Contractor_Responsibilty_Form.pdf

PDF 169 KB Posted

Attached to
Prop 411 Wards 2 & 6 Mill and Fill
Solicitation number
250042
Issued by
Pima County, Tucson City, Arizona

About this file

This is a Contractor Responsibility Form required by the City of Tucson, Arizona for the Proposition 411 Wards 2 & 6 Mill and Fill project (IFB No. 250042). The apparent low bidder must complete and submit the form by 4:00 p.m. local time on the fifth full business day following bid opening and notification of apparent low bidder status. The project involves comprehensive street resurfacing and infrastructure improvements across nine neighborhoods, encompassing approximately 17.87 centerline miles and 342,017 square yards of roadway treatment, including milling and replacing existing asphalt, constructing 169 ADA-compliant curb access ramps, installing 25 speed humps, and replacing 2 speed tables. Contractors must complete the project within 240 consecutive calendar days from the notice to proceed. A pre-bid meeting was scheduled for Monday, October 21, 2024, at 2:00 p.m., with final bids due on Wednesday, October 30, 2024, at 2:00 p.m. Arizona local time.

The form requires contractors to certify their responsibility by demonstrating adequate financial resources, ability to meet delivery and performance schedules, satisfactory performance records, demonstrated integrity and ethics, adequate experience, technical expertise, and quality controls. Contractors must disclose any prior debarment, suspension, or criminal convictions within the preceding three years; report liquidated damages, contract terminations, claims for improper work, payment disputes, and bond claims from the past three years; and provide current Experience Modification ratings and descriptions of three representative projects with owner references, project values, and schedule information. The City of Tucson reserves the right to contact references and solicit additional information to verify contractor responsibility. Failure to provide sufficient explanation or complete certification may result in a non-responsible determination, and any knowingly erroneous statements in the certification may result in contract termination.

View the file

Other files

File Type Posted
Prop_411_Wards_2_&_6_Mill_and_Fill.pdf PDF
Prop_411_Wards_2_&_6_Mill_and_Fill.pdf PDF
IFB_250042_Bid_Schedule.xlsx XLSX spreadsheet
IFB_250042_SBE_Provisions.pdf PDF
IFB_250042_Special_Provisions.pdf PDF
Standard_Specifications_for_DTM.pdf PDF
Standard_Specifications_for_DTM.pdf PDF
IFB_250042_Bid_Schedule.xlsx XLSX spreadsheet
IFB_250042_SBE_Provisions.pdf PDF
IFB_250042_Special_Provisions.pdf PDF
Offer_and_Acceptance_Page.pdf PDF
Contractor_Responsibilty_Form.pdf PDF
Offer_and_Acceptance_Page.pdf PDF
COT_ARPA_Terms_and_Conditions.pdf PDF
COT_ARPA_Terms_and_Conditions.pdf PDF
HUD-5370.pdf PDF
HUD-5369.PDF PDF
HUD-5370.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx XLSX spreadsheet
Prop_411_Phase_1_Ward_2_-_Ward_6_Est_2024-09-19.pdf PDF
HUD-5369.PDF PDF
Prop_411_Goal_Memo_FY25.pdf PDF
Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx XLSX spreadsheet
Prop_411_Phase_1_Ward_2_-_Ward_6_Est_2024-09-19.pdf PDF
Prop_411_Goal_Memo_FY25.pdf PDF
Standard_Specifications_notice.docx DOCX document
Prop_411_Phase_1_Ward_2_-_Ward_6_SP_2024-09-19.pdf PDF
SBE_Commitment_form.doc DOC document
Prop_411_Phase_1_Ward_2_-_Ward_6_SP_2024-09-19.pdf PDF
SBE_Commitment_form.doc DOC document
Standard_Specifications_notice.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR RESPONSIBILITY INFORMATION (2 pages)

The Apparent Low Bidder must complete and submit this form by 4:00 p.m. local time on the fifth (5th) full business day after bid opening and notification of Apparent Low Bidder.

A.R.S. Title 34 requires an agent to contract with the lowest responsible bidder. To be deemed responsible, a contractor must have adequate financial resources, the ability to meet delivery/performance schedules, a satisfactory performance record, demonstrated integrity/ethics, adequate experience, technical expertise and quality controls, and access to necessary equipment. The City of Tucson has processes in place to ensure that contractors engaged with the City meet required standards for award of contract. These include reviews of bids and inquiries to the State of Arizona Registrar of Contractors (AZROC), as well as review of the information requested below. Contract Officers may solicit additional information from or about the Contractor.

Please complete the following:

Company Name (“Contractor”):_____________________________________________________________

Project Name and Solicitation Number: ___________________________________________________

Contractor certifies, to the best of its knowledge and belief, that—

Contractor and/or any of its Principals—

(A) Are [___] are not [___] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any agency.

(B) Have [___] have not [___], within the three-year period preceding this certification, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property.

Certification of Prior Contract Performance

Please respond “Yes” or “No” as applicable for the following questions, for any “Yes” responses, provide additional detail. In the last three (3) years -

Has Contractor paid liquidated damages on any contracts? Yes [ ] No [ ]

Has Contractor been terminated on a project for poor performance? Yes [ ] No [ ]

Has a claim been made against Contractor for improper, delayed or Yes [ ] No [ ] non-compliant work or failure to meet warranty obligations?

Has a formal legal action been filed against Contractor Yes [ ] No [ ] asserting that Contractor failed to make payments to anyone? If so, describe the outcome or current status.

Has a successful claim been made against a Bid, Performance, or

Payment Bond supplied by Contractor in connection with a project? Yes [ ] No [ ]

250042- Prop 411- Wards 2 & 6 Mill and Fill

Provide current Experience Modification (EMod) Rating: _______ (Additional documentation may be requested)

Describe three (3) representative projects completed by Contractor that are similar to the scope of work for this Project. Include the following information for each of the three (3) projects:

• Name and location of the Project

• Owner References including contact information. The City reservices the right to contact the references provided.

• Description of work performed by Contractor

• Description of any specialty subcontractors and their scope of work

• The Total Project Value, including the original amount and final amount and a description of Change Orders, if applicable.

• The Original Construction Schedule and Actual Construction Schedule, including a description of discrepancies, if applicable.

Is Contractor currently, or do you have reason to expect Contractor will be subject to legal action or bankruptcy proceedings that could materially impact Contractor’s ability Yes [ ] No [ ] to perform the Project?

List current workload and % of availability of resources (personnel and equipment) that you intend to use to complete the Project by the fixed delivery date for the Project. It may be advantageous to identify key personnel and equipment availability by date, if not currently available, in order to support a claim that work can be completed in the time allotted.

***Additional Qualifications may be included as necessary*** (NOTE TO CONTRACT OFFICER: Add the additional quals, if applicable, and then delete this internal note.)

NOTE: Additional pages may be attached to support or explain any item on this certification. Failure to provide sufficient explanation of any item on this certification may result in the City being unable to reach a favorable responsibility determination.

By signing below, you acknowledge that this certification will be considered in connection with a determination of Contractor’s responsibility, that the obligation to demonstrate responsibility is on Contractor, and that, although the City reserves the right to make additional inquiries, it is not obligated to do so in the absence of sufficient supporting information. Failure to furnish a certification or provide any additional information requested the City of Tucson Contract Officer may result in Contractor being found Non-Responsible.

This certification is a material representation of fact upon which the City will rely when making this award. If it is later determined that Contractor knowingly made an erroneous factual statement in this certification, the City may, in addition to any other available remedies, terminate the contract resulting from this solicitation.

SIGNATURE: DATE:

PRINTED NAME & TITLE: