This document is an Engineer's Opinion of Probable Cost prepared by the City of Tucson for Proposition 411 Phase 1 Ward 2-Ward 6, a comprehensive street resurfacing and infrastructure improvement project managed by Project Manager Tim Rhine, P.E. The project encompasses mill and fill operations across approximately 342,017 square yards of roadway spanning nine neighborhoods including Venice Addition, Glenn Heights, Carlos Terrace, Rose Hill, Palo Verde/Cloverleaf, Warsaw/Cloverleaf, Swan Way, and Speedway Addition. Major work items include removal of existing bituminous pavement by milling, roadway grading, placement of aggregate base and asphaltic concrete mix, installation of 25 speed humps and 2 speed tables, construction of 169 curb access ramps, adjustment of 229 sewer cleanouts and 349 potable water valve boxes, pavement markings, and complete traffic control operations. The pre-bid meeting is scheduled for October 21, 2024, at 2:00 pm, with bids due on October 30, 2024, at 2:00 pm. Contractors must complete the entire project within 240 consecutive calendar days from notice to proceed.

The Engineer's Opinion of Probable Cost totals $10,314,917, with primary cost drivers being asphaltic concrete placement at $4,745,500 for 37,964 tons of Mix No. 2, mobilization at $650,000, bituminous material price adjustment allowance of $474,550, traffic control at $300,000, and curb access ramp construction at $741,600. The project requires a 4% Small Business Enterprise participation goal with identified subcontracting opportunities in concrete, underground utility, traffic control, and trucking. Performance and payment bonds equal to 100% of the contract amount are required. Liquidated damages are assessed at $2,790 per calendar day of delay. The project is funded through Proposition 411 and incorporates federal compliance requirements including domestic preference provisions and equal opportunity guidelines. Contractors must provide comprehensive insurance coverage including commercial general liability, commercial automobile liability, and worker's compensation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency : City of Tucson Project Description :

Project No : - Project Location :

Project : Prop 411 Phase 1 Ward 2 - Ward 6 Bid Advertisement : TBD

Date: September 16, 2024 Project Manager : Tim Rhine, P.E.

ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT

1100201 PAVEMENT DEFICIENCY CREDITS - NO BID

2020001 REMOVAL OF STRUCTURES & OBSTRUCTIONS L.S. 1 196,635.00$ 196,635$

2020029 REMOVAL OF BITUMINOUS PAVEMENT (BY MILLING) S.Y. 342,017 2.50$ 855,043$

2050004 ROADWAY GRADING (DISCRETIONARY) S.Y. 342,017 1.00$ 342,017$

3030003 AGGREGATE BASE (DISCRETIONARY) C.Y. 4,800 50.00$ 240,000$

4060012 ASPHALTIC CONCRETE (MIX NO. 2) TON 37,964 125.00$ 4,745,500$

4060014 ASPHALTIC CONCRETE (CRACKS BETWEEN 1" AND 3") (DISCRETIONARY) TON 380 500.00$ 189,820$

4060015 ASPHALTIC CONCRETE (MISC PVMT PATCHING) (DISCRETIONARY) TON 1,139 140.00$ 159,449$

4060200 ASPHALTIC CONCRETE (SPEED HUMP) EACH 25 3,500.00$ 87,500$

4060201 ASPHALTIC CONCRETE (SPEED TABLE) EACH 2 4,500.00$ 9,000$

4060510 BITUMINOUS MATERIAL PRICE ADJUSTMENT ALLOWANCE L.S. 1 474,550.00$ 474,550$

5090110 SEWER MANHOLE/CLEANOUT, ADJUSTMENT EACH 229 1,250.00$ 286,250$

5103101 POTABLE WATER, ADJUST VALVE BOX AND COVER EACH 349 750.00$ 261,750$

7010005 TRAFFIC CONTROL L.S. 1 300,000.00$ 300,000$

7010025 FLASHING ARROW PANEL EA/DAY 480 25.00$ 12,000$

7010027 CHANGEABLE MESSAGE BOARD EA/DAY 480 60.00$ 28,800$

7040005 PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") L.F. 18,790 1.50$ 28,185$

7040006 PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") L.F. 23,590 1.50$ 35,385$

7040130 PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) TRANSVERSE) (0.090") L.F. 2,810 1.75$ 4,918$

7050090 PAVEMENT MARKING, PREFORMED, TYPE I, SYMBOL EACH 19 130.00$ 2,470$

7060025 PAVEMENT MARKER, REFLECTIVE, (TYPE D, YELLOW, TWO-WAY) EACH 594 15.00$ 8,910$

7080001 PAINTED PAVEMENT MARKING EACH 45,190 0.40$ 18,076$

7080100 PAVEMENT MARKING (PORTLAND GREEN PERMANENT PAINT) S.Y. 154 20.00$ 3,080$

8080111 MISCELLANEOUS LANDSCAPE WORK ALLOWANCE USD 40,000 1.00$ 40,000$

9010001 MOBILIZATION L.S. 1 650,000.00$ 650,000$

9080001 CONCRETE CURB, (STD. DTL. 209) (TYPE 1) L.F. 281 35.00$ 9,835$

9080005 CONCRETE CURB, (STD. DTL. 209) (TYPE 2) L.F. 198 35.00$ 6,930$

9080006 CONCRETE WEDGE CURB (STD. DTL. 209) L.F. 2,113 35.00$ 73,955$

9080040 CONCRETE CURB (RAMP CURB) L.F. 3,672 30.00$ 110,160$

9080201 CONCRETE SIDEWALK S.F. 10,140 20.00$ 202,800$

9080290 CURB ACCESS RAMP S.F. 18,540 40.00$ 741,600$

9090031 SURVEY MONUMENT, RESET FRAME AND COVER EACH 167 900.00$ 150,300$

9300100 INCIDENTAL ITEMS ALLOWANCE USD 40,000 1.00$ 40,000$

$10,314,917TOTAL CONTRUCTION COST

CITY OF TUCSON

PROP 411 PHASE 1 WARD 2 - WARD 6

ENGINEER'S OPINION OF PROBABLE COST

Phase 1

Tucson, Arizona

Prop 411 Phase 1 Ward 2 - Ward 6 Est_2024-09-16.xlsx Engr Estimate 1 of 1

File details come from the government source that posted it. Updated .