.asp http://www.azdot.gov/tpd/atrc/apl/APL.asp
WARD 2 – WARD 6 AREA MILL & FILL
The contractor shall submit to the project inspector, or designated representative, certificates of compliance for each type and batch of reflective pavement markers, in accordance with the provisions of 106-5 (B) of the Standard Specifications for Public Improvements.
18. Remove Asphaltic Concrete Pavement (By Milling)
This item will require asphalt mill, sweep as needed, tack as needed, and patched as needed with asphalt concrete. The City does not guaranty any contamination of the millings due to AC thickness or milling widths that are outside edge of pavement. Contractor shall haul off millings. In some circumstances, with prior approval from DTM Project Manager, the contractor may be able to place, grade, and compact millings along the shoulder provided the millings are blended with the existing soil to change the color of the millings to match the surrounding soil and will not impede natural flow of existing drainages.
Milled surfaces must be repaved within 24 hours. The Contractor shall maintain the milled surface until repaving occurs.
19. Removal of Structures and Obstructions
Items included in item 2020001 Removal of Structures and Obstructions, includes but not limited to: debris on existing sidewalks, header, curb, ramps, concrete slabs, and sidewalk.
No separate measurement or payment will be made for the removal of curb (various types) or concrete ramps, sidewalk, or slabs; the cost being considered included in the price of Item 2020001 Removal of Structures and Obstructions. Removal estimations are based on the footprint of a new standard ramp and minimum removal of adjacent sidewalk for tie-ins (approximately one sidewalk panel on each side).
20. Sawcutting
Contractor to sawcut existing sidewalk for new ramps and existing pavement for new tack joints.
No measurement or direct payment will be made for sawcutting, the cost being considered as included in the price of the contract items.
21. Tack Coat
There shall be no separate pay item for Tack Coat, the cost being considered as included in the price of the contract bid items.
22. Miscellaneous Landscape Work Allowance
Items included in item 8080111 Miscellaneous Landscape Work Allowance, includes but not limited to: weed removal, landscape pruning, and herbicide applications outside the pavement area.
23. Quality Control
Quality Control is the sole responsibility of the contractor. Please note the contractor responsibilities including, but not limited to, designating a Quality Control Manager and discussing control of materials at the pre-construction conference.
24. Incidental Items Allowance
Items included in item 9300100 Incidental Items Allowance, includes but not limited to: replacement
WARD 2 – WARD 6 AREA MILL & FILL
water meter boxes, replacement pull boxes, relocation or replacement of street signs, etc.
SECTION 106 - CONTROL OF MATERIAL
106-4 Tests and Acceptance of Materials: of the Standard Specifications is modified to add:
106-4.01 General. The contractor is responsible for quality control measures necessary to provide acceptable quality in production, handling, and placement of all materials. The contractor shall provide all the personnel, equipment, materials, supplies, and facilities necessary to obtain samples and perform tests listed in the applicable section. Quality Control shall meet the requirements per the TDOT Materials Quality Assurance Program Sampling Guide Schedule. All testing shall be performed by a laboratory listed for the tests to be performed in the ADOT Directory of Approved Materials Testing Laboratories, meeting the requirements of “System for the Evaluation of Testing Laboratories.”